SLED Opportunity · NEVADA · NEVADA

    Addendum 2 (Wastewater Reclamation Facility Warehouse

    Issued by Nevada
    stateInvitation for BidNevadaSol. 19160
    Closed
    STATUS
    Closed
    due Jan 21, 2026
    PUBLISHED
    Dec 17, 2025
    Posting date
    JURISDICTION
    Nevada
    state
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    Invitation for Bid for installation of an 8,125 sq. ft. metal building and site improvements at Nevada's Wastewater Reclamation Facility. Locally funded, no pre-bid meeting, and no OJT goal.

    Opportunity details

    Solicitation No.
    19160
    Type / RFx
    Invitation for Bid
    Status
    Issued
    Level
    state
    Published Date
    December 17, 2025
    Due Date
    January 21, 2026
    NAICS Code
    236220AI guide
    Jurisdiction
    Nevada
    State
    Nevada
    Agency
    Nevada

    Description

    Wastewater Reclamation Facility Warehouse Project No. | P320122002 PWP No. | CC-2026-156 Engineer's Estimate $5,398,000 Summary Installation of an 8125-square-foot metal building and associated site improvements. Funding This project is locally funded. BABAA This project is not subject to BABAA requirements. Type This project is deemed both a vertical and horizontal construction project. Pre-Bid Meeting This project will not conduct a pre-bid meeting. OJT This project has no On-the-Job Training (OJT) goal. Questions Questions may only be submitted via NGEM. Questions are to be submit, and will be responded to, via the Questions tab. --- Q&A --- Q1: American Buildings can provide G90 for the secondary but note that their offerings are not acrylic coated. Please confirm that this is acceptable. A1: Answered through Addendum 2 Submitted: 1/6/2026 11:15:10 AM (PT) Q2: Can you confirm wall panel specs? They seem to contradict from spec page to elevations. The spec seems to call out more of a mesa panel, where elevations are stucco. Further, they also differ on ga thickness of panel. If it is stucco, do you want Santa Fe or Tuff Cast? A2: Answered through Addendum 2 Submitted: 1/6/2026 11:14:12 AM (PT) Q3: There’s no collateral load called out for the building. Please confirm what this should be. A3: Answered through Addendum 2 Submitted: 1/6/2026 11:13:34 AM (PT) Q4: What weight needs to be included for interior walls attaching to the metal building framing? A4: Answered through Addendum 2 Submitted: 1/6/2026 10:20:59 AM (PT) Q5: The braced bays shown on the foundation plan will conflict with the transom windows and the mandoor into the fire riser room. Can this bay of bracing be moved between E and F instead? a. The sill height of the window between lines D and E may need to raise to avoid x-bracing being seen A5: Answered through Addendum 2 Submitted: 1/6/2026 10:20:18 AM (PT)

    Key dates

    1. December 17, 2025Published
    2. January 21, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.