SLED Opportunity · TEXAS · CITY OF GEORGETOWN
AI Summary
The City of Georgetown seeks bids for the reconstruction of D B Wood Road Phase IIA, upgrading it to a four-lane divided roadway with sidewalks, storm sewer, illumination, and other infrastructure. Bids due July 8, 2026, with a pre-bid meeting on June 25, 2026, held virtually.
Addendum No. 2 Addendum No. 1 The City of Georgetown is accepted sealed bids for the construction project: D B Wood Road Phase IIA The project consists of furnishing, installing and providing all labor and materials required for for the reconstruction of D B Wood Road from Oak Ridge Road to just North of Cedar Breaks Road. Construction includes upgrading the existing two-lane undivided road to a four-lane divided roadway, sidewalk, storm sewer, illumination, signing, pavement markings, culvert replacement and miscellaneous items, as more fully described in the Drawings. Bids may be electronically submitted through the City E-bid system accessible via City’s web site at https://gtowntx.ionwave.net/Login.aspx on or before July 8, 2026 at 2:00 PM and immediately thereafter publicly opened and read aloud. Questions regarding use of the E-bid System may be directed by email to: nicole.abrego@georgetowntexas.gov Sealed bids may be received by the City of Georgetown in the Georgetown Municipal Court, Purchasing Department, at 510 W. 9th Street, Georgetown, Texas 78626. Bidders submitting bids through the E-bid System shall scan and up-load a copy of their Bid Security (sealed Bid Bond, Certified Check or Cashier’s Check ) as an attachment to their electronic bid. Original documents for Bid Security will be requested by the City from the lowest two bidders and delivered to the City’s Purchasing Buyer within 48 business hours of the Bid Opening. Bid Security shall be postmarked and mailed to: City Purchasing Office, Georgetown Municipal Court, 510 W. 9th Street, Georgetown, Texas 78626. PUBLIC CLOSING will be held by virtually. This is accessible using the link and call in information provided below: https://teams.microsoft.com/meet/247838599348244?p=qO6ni24iSKtqaHeeUt PREBID MEETING will be held by Microsoft Teams. This is accessible using the link and call in information provided below: A non-mandatory pre-bid conference for this project will be held on Thursday, June 25, 2026, at 10:00 a.m. virtually on teams at the link below: https://teams.microsoft.com/meet/247838599348244?p=qO6ni24iSKtqaHeeUt. The project site will be available for inspection by prospective bidders immediately following the pre-bid conference. --- Q&A --- Q1: Engineer to provide specific pavement information and binder clarification for each layer of pavement section to be constructed? A1: The proposed pavement section is shown on the proposed typical section sheet (Sheet 9). Contractor to also reference the geotechnical pavement report provided with Addendum #1. The city specification SD1 should be referenced for pavement requirements for Hot Mix Asphaltic Concrete Pavement. Production or placement bonuses will not be applicable for this project. No pay adjustments for Ride Quality will be applicable on this project. The pavement section should be: · 2 IN TY-C HMAC (PG 76-22) · 6.5 IN TY-B HMAC (PG 64-22) · 11” Flexbase (Type A, Grade 1-2) · 6” Moisture Conditioned Subgrade Submitted: 7/2/2026 09:59:14 AM (CT) Q2: There is a bid item for "Plane Asphalt Concrete" with a depth of 0-2 inches. Can you verify what is to be priced in this bid item? A2: This is for the proposed milling from STA 175+20 to STA 184+50 and from STA 212+80 to STA 217+60. Submitted: 6/29/2026 04:19:59 PM (CT) Q3: The plans call to construct a 2" mill and overlay from the start of the road to station 2+17.60. However, there is no bid item to price the mill and overlay. Can you help provide this missing bid item? A3: Proposed mill and overlay should be performed from STA 175+20 to STA 184+50 and from STA 212+80 to STA 217+60. Item 354-7032 PLANE ASPH CONC PAVE (0" TO 2") is for the mill. Payment for the 2" overlay is included with Item SD1-TY C. Submitted: 6/29/2026 03:55:06 PM (CT) Q4: The plans show two proposed driveways around station 200+00, but no clarification on what pavement will be in this area can you confirm this missing information? A4: Driveways 4-1, 4-2 and 5-1 are to be High Early Strength Concrete Driveways. Driveway 6-1 is to be a proposed gravel driveway. See Miscellaneous Driveway Detail Sheet 92 for driveway sections. Submitted: 6/29/2026 03:08:48 PM (CT) Q5: With no proposed contours provided with the CAD and the plans are we to assume that we will overcut from existing to place the proposed base and hmac? A5: Contractor to reference cross sections provided to see proposed construction. Submitted: 6/29/2026 03:02:52 PM (CT)
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.