    AI Summary

    Clark County seeks bids for widening the CC-215 West Bruce Woodbury Beltway including concrete paving, bridge structures, drainage, guardrail, lighting, fencing, walls, and traffic signal modifications.

    Opportunity details

    Solicitation No.
    19167
    Type / RFx
    IFB
    Status
    Issued
    Level
    state
    Published Date
    November 19, 2025
    Due Date
    January 21, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    Nevada
    State
    Nevada
    Agency
    Nevada

    Description

    Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. The work to be performed is for the construction necessary for widening of the CC-215 West Bruce Woodbury Beltway from Charleston Boulevard to Far Hills Drive including removal of existing improvements; mainline concrete paving milling/grinding, UTACS, and concrete paving repairs; plantmix bituminous surfacing; bridge structures; drainage facilities; guardrail; concrete barrier rail; signage; lighting/luminaire replacement; milling; pavement markings; chain-link fence and gate; MSE walls, retaining wall, and soil nail wall; and traffic signal modifications. --- Q&A --- Q1: What are the roadway categories for Sheet L-2, L-10, and L-11 to determine the correct roadway luminaire? A1: NDOT Type A. Submitted: 12/10/2025 04:20:23 PM (PT) Q2: Section 104 - Work is restricted on most items to occur within an 8 hr window. Please will the County consider increasing this window to 10Hr's so as to give 1 hour pre shift and post shift for the setting up/ removing traffic control and an 8hr shift for preforming work. A2: Work hours have been revised in the addendum. Submitted: 12/10/2025 11:04:10 AM (PT) Q3: Section 104 7b - Summerlin Center Drive. Please will you amend this section to allow for 2 consecutive days of closure for both falsework set up and then 2 consecutive days for falsework remove and increase the closure time to 10 hrs A3: Section 104 has been updated in the addendum. Submitted: 12/10/2025 10:53:02 AM (PT) Q4: Roadway Excavation - In performing the earthworks on this project and the phasing of the work, there will be both roadway excavation and embankment fill required. In order that the contractor to be reimbursed correctly and following NDOT logic, please add a bid item for embankment fill and provide the quantity. A4: No, it's included in Roadway Excavation bid item. Submitted: 12/10/2025 08:49:29 AM (PT) Q5: In the plans on sheet RW2 in general notes, point 9, it states that the use of metal straps is prohibited. Is this correct? We would like to use the Hilfiker RSE system which is on the QPL. A5: Yes, metal Strap is Prohibited Submitted: 12/10/2025 08:14:36 AM (PT)

    Key dates

    1. November 19, 2025Published
    2. January 21, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.