SLED Opportunity · NEVADA · NEVADA
AI Summary
Clark County seeks bids for the Orchard Collector drainage improvement project in Las Vegas, NV, including concrete channel and levee lining, reinforced concrete box culverts, landscaping, and related infrastructure. The project aims to manage runoff into the Orchard Detention Basin between Charleston Boulevard and Linden Avenue.
Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. The Orchard Collector consists of drainage improvements to capture and convey runoff from Frenchman Mountain into the existing Orchard Detention Basin. Project limits are between Charleston Boulevard and Linden Avenue and located in Section 35, Township 20 South, Range 62 East, M.D.M., Clark County, NV. Clark County Regional Flood Control District Las Vegas Valley Master Plan Update identifies the proposed improvements as Sloan-Orchard SLOR 0158. Improvements include, at a minimum, concrete or roller-compacted concrete channel and levee lining extending from the existing Orchard Detention Basin north inflow channel to the new inflow collector channel terminus approximately 4,230 feet north. Reinforced concrete box is provided under extended roadway alignments and hard lining is proposed at significant inflow locations along the alignment. Additional provisions include maintenance roads, access paths and ramps, fencing, landscaping enhancements, and other necessary appurtenances required to make a complete and serviceable project. --- Q&A --- Q1: What is the thickness required for the gravel mulch shown on the landscape plans? A1: ): A typical section will be added to sheet LS-5 to clarify that gravel mulch shall be installed at a thickness of 6 inches. Submitted: 4/29/2026 10:35:05 AM (PT) Q2: Does this project require tortoise fence? A2: Desert tortoise requirements during construction are included in Appendix A of the Contract Documents. Submitted: 4/29/2026 10:32:50 AM (PT) Q3: What are the certifications needed for the landscape portion of this contract? A3: The landscaping certification requirements are included in Section 212 of the Standard Specification and Section 212 of the Special Provision. Submitted: 12/4/2025 10:19:52 AM (PT) Q4: This project is in need of more time to bid due to the complex nature of the project and the holiday season. These jobs usually need 6-8 weeks with no holidays to put together. Can you please ask that this jobs’ bid date move to 1/8/26? Thank you. A4: Per Public Works: The opening date has not been changed as part of Addendum 1 Submitted: 11/24/2025 07:20:47 AM (PT)
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.