SLED Opportunity · MISSOURI · LINCOLN COUNTY

    Addendum 2 (North 56th Street Pump Station

    Issued by Lincoln County
    countyNotice to BiddersLincoln CountySol. 17478
    Closed
    STATUS
    Closed
    due Feb 27, 2026
    PUBLISHED
    Jan 23, 2026
    Posting date
    JURISDICTION
    Lincoln County
    county
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    Lincoln County, Missouri seeks bids for construction services related to the North 56th Street Pump Station project. The contractor is responsible for SWPPP inspections and generator installation warranty exclusions apply. Flood insurance is not required as the project is outside the 100-year floodplain.

    Opportunity details

    Solicitation No.
    17478
    Type / RFx
    Notice to Bidders
    Status
    Issued
    Level
    county
    Published Date
    January 23, 2026
    Due Date
    February 27, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    Lincoln County
    Agency
    Lincoln County

    Description

    If you need assistance in preparing your bid, 1) Click the "Help" button in the upper right hand corner of any screen; or 2) Contact our office at 402-441-8103 to assistance over the phone. --- Q&A --- Q1: Is it possible to have the cut off date for questions extended since the bid closing date has been exteneded? A1: The Question Cut Off Date / Time has been extended to 2/17/2026 2:00 PM CT. Submitted: 2/12/2026 12:37:25 PM (CT) Q2: Who is responsible for the SWPPP inspections and reporting? Please advise. A2: The Contractor is responsible for inspection and reporting for SWPPP. Submitted: 2/10/2026 12:49:39 PM (CT) Q3: The Builder’s Risk section of the Contractual Insurance Result Guide mentions “flood and earth movement/earthquake” under the "B. Coverage" paragraph. Is flood insurance required for the project? If so, there are portions of the project that are in the flood zone X and flood insurance is not available for work in those areas. A3: The project is not within the 100-yr floodplain. Submitted: 2/9/2026 11:41:46 AM (CT) Q4: Please confirm that the general contractor warranty does not apply to the owner-provided generator. A4: This statement is correct, the general contractor's warranty does not apply to the owner furnished equipment provided the generator is installed per the manufacturer's requirements and manufacturer has signed off on the installation. The installation check by the manufacturer is the responsibility of the generator supplier. Submitted: 2/9/2026 09:24:02 AM (CT) Q5: Please confirm the owner and generator supplier are responsible for all consumables for the generator, such as fuel, oil, grease, etc. A5: Through the procurement agreement with generator supplier, the generator supplier is required to provide all lubricants and fuel for field testing the generator. The Owner will provide any fuel after successful installation and testing. Submitted: 2/9/2026 09:21:53 AM (CT)

    Key dates

    1. January 23, 2026Published
    2. February 27, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.