Invitation to Bid for demolition of ARFF Building at Hagerstown Regional Airport, including asbestos abatement and utility capping. Bonds required. Pollution liability insurance mandatory for asbestos work. Concrete testing limited. Utilities disconnected but capping and verification required.
A BID BOND, PERFMANCE BOND and LABOR AND MATERIAL BOND are ALL Required for this Bid --- Q&A --- Q1: on CD101 a note is reference to cap all utilities. it is under the impression that utilizes are capped prior by the owner. please confirm A1: Addendum No. 3: Utilities have been disconnected; however, they may not be capped. Capping of all existing utilities shall be the responsibility of the Contractor. All utilities shall be capped in a safe and code-compliant manner in accordance with applicable utility owner requirements and standards, using appropriate plugs, fittings, or end caps to provide a permanent watertight and/or dust-tight seal as applicable. The Contractor shall coordinate with RPR as necessary prior to capping. Submitted: 5/12/2026 04:44:10 PM (ET) Q2: Do any Vehicles and or Equipment need specialized designation lettering applied to them for this project A2: Addendum No. 3: No specialized lettering for vehicles or construction equipment is required for vehicles and equipment outside the AOA. Vehicles and equipment within the AOA must comply with the standards noted on Sheet GI003, section D. Submitted: 5/12/2026 04:39:06 PM (ET) Q3: due to the asbestos abatement portion of the project is pollution liability insurance required for the project? A3: Addendum No. 3: Yes. Due to the asbestos abatement scope of work, Contractors performing asbestos-related activities shall be required to carry Contractors Pollution Liability (CPL) insurance, or equivalent Environmental Liability coverage, covering asbestos and other hazardous materials. Coverage shall be maintained in accordance with the project insurance requirements and shall apply to all operations involving asbestos disturbance, removal, handling, transport, and disposal. Submitted: 5/12/2026 04:28:45 PM (ET) Q4: any testing (breaks) for concrete required and if so is this by owner's 3rd party? A4: Addendum No. 3: For the limited quantity of non-structural concrete associated with CMU cell fill, concrete testing (cylinder breaks) will not be required. Compliance shall be verified through certified delivery tickets and mix design submittals in accordance with project specifications and applicable standards. Submitted: 5/12/2026 04:21:40 PM (ET) Q5: Confirm all utilities have been terminated and verified by local utility providers A5: Addendum No. 3: Based on information currently available to the Owner and Engineer, utilities serving the building have been disconnected from the structure. However, the Owner and Engineer cannot confirm that all disconnects have been verified by the individual utility providers. Submitted: 5/12/2026 04:15:52 PM (ET)
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.