SLED Opportunity · FLORIDA · CITY OF LAUDERHILL

    Addendum 2 (CONTINUING PROFESSIONAL SERVICES (CCNA

    Issued by City of Lauderhill
    cityRFQCity of LauderhillSol. 515
    Closed
    STATUS
    Closed
    due May 7, 2026
    PUBLISHED
    Apr 6, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    541330
    AI-classified industry

    AI Summary

    City of Lauderhill RFQ for continuing professional services under CCNA seeking engineering and consulting firms in multiple disciplines including civil, structural, environmental, and architectural services.

    Opportunity details

    Solicitation No.
    515
    Type / RFx
    RFQ
    Status
    Issued
    Level
    city
    Published Date
    April 6, 2026
    Due Date
    May 7, 2026
    NAICS Code
    541330AI guide
    Jurisdiction
    City of Lauderhill
    State
    Florida
    Agency
    City of Lauderhill

    Description

    I. STATEMENT OF THE WORK The City of Lauderhill, Florida, hereinafter referred to as CITY, will receive sealed Letters of Interest (L.O.I.) together with the Qualifications Statement and completed Forms included herein and any other information relative to the experience, expertise, or proficiency of the Firm, at the office of the City Clerk, 5581 W Oakland Park Blvd. Suite 421, Lauderhill, Florida 33313, for furnishing the services under the “Miscellaneous Professional Services” as described in the categories and disciplines below. Pursuant to Florida Statutes, Chapter 287.055 (Consultants Competitive Negotiations Act or CCNA) and Lauderhill City Code, Section 2-141(b), Professional Services, the City of Lauderhill seeks to identify Engineering and Professional Consulting Firms with substantial experience and capabilities to provide services in the categories listed below. This RFQ is requested of professional firms in order to negotiate a general agreement for services. Individual projects will be assigned to the successful proposer(s) by negotiated Work Orders. Firms may submit on any one category or up to three (3) categories maximum for consideration. · Roadway, Traffic and Transportation · Land Development, Civil-Site and Drainage Systems · Electro-Mechanical and Instrumentation Control · Structural Engineering · Water Treatment and Water Distribution · Wastewater and Lift Stations · Hydrogeology and Environmental Engineering · Landscape Architecture · Architectural Design · Surveying and Utility Locates · Construction Inspection · Instrumentations and SCADA Systems · Cost Estimating/Value Engineering --- Q&A --- Q1: For the proposed service rates, do we need to fill out each role even if we don't anticipate using them? A1: Please note that this form is not required at the time of proposal submittal. It will be requested from the awarded vendor(s) at a later stage in the process. Submitted: 4/20/2026 11:45:39 AM (ET) Q2: Regarding Tab #4, Bullet 3: “Demonstrate ability to complete miscellaneous design and/or consultation work in a timely fashion. Describe internal processes for project setup, as well as QA/QC and project management policies implemented by the firm during project development (3 pages maximum).” Could you please clarify whether the 3-page maximum applies only to Bullet 3, or to all of Tab #4? A2: Tab 3 Submitted: 4/17/2026 03:49:29 PM (ET) Q3: For Tab 4, items f, g, and h (f. Amount of your initial contract award; g. Total number and value of change orders during construction; h. Final cost of the entire project), can the City clarify if those costs should be for the consultant's costs only, of are any of these expected to include the construction cost of the project? A3: For Tab 4, items (f), (g), and (h), the requested amounts should reflect the overall project costs, including construction, not just the consultant’s fees. This information helps the City evaluate the scale and complexity of projects your firm has successfully supported. If available, you may also include the consultant’s portion separately for additional clarity; however, the primary intent is to capture the total project value. Submitted: 4/17/2026 11:40:27 AM (ET) Q4: Regarding the attachment titled “Proposed Service Categories and Fee” included with the RFQ, could you please clarify whether this document is intended to be completed and submitted after award? Based on CCNA guidelines, we understand that this information should not be filled out prior to award. A4: Please check the message that was sent to all suppliers regarding this form. Submitted: 4/16/2026 03:16:30 PM (ET) Q5: Is there any small business consideration toward this contract? If yes, must the firm be registered as a small business with Broward County to qualify? A5: NO Submitted: 4/16/2026 10:24:38 AM (ET)

    Key dates

    1. April 6, 2026Published
    2. May 7, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.