SLED Opportunity · GEORGIA · GEORGIA
AI Summary
Construction of a new Air Traffic Control Tower building including demolition, site grading, utility installation, pavement construction, erosion control, and compliance with FAA and local requirements at Peachtree City Airport.
The Work shall consist of furnishing all labor, materials, equipment, and incidentals necessary for the construction of a new Air Traffic Control Tower (ATCT) building, including associated demolition, site grading, and drainage improvements; installation of utilities; construction of bituminous driveway and parking lot pavement; installation of concrete sidewalks; implementation and maintenance of erosion and sediment control measures; and installation of pavement markings. All work shall be performed in accordance with the plans, specifications, and applicable local, state, and FAA requirements.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.