SLED Opportunity · KANSAS · JOHNSON COUNTY

    Addendum 2 (Johnson County Library (JCL) Cedar Roe Restroom Remodel Project

    Issued by Johnson County
    countyInvitation for BidJohnson County Sol. 1976
    Closed
    STATUS
    Closed
    due Jan 20, 2026
    PUBLISHED
    Dec 23, 2025
    Posting date
    JURISDICTION
    Johnson County
    county
    NAICS CODE
    236118
    AI-classified industry

    AI Summary

    Invitation for Bid for Johnson County Library Cedar Roe Restroom Remodel Project including plumbing, flooring, tile, drywall, electrical, and lighting improvements to enhance ADA compliance and update infrastructure. Bids due January 20, 2026.

    Opportunity details

    Solicitation No.
    1976
    Type / RFx
    Invitation for Bid
    Status
    Issued
    Level
    county
    Published Date
    December 23, 2025
    Due Date
    January 20, 2026
    NAICS Code
    236118AI guide
    Jurisdiction
    Johnson County
    State
    Kansas
    Agency
    Johnson County

    Description

    Sealed bids for Bid Request No. 2025-049 for the Johnson County Library (JCL) Cedar Roe Restroom Remodel Project shall be submitted electrically via IonWave at https://jocogov.ionwave.net until the close date reflected above. At that time, all bids that have been duly received will be publicly read aloud via Zoom Video Conferencing at: https://us02web.zoom.us/j/84629183577?pwd=x7is3lgpuwCOPSUa811Lma5smcsBLx.1 Meeting ID:846 2918 3577 Passcode: 371818 This bid includes the following Work: Improvements to the JCL Cedar Roe restrooms will improve ADA compliance, cleanability, and outdated infrastructure. The Work involves new plumbing, flooring, tile, drywall, electrical, and lighting. This scope includes all materials, labor, equipment, supervision, and any and all other items necessary to complete the Work. Copies of the Project Manual and Drawings are available through IonWave at https://jocogov.ionwave.net/SourcingEvents.aspx?SourceType=1 or can be downloaded for a non-refundable fee online at https://planroom.drexeltech.com/ in Drexel Tech's eDistribution public jobs plan room; additional assistance is available at distribution@drexeltech.com. A Non-Mandatory Pre-Bid Conference and Site Visit will be held at 2:00PM CT on January 6, 2026, at the Johnson County Library Cedar Roe Branch located at 5120 Cedar Street, Roeland Park, Kansas 66205. Attendance is encouraged for those interested in this Project. Please gather near the front entrance. Technical questions and requests for clarification shall be submitted via IonWave no later than 5:00PM CT on January 13, 2026, to allow adequate time to issue an addendum, if needed. Bidders shall submit the following with their bid: Bid Bond: Bidders shall submit with their bid a bid bond issued by a surety company licensed to do business in the State of Kansas in the amount of five percent (5.0%) of the total amount of their bid. Said guarantee shall be made payable to the Board of Directors of the Johnson County Library. No bid may be withdrawn within a period of sixty (60) days from the date of the bid opening. --- Q&A --- Q1: Is Hollow Metal an acceptable alternate for Wood Frame and Trim lite Kit that is specified? A1: No, hollow metal is not considered an acceptable alternate. Submitted: 1/13/2026 12:57:38 PM (CT) Q2: Can you provide more information on the metal stud kickers off the top of the wall to the deck? Stud size? Gauge thickness? A2: Kickers: Match the wall framing stud size, gauge, and thickness. The kickers are to brace the top of wall until the ceiling framing is installed. Submitted: 1/12/2026 08:57:29 AM (CT) Q3: What is the specified R Value for the wall insulation? A3: No insulation is specified for any walls or partitions. Submitted: 1/12/2026 08:56:55 AM (CT) Q4: Blueprint page ME201 - What size is the existing sewer line that is is requested to be replaced? What material will be required if JOCO wastewater is inspecting this outside work? A4: Johnson County will be contracting the work indicated by "Mechanical Plan Notes" 1 and 2 and ME201. Please refer to Addendum No. 2 for this clarification. Submitted: 1/12/2026 08:37:37 AM (CT) Q5: Will this project be phased? A5: No, this project is not intended to be phased. Submitted: 1/12/2026 08:34:24 AM (CT)

    Key dates

    1. December 23, 2025Published
    2. January 20, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.