Active SLED Opportunity · TEXAS · ADKISSON GROUP OBO HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 130
AI Summary
Construction project for utility extension in Harris County, TX, including installation of waterline, sanitary sewer, pollution prevention, concrete work, traffic control, and site restoration.
A. Installation of Pollution Prevention Measures
B. Construction of Sanitary Sewer and Appurtenances
C. Construction of Waterline and Appurtenances
D. Concrete Removal and Replacement
E. Traffic Control
F. Testing of Constructed Facilities
G. Site Clean Up and Restoration
## Details **Bid/Project ID:** 0204-094-00, Contract No. 1 **Type of Work:** The project includes the installation of 12-inch waterline, flushing valves, and 15-inch sanitary sewer via trenchless and open-cut method **Pre-Bid Location:** For Access to the teleconference for the Pre-Bid dial (605) 313- 5660, and use access code: 6184643. **Pre-Bid Notes:** The Prebid meeting is NOT mandatory. **Bid Location:** Civcast eBidding **Bid Notes:** For Access to the teleconference for the bid opening, dial (605) 313- 5660, and use access code: 6184643. **Engineer/Publisher:** IDS Engineering Group **Engineer Address:** 13430 Northwest Freeway, Suite 700, Houston, Texas, 77040SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.