SLED Opportunity · NEVADA · NEVADA
AI Summary
Sewer installation project for Phases 9 and 10 in Nevada city, involving horizontal construction of sewer mains and laterals. Locally funded with no OJT goal or pre-bid meeting.
Southeast Sewer Conversion Project Phase 9B Project No. | P320121007 PWP No. | CC-2026-189 Engineer's Estimate $ 1,042,714.00 Summary The project includes the installation of sewer mains and laterals for the residents located within Phases 9 and 10 of the City Master Plan. Funding This project is locally funded. BABAA This project is not subject to BABAA requirements. Type This project is deemed a horizontal construction project. Pre-Bid Meeting This project will not conduct a pre-bid meeting. OJT This project has no On-the-Job Training (OJT) goal. Questions Questions may only be submitted via NGEM. Questions are to be submit, and will be responded to, via the Questions tab. --- Q&A --- Q1: Is Mill and Overlay for asphalt patching required? A1: Answered through Addendum 2 Submitted: 2/18/2026 11:50:53 AM (PT) Q2: Specs call for dewatering, but the soils report only shows moist material around the project location. Does the City know where and what amount of ground water will be required? A2: Answered through Addendum 2 Submitted: 2/18/2026 08:20:28 AM (PT)
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.