Active SLED Opportunity · FLORIDA · GAINESVILLE REGIONAL UTILITIES

    ANNUAL CONTRACT FOR CRANE RENTAL SERVICE

    Issued by Gainesville Regional Utilities
    localITBGainesville Regional UtilitiesSol. 231882
    Open · 29d remaining
    DAYS TO CLOSE
    29
    due Jul 2, 2026
    PUBLISHED
    Jun 2, 2026
    Posting date
    JURISDICTION
    Gainesville Regional
    local
    NAICS CODE
    238910
    AI-classified industry

    AI Summary

    Gainesville Regional Utilities seeks qualified contractors for an annual contract to provide crane rental services, including certified operators and emergency response, supporting utility infrastructure projects in Florida. Bids due July 2, 2026.

    Opportunity details

    Solicitation No.
    231882
    Type / RFx
    ITB
    Status
    open
    Level
    local
    Published Date
    June 2, 2026
    Due Date
    July 2, 2026
    NAICS Code
    238910AI guide
    State
    Florida
    Agency
    Gainesville Regional Utilities

    Description

    GRU has recurring requirements for crane services from qualified operators and wish to establish an annual contract with one or more highly qualified contractors that can mutually agree to GRU terms and conditions and insurance requirements.

    Project Details

    • Reference ID: ITB 2026-012
    • Department: Multiple Departments
    • Department Head: Procurement Specialists (Procurement Specialist III)

    Important Dates

    • Questions Due: 2026-06-24T08:00:00.000Z

    Evaluation Criteria

    • Enforcement

      GRU is entitled to exercise all administrative, contractual, or other remedies permitted by law to enforce Contractor’s compliance with the terms of this Agreement, except to the extent expressly provided otherwise by this Agreement.

    • Definitions
      • Agreement: A written Contract between two or more Parties [“GRU” and “Contractor”]. “Contract” and “Agreement” are synonymous.
      • Deliverable: The completion of a milestone or the accomplishment of a task associated with the Work.
      • Free on Board (FOB) Destination: The Contractor is responsible for delivery of materials to a specified delivery point. The risks of loss are borne by the seller or consignee. Title passes when delivery is received by the buyer at destination. Seller has total responsibility until shipment is delivered.
      • Specification: A description of the physical or functional characteristics of goods or services as defined in the Solicitation.
      • Work: Activity involving effort done in order to achieve a purpose or result requested in the scope.
    • Purpose

      The purpose of this Annual Contract is to provide crane rental services, with or without certified operators, to support construction, maintenance, repair, and emergency operations associated with electric, water, wastewater, natural gas, telecommunications, and related utility infrastructure operated by Gainesville Regional Utilities (GRU).

      The Contractor shall furnish cranes, qualified operators, rigging equipment, transportation, supervision, and related services on an as-needed basis.

    • Definitions for Instructions
      • Addendum/Addenda: Written or graphic document(s) issued prior to the Response due date, which make additions, deletions, or revisions to the solicitation or contract documents.
      • Agreement: A written Contract between two or more Parties. “Contract” and “Agreement” are synonymous.
      • Bid: The written response to a Solicitation.
      • Due Date: The date the response is due.
      • Evaluation: is the systematic review, analysis, and scoring of bid or proposal submissions to determine the extent to which each submission meets the requirements, specifications, and evaluation criteria established in the solicitation, for the purpose of identifying the most responsive and responsible bidder or the proposal that provides the best value to the agency. 
      • Non–Responsive: A response that does not meet the material requirements of the solicitation.
      • Redacted: The censoring of part of a Response.
      • Respondent: An individual or business entity that submits a response to a Solicitation.
      • Response: A written document submitted by a Respondent in reply to Solicitation.
      • Responsible: has the capability to perform the contract requirements in all respects, including the experience, integrity, reliability, capacity, facilities, equipment, and good credit.
      • Responsive: has submitted a bid which fully conforms in all material respects to the solicitation’s requirements.
      • Solicitation: A written document issued by an agency to obtain information or pricing for goods and/or services. May also be referred to as an Invitation to Bid, Request for Proposal, Request for Quotation, or Request for Statement of Qualifications.
      • Work: Activity involving mental or physical effort done in order to achieve a purpose or result requested in the scope.
    • Conduct of Work

      Contractor shall be considered an independent entity and as such shall not be entitled to any right or benefit to which GRU employees are or may be entitled to by reason of employment. Except as specifically noted in the Contract or Purchase Order, Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures utilized by Contractor in the performance of the Contract or Purchase Order. Contractor will assign only competent and skilled workers to perform the Work. All of Contractor’s personnel or subcontractors engaged in any of the Work performed pursuant to the Contract or Purchase Order are under Contractor's sole direction, supervision and control at all times and in all places. Contractor's employees must be as clean and in good appearance as the job conditions permit, conducting themselves in an industrious and professional manner. Contractor and its employees cannot represent, act, or be deemed to be an agent or employee of GRU. Nothing in the Contract or Purchase Order is intended to or shall be deemed to constitute a partnership or joint venture between the Parties. Further, unless specifically authorized to do so, the Contractor shall not represent to others that, as the Contractor, it has the authority to bind GRU to any third-party agreement.

    • Prohibition Against Contingent Fees
      The Professional Engineer, Architect, or registered Surveyor and Mapper, as applicable, warrants that he or she has not employed or retained any company or person, other than a bona fide employee working solely for the Professional Engineer, Architect, or registered Surveyor and Mapper, as applicable to solicit or secure the Contract or Purchase Order and that he or she has not paid or agreed to pay any person, company, corporation, individual, or firm, other than a bona fide employee working solely for the Professional Engineer, Architect, or registered Surveyor and Mapper any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of the Contract or Purchase Order.” For the breach or violation of this provision, GRU shall have the right to terminate the Contract or Purchase Order without liability and, at its discretion, to deduct from the contract price, or otherwise recover, the full amount of such fee, commission, percentage, gift, or consideration.
    • Scope

      The Contractor shall furnish all labor, supervision, equipment, materials, transportation, fuel, maintenance, tools, permits, and incidentals necessary to provide safe and reliable crane rental services.

      Services may include, but are not limited to:

      • Mobile hydraulic crane rental
      • Boom truck crane services
      • Rough terrain crane services
      • Crawler crane services
      • All-terrain crane services
      • Specialized lifting and rigging services
      • Emergency response services
      • Delivery, setup, operation, dismantling, and removal of equipment
      • Certified crane operators and rigging personnel, when requested
      • Signal persons and riggers compliant with applicable OSHA requirements

      Crane capacities may range from approximately 15 tons to 300+ tons, as required by GRU.

    • Authorized Procurement Representative

      The Procurement Representative for this Solicitation/Contract is Robbin Odowski; phone: 352-393-1209; email: odowskirr@gru.com. Respondents shall submit all inquiries regarding this bid via GRU e-Procurement Portal, located at https://procurement.opengov.com/portal/GRU. Please note the deadline for submitting inquiries. All answers to inquiries will be posted on GRU e-Procurement Portal. Respondents shall click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the respondent to check the website for answers to inquiries.

    • Equal Opportunity Employment

      During the performance of this contract, the Contractor agrees as follows:

      The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following:

      1. Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in a conspicuous place, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.

      The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive considerations for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.

      The Contractor will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee’s essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the Contractor’s legal duty to furnish information.

      The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or worker’s representatives of the Contractor’s commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

      The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.

      The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.

      In the event of the Contractor’s noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the Contractorr may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.

      The Contractor will include the portion of the sentence immediately preceding paragraph (1) and the provision of paragraphs (1) through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance:

      1. Provided, however, that in the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request the United States to enter into such litigation to protect the interests of the United States.
      2. The applicant further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, that if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate in work on or under the contract.
      3. The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of Contractor and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency’s primary responsibility for securing compliance.
      4. The applicant furthers agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a Contractor debarred from, or has not demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant to the Executive Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon Contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings.
    • Compliance with Referenced Specifications

      All Work, materials, systems, or operations specified by reference to standard trade or manufacturer’s published specifications shall comply with the requirements, except as modified by the Contract or Purchase Order. The specifications used must be the latest published edition that is in effect on the effective date of the Contract or Purchase Order unless a particular edition is specified. In the event of a conflict, the specifications that contain the more stringent requirements will govern.

    • Equipment Requirements

      The Contractor shall maintain a fleet of cranes and related equipment in safe operating condition and compliant with all applicable federal, state, and local regulations.

      The Contractor shall be capable of providing equipment including, but not limited to:

      Equipment TypeTypical Capacity Range
      Boom Trucks15–45 Tons
      Hydraulic Truck Cranes40–300 Tons
      Rough Terrain Cranes30–150 Tons
      Crawler CranesAs Needed
      Specialty Lifting EquipmentAs Needed

      All equipment shall:

      • Meet OSHA requirements
      • Meet manufacturer inspection and maintenance requirements
      • Have current annual inspections available upon request
      • Be equipped with all required safety devices and load charts
      • Arrive clean, operational, and ready for service
    • Responsibilities

      Contractor Responsibilities:

      Performance: Contractor shall perform all Work promptly and diligently in a good, proper and workmanlike manner in accordance with the Specifications. In performing the Work, Contractor has the freedom to perform Work in the manner which is most beneficial to the project provided that it is within the limits of these Specifications.

      Project Related Requirements: Contractor is responsible for providing and paying expenses for all labor, tools, equipment, and materials. All project related requirements must be of high quality, in good working condition, and conducive for the particular task. Adequate first aid supplies must be provided by Contractor and accessible to employees. These may include, but are not limited to, sanitation facilities, potable water, and office trailers.

    • Compliance with Davis-Bacon Act

      Contractor. The contractor shall comply with 18 U.S.C. § 874, 40 U.S.C. § 3145, and the requirements of 29 C.F.R. pt. 3 as may be applicable, which are incorporated by reference into this contract.

      Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clause above and such other clauses as the FEMA may be appropriate instructions required, and also a clause requiring the subcontractors to include these clause in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all of these contract clauses.

      Breach. A breach of the contract clauses above may be grounds for termination of the contract, and for debarment as a contractor and subcontractor as provided in 29 C.F.R. § 5.12.

    • Change Orders

      GRU shall pay Contractor for Work at the price[s] stated in the Contract or Purchase Order. No additional payment will be made to Contractor except for additional work stated on a valid change order and issued by GRU prior to the performance of the added work. A change order may be issued without invalidating the Agreement, if

      • made in writing; 
      • signed by the authorized representative(s), and 
      • accepted by Contractor

      Such change shall include the following: change orders that constitute changes to:

      • Statement of Work, 
      • Schedule
      • administrative procedures not affecting the conditions of the Agreement, or
      • the Agreement price
    • Notices

      Notices to Contractorshall be deemed to have been properly sent when delivered to Contractor's physical address and/or email.

      Notices to GRU are deemed to have been properly sent when emailed to purchasing@gru.com, mailed to P.O. Box 147117 Station A105, Gainesville, FL 32614 or delivered to Utilities Procurement Department, 301 SE 4th Avenue, Gainesville, Florida 32601 and GRU acknowledges receipt.

    • Contract Work Hours and Safety Standards Act

      Overtime requirements. No contractor or sub-contractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such work week unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such work week.

      Violation. liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (b)(1) of this section the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (b)(1) of this section, in the sum of $27 for each calendar day on which such individual was required or permitted to work in excess of the standard work week of forty hours without payment of the overtime wages required by the clause set forth in paragraph (b)(1) of this section.

      Withholding for unpaid wages and liquidated damages. GRU, shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section.

      Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (b)(1) through (4) of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (b)(1) through (4) of this section.

    • Cooperation/Coordination

      Access to Work Site: GRU and its authorized representatives are permitted free access to the work site, and reasonable opportunity for the inspection of all Work and materials.

      Work by GRU: GRU reserves the right to perform activities in the area where the Work is being performed by Contractor.

      Work by Other: Contractor. GRU reserves the right to permit another Contractor to perform work within the same work area. Contractor shall not damage, endanger, compromise or destroy any part of the site, including by way of example and not limitation, work being performed by others on the site.

      Coordination: Contractor shall, in the course of providing the Work, cooperate and communicate with GRU and all other persons or entities as required for satisfactory completion. Contractor will afford GRU and other Contractor reasonable opportunity for the introduction and storage of their equipment and materials and the execution of their Work concurrently and coordinating its Work in the best interest of GRU.

       

    • Operator Qualifications

      When operated equipment is requested, crane operators shall:

      • Hold current NCCCO certification or equivalent
      • Possess all licenses required by the State of Florida
      • Be trained in OSHA crane safety requirements
      • Have a minimum of three (3) years of experience operating the type of crane provided
      • Wear appropriate personal protective equipment (PPE)

      The Contractor shall provide proof of certifications and qualifications upon request.

    • Mandatory Pre-Bid Meeting

      A mandatory meeting will be held on NO VALUE beginning at NO VALUE at NO VALUE.  Responses will only be accepted from companies that had a representative in attendance at the Pre-Bid/Proposal meeting.  The purpose of a mandatory or non-mandatory pre-bid meeting is to help potential bidders to determine if they are capable of performing the work.

      Attendees must show government-issued photo identification (driver’s license) for entry into secured facilities.

      Representatives arriving to the Pre-Bid/Proposal Meeting more than TBD minutes late will not be allowed to participate in the meeting.

      Personal protection equipment will be required for site visit (hard hat, closed shoes, mask, hearing protection, etc.) GRU will not furnish these items.

    • Compliance with the Clean Air Act and the Federal Water Pollution Control Act

      Clean Air Act

      Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, 42 U.S.C. §7401 et seq.

      Contractor agrees to report each violation to FEMA and the Regional Office of the Environmental Protection Agency (EPA)

      Contractor agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FEMA.

      Federal Water Pollution Control Act

      Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251 et seq. 

      Contractor agrees to report each violation to FEMA and the Regional Office of the Environmental Protection Agency (EPA).

      The Contractor agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FEMA.

    • Response Time

      The Contractor shall provide services on an as-needed basis during normal business hours and for emergency situations.

      Normal Service Requests

      The Contractor shall respond within:

      • Twenty-four (24) hours for scheduled work, unless otherwise approved

      Emergency Service Requests

      The Contractor shall provide emergency response:

      • Twenty-four (24) hours per day
      • Seven (7) days per week
      • Including holidays

      Emergency response time shall be within:

      • Two (2) to four (4) hours after notification, unless otherwise approved by GRU.
    • Compliance with Laws and Regulations

      All City, County, State and Federal laws, regulations and/or ordinances shall be strictly observed. Contractor is responsible for taking all precautions necessary to protect life and property.

    • Indemnification

      Contractor shall be fully liable for its action, the actions of its agents, employees, partners, or subcontractors and fully indemnifies, defends, and holds harmless the City of Gainesville, GRU, its elected/appointed officials, its officers, agents, and employees, from any such suits, actions, damages, and/or costs of every name and description, including attorneys’ fees, arising from or relating to personal injury and damage to real or personal tangible property alleged to be caused in whole or in part by Contractor, its agents, employees, partners, or subcontractors.

      Further, Contractor shall fully indemnify, defend, and hold harmless the City of Gainesville and/or GRU from any suits, actions, damages, and costs of every name and description, including attorneys’ fees, arising from or relating to violation or infringement of a trademark, copyright, patent, trade secret or intellectual property right, provided, however, that the foregoing obligation will not apply to GRU’s misuse or modification or Contractor’s products or GRU’s operation or use of Contractor’s products in a manner not contemplated by the Contract or the purchase order. If any product is the subject of an infringement suit or in Contractor’s opinion is likely to become the subject of such a suit, Contractor may at its sole expense procure for GRU the right to continue using the product or to modify it to become non-infringing. If Contractor is not reasonably able to modify or otherwise secure GRU the right to continue using the product, Contractor shall remove the product and refund GRU the amounts paid in excess of a reasonable rental for past use. GRU shall not be liable for any royalties if applicable.

      Contractor’s obligations under the preceding two paragraphs with respect to any legal action are contingent upon GRU giving Contractor written notice of any action or threatened action, defending the action at Contractor’s sole expense. Contractor shall not be liable for any costs or expenses incurred or made by GRU in any legal action without Contractor’s prior written consent, which will not be unreasonably withheld.

      The provisions of this section shall survive the termination or expiration of the Contract or Purchase Order.

    • Non-Mandatory Pre-Bid Meeting

      A non-mandatory meeting will be held on NO VALUE beginning at NO VALUE at NO VALUE.  Those interested in attending the Pre-Bid/Proposal Meeting must inform the Procurement Specialist III. Those needing special accommodations must contact the GRU Representative at least two (2) business days prior to the scheduled meeting. The purpose of a mandatory or non-mandatory pre-bid meeting is to help potential bidders to determine if they are capable of performing the work.

      Attendees must show government-issued photo identification (driver’s license) for entry into secured facilities.

      Representatives arriving to the Pre-Bid/Proposal Meeting more than TBD minutes late will not be allowed to participate in the meeting.

      Personal protection equipment will be required for site visit (hard hat, closed shoes, mask, hearing protection, etc.) GRU will not furnish these items.

    • Scheduling and Coordination

      All work shall be coordinated through GRU’s designated representative. The Contractor shall:

      • Confirm equipment availability
      • Coordinate delivery and site access
      • Comply with all site-specific safety and operational requirements
      • Participate in pre-lift meetings when required
    • Examination of Solicitation Documents and Work Site

      Prior to responding to the Solicitation, Respondents are responsible for the following: (a) examining the Solicitation thoroughly, (b) if applicable, visiting the work site to become familiar with local conditions that may affect the cost, progress, performance of furnishing the Work, (c) considering federal, state and local laws and regulations that may impact or affect cost, progress, performance or furnishing of the Work, (d) studying and carefully correlating Respondent’s observations with the Solicitation, and (e) notifying the Procurement Representative of all conflicts, errors or discrepancies in the Solicitation.

      Respondents are expected to become fully informed as to the requirements of the Specifications and failure to do so will be at their own risk. Respondents cannot expect to secure relief on the plea of error.

      A Respondent who is aggrieved in connection with the specifications of this Solicitation may protest in writing to GRU Procurement at least seven (7) business days prior to the Response due date.

    • Governing Law, Venue, Attorney's Fees, and Waiver of Right to Jury Trial

      The Contract or Purchase Order shall be governed and construed pursuant to the laws of Florida and may not be construed more strictly against one party than against the other. In the event of any legal proceedings arising from or related to this Agreement:

      • venue for any state or federal legal proceedings shall be in Alachua County Florida; 
      • each Party shall bear its own attorneys’ fees except to the extent that Agreement agrees to indemnify GRU as described in Supplemental Conditions, including any appeals; and 
      • for civil proceedings, the Parties hereby waive the right to jury trial
    • Suspension and Debarment

      This contract is a covered transaction for purposes of 2 C.F.R. pt. 180 and 2 C.F.R. pt. 3000. As such, the Contractor is required to verify that neither the Contractor, its principals (defined at 2 C.F.R. § 180.995), or its affiliates (defined at 2 C.F.R. § 180.905) are excluded (defined at 2 C.F.R. § 180.940) or disqualified (defined at 2 C.F.R. § 180.935).

      Contractor must comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C and must include a requirement to comply with these regulations in any lower tier covered transaction related in any way to the performance of this Agreement.

      This certification is a material representation of fact relied upon by GRU. If it is later determined that Contractor did not comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C, in addition to remedies available to GRU, the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment.

      The contractor agrees to comply with the requirements of 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C while this Agreement is valid and throughout the period of any contract that may arise from the performance of this agreement. The bidder or proposer further agrees to include a provision requiring such compliance in its lower tier covered transactions.

    • Safety Requirements

      The Contractor shall comply with all applicable safety regulations including, but not limited to:

      • OSHA 29 CFR 1926 Subpart CC
      • OSHA 29 CFR 1910
      • Applicable Florida safety regulations
      • Utility/site-specific safety requirements

      The Contractor shall:

      • Conduct required equipment inspections
      • Use qualified rigging personnel
      • Maintain traffic control when necessary
      • Immediately report accidents, incidents, or property damage

      GRU reserves the right to stop work for unsafe conditions.

    • e-Verify

      The Contractor shall comply with all applicable requirements of Section 448.095, Florida Statutes, including but not limited to:

      • the Contractor shall register with and use the U.S. Department of Homeland Security’s E-Verify system to verify the work authorization status of all new employees of the Contractor during the term of this Agreement; and
      • the Contractor shall expressly require any subcontractors performing work or providing services pursuant to this Agreement to likewise register with and use the U.S. Department of Homeland Security’s E-Verify system to verify the work authorization status of all new employees of the subcontractor during the term of this Agreement.

      Section 448.095, Florida Statutes, states the statute must be construed in a manner that is fully consistent with any applicable federal laws or regulations, and therefore this section does not apply to this Agreement to the extent that this section would be inconsistent with any federal laws or regulations that are applicable to this Agreement.

    • Compliance with Byrd Anti-Lobbying Amendment

      Contractor hereby certifies to the best of its knowledge that:

      1. No Federal appropriated funds have been paid or will be paid, by or on behalf of Contractor, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
      2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, agreement. Contractor shall complete and submit Standard Form- LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.

      Contractor shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. Contractors who apply or bid for an award of $100,000 or more shall file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. Each tier shall also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the recipient.

      This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.S.C. § 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

      By executing this Agreement, Contractor hereby certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, Contractor understands and agrees that the provisions of 31 U.S.C. § 3801 et seq., apply to this certification and disclosure, if any.

    • Key Personnel

      The firm must list in its response, the Project Manager, Project Engineer, Quality Assurance Supervisor and other key personnel that will be assigned to this Project. The listing will need to include their biography, years of service in the industry, years of service with the Firm and their role in the Project.

      The Project Manager and Project Engineer must be two different individuals. They shall be a Professional Licensed Engineer in the State of Florida. Other Key Personnel must be clearly identified on the organizational chart submitted with the proposal.

    • Permits and Compliance

      The Contractor shall obtain and pay for all permits, licenses, and fees necessary to perform the work unless otherwise specified by GRU.

      The Contractor shall comply with:

      • Federal regulations
      • State of Florida laws
      • Local ordinances
      • Department of Transportation requirements for oversize loads
    • Procurement of Recovered Materials

      In the performance of this Agreement, Contractor shall make maximum use of products containing recovered materials that are EPA- designated items unless the product cannot be acquired

      1. Competitively within a timeframe providing for compliance with the contract performance schedule;
      2. Meeting contract performance requirements; or
      3. At a reasonable price.

      Information about this requirement, along with the list of EPA-designate items, is available at EPA’s Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program.

    • Sovereign Immunity

      Nothing in the Contract or Purchase Order shall be interpreted as a waiver of GRU’s sovereign immunity as granted pursuant to Section 768.28 Florida Statutes.

    • Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment

      Definitions. As used in this clause, the terms backhaul; covered foreign country; covered telecommunications equipment or services; interconnection arrangements; roaming; substantial or essential component; and telecommunications equipment or services have the meaning as defined in FEMA Policy 405-143-1, Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services (Interim), as used in this clause.

      Prohibitions.

      1. Section 889(b) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019, Pub. L. No. 115-232, and 2 C.F.R. 200.216 prohibit the head of an executive agency on or after Aug. 13, 2020, from obligating or expending grant, cooperative agreement, loan, or loan guarantee funds on certain telecommunications products or from certain entities for national security reasons.
      2. Unless an exception in paragraph (c) of this clause applies, the contractor and its subcontractors may not use grant, cooperative agreement, loan, or loan guarantee funds from the Federal Emergency Management Agency to:
        1. Procure or obtain any equipment, system, or services that uses covered telecommunications equipment or services as substantial or essential component of any system, or as critical technology of any system;
        2. Enter into, extend, or renew a contract to procure or obtain any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology of any system; or
        3. Enter into, extend, or renew contracts with entities that use covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, or as critical technology as part of any system; or
        4. Provide, as part of its performance of this contract, subcontract, or other contractual instrument, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.

      Exceptions.

      1. This clause does not prohibit contractors from providing:
        1. A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
      2. Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
          1. By necessary implication and regulation, the prohibitions also do not apply to:
            1. Covered telecommunications equipment or services that:
            2. Are not used as a substantial or essential component of any system; and
            3. Are not used as critical technology of any system.
            4. Other telecommunications equipment or services that are not considered covered telecommunications equipment or services.

      Reporting Requirement

      1. In the event the contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the contractor is notified of such by a subcontractor at any tier or by any other source, the contractor shall report the information in paragraph (d)(2) of this clause to the recipient or subrecipient, unless elsewhere in this contract are established procedures for reporting the information.
        1. The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause:
          1. Within one business day from the day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known); supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
          2. With 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.

      Subcontracts.

      The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments.

    • Selection Process and Recommendation

      The Selection Team will evaluate the responses based on the qualifications of the firm, project understanding, qualifications of project personnel and past performance. The Selection Team will then rank the Statement of Qualifications (SOQ) and shortlist the top three (3) responses and conduct oral discussions. 

      GRU will coordinate with the shortlisted firms a date and time to meet with the Selection Team via Microsoft Team Application.

      Based on the oral discussions/interviews, the Selection Team will determine and rank the top three firms in the order of the most qualified to perform the services. 

      GRU will take the ranking to the GRU Authority for approval to proceed with negotiations of a contract with the top qualified firm. 

      Upon approval by the Authority, GRU and the most qualified firm will negotiate a contract. In the event GRU and the most qualified firm are not able to reach a successful agreement, GRU will formally terminate the negotiations and proceed to the second most qualified firm.  If negotiations fail with the second most qualified firm, GRU will terminate the negotiations and start negotiations with the third most qualified. If negotiations fail with the third most qualified, GRU will conduct additional oral discussions and select additional qualified firms from the initial SOQs received and rank the most qualified and move on with negotiations with the fourth most qualified firm and so on with the process as stated above and in accordance with Florida Statute Chapter 287.055.

      GRU shall negotiate a contract for the professional services at compensation which GRU determines is fair, competitive, and reasonable.  For any lump-sum or cost plus and fixed fee professional services contract, GRU will request the firm to execute a Truth-in-Negotiation Certificate stating that the wage rates and other factual unit costs supporting the compensation are accurate, competitive, and current at the time of contracting.

    • Work Locations

      Services may be required at various facilities and project sites within GRU's service area, including:

      • Power generation facilities
      • Water/wastewater treatment facilities
      • Substations
      • Administrative facilities
      • Construction sites
      • Rights-of-way
    • Severability

      If any provision of the Contract or Purchase Order is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected; and the rights and obligations of the Parties shall be construed and enforced as if the Contract or Purchase Order did not contain the particular provision held to be invalid.

    • Pricing

      Pricing shall be firm for the initial contract term and shall include:

      • Hourly equipment rates
      • Operator rates
      • Mobilization/demobilization
      • Overtime rates
      • Standby rates
      • Emergency response rates
      • Fuel charges, if applicable

      Billing shall begin upon arrival at the job site unless otherwise approved.

    • Domestic Preferences for Purchases

      As appropriate and to the extent consistent with law, the contractor should, to the greatest extent practicable, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States. This includes, but is not limited to iron, aluminum, steel, cement, and other manufactured products.

      For purposes of this section:

      1. Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.
      2. Manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.
    • Interpretations and Addenda

      All questions about the meaning or intent of the Solicitation are to be directed to the Procurement Representative, unless stated otherwise in the Solicitation. Interpretations or clarifications considered necessary in response to such questions will be issued by Addenda sent to all parties recorded as having received the Solicitation. Questions received less than seven (7) business days prior to the Response due date/time may not be answered by the Procurement Representative. Only questions answered by formal written Addenda will be binding.

      Addenda may also be issued to modify the Solicitation as deemed advisable by the Procurement Representative.

      Addenda issued by GRU prior to the Solicitation due date/time are considered binding as if written into the original Solicitation. Respondents are responsible for ensuring that all addenda have been received prior to submitting their Response.

    • Assignment

      GRU or Contractor shall not assign or transfer, in whole or in part, any right or obligation pursuant to the Contract or Purchase Order, without the prior written consent of the other Party.

    • Payment

      Invoicing: Contractor is responsible for invoicing GRU for Work performed pursuant to the Contract or Purchase Order. Itemized invoices shall include the following information (if applicable): Contract number, Purchase Order number, item number, job number, description of supplies or services, quantities, unit prices, Work location, GRU Project Representative, job start date, job completion date or other pertinent information. Itemized invoice(s) must be mailed to Gainesville Regional Utilities, Accounts Payable, P.O. Box 147118, Station A27, Gainesville, FL 32614-7118 or e-mailed to accountspayable@gru.com.

      Payment Terms: GRU’s payment terms are net thirty (30) days from receipt of correct invoice. GRU may not set off payment due under the invoice for the specific Purchase Order to rectify or remedy a dispute related to a different Purchase Order.  Supplier shall not submit more than one invoice per thirty-day period. Any delay in receiving invoices, or error and omissions attributed solely to Supplier, will be considered just cause for delaying or withholding payment. Invoices for partially completed Work may be allowed with GRU’s prior approval. All partial invoices must be clearly identified as such on the invoice. Any charges or fees will be governed by current Florida Statutes.

      Prompt Payment: In accordance with Section 218.74, all payments, other than payments for construction services, due from GRU and not made within the time specified by this section bear interest from 30 days after the due date at the rate of 1 percent per month on the unpaid balance. The vendor must invoice the local governmental entity for any interest accrued in order to receive the interest payment. Any overdue period of less than 1 month is considered as 1 month in computing interest. Unpaid interest is compounded monthly. For the purposes of this section, the term “1 month” means a period beginning on any day of one month and ending on the same day of the following month.

      Receipting Report for Services: An itemized receipting report for services must be provided to the GRU Project Representative prior to invoicing which includes the number of hours and labor rates by job title, overhead, authorized per diem or travel expenses, and other charges. Receipting reports shall be used by the Project Representative to verify the services rendered.

      Pending Dispute: The Contractor shall proceed diligently with performance under the Contract pending the final resolution of any dispute or request for relief, claim, appeal, or action arising under the Contract and shall comply with directions to perform from GRU. Should the Contractor not perform while a dispute is pending, including by not performing disputed work, such nonperformance by the Contractor may be deemed to be an unexcused breach of the Contract which is separate and apart from any other dispute. 

      Lien Release: Before the final acceptance of the Work and payment by GRU, Contractor shall furnish to GRU an affidavit and final waiver that all claims for labor and materials employed or used in the construction of said Work have been settled and no legal claim can be filed against GRU for such labor and materials. If such evidence is not furnished to GRU, such amounts as may be necessary to meet the unsatisfied claims may be retained from monies due to Contractor under the Contract or Purchase Order until the liability has been discharged.

      Final Payment/Acceptance: The acceptance by Contractor of final payment due on termination of the Contract shall constitute a full and complete release of GRU from any and all claims, demands and causes of action whatsoever which Contractor, its successors or assigns have or may have against GRU under the provisions of the Contract or Purchase Order.

    • Response Preparation

      The Pricing Response Form is included in the Solicitation and should be used to submit pricing information, providing a price for all items listed on the form, unless noted otherwise.

      All blanks on the Respondent’s Certification Form must be legibly completed in ink (computer printed, typed or handwritten).

      A Response submitted by a corporation must be executed in the corporate name by the president, a vice-president, or other corporate representative and accompanied by a document showing authorization of such person’s authority. Include the physical address and state of incorporation. A Response submitted by a partnership must be executed in the partnership name and signed by a partner, whose title must appear under the signature, and the physical address of the partnership must be shown below the signature.

      The names of individuals included on the Respondent’s Certification Form must be legibly printed below signatures (computer printed, typed or handwritten).

      Respondent must acknowledge receipt of all addenda using the space provided on the Respondent’s Certification Form.

      Costs for developing a response to the Solicitation are the sole obligation of the Respondent.

      Respondent’s pricing must include applicable taxes on items purchased or manufactured by Respondent for the project. GRU is exempt from Florida sales taxes for certain purchases. A “Consumer’s Certificate of Exemption” is available at www.gru.com.

    • Access to Records

      The following access to records requirement applies to this Agreement:

      1. Contractor agrees to provide, GRU, the Florida Department of Emergency Management, the FEMA Administrator, the Comptroller General of the United States, or any of their authorized representatives access to any books, documents, papers, and records of the Contractor which are directly pertinent to this contract for the purposes of making audits, examinations, excerpts, and transcriptions.
      2. Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed.
      3. Contractor agrees to provide the FEMA Administrator or his authorized representatives access to construction or other work sites pertaining to the work being completed under the contract. 
      4. In compliance with section 1225 of the Disaster Recovery Reform Act of 2018, GRU and the Contractor acknowledge and agree that no language in this contract is intended to prohibit audits or internal reviews by the FEMA Administrator or the Comptroller General of the United States.
    • Audit of Records

      Contractor shall maintain records sufficient to document completion of the scope of services pursuant to the Contract or Purchase Order. At all reasonable times, these records shall be made available to review, inspect, copy and audit by persons duly authorized by GRU. These records shall be kept for a minimum of three (3) years after termination of the Contract or Purchase Order. Records that relate to any litigation, appeals or settlement of claim arising pursuant to the performance of the Contract or Purchase Order shall be made available until a final disposition has been made of such litigation, appeal, or claim.

    • Damage to Work

      Until final acceptance of the Work by GRU, Work will be under the charge and care of Contractor who must take every necessary precaution against damage to work by the elements or from any other cause whatsoever. Contractor will rebuild, repair, restore, or make good at their expense, damages to any portion of the Work before its completion and acceptance. Failure to do so will be at Contractor’s own risk. Contractor is not relieved of a requirement of the specifications on the plea of error.

    • Performance Requirements

      The Contractor shall:

      • Perform services in a timely and professional manner
      • Provide reliable and properly maintained equipment
      • Maintain adequate staffing and equipment availability
      • Replace defective or unsafe equipment immediately upon request

      Failure to meet performance standards may result in termination of the contract.

    • Disputes

      If a dispute arises out of or relates to the Contract or Purchase Order, or the breach thereof, and if the dispute cannot be settled through negotiation, either party may, by giving written notice, refer the dispute to a meeting of appropriate higher management, to be held within 20 business days after giving of notice. If the dispute is not resolved within 30 business days after giving notice, or such later date as may be mutually agreed, the Parties will submit the dispute to a mediator. The Parties shall mutually agree to the mediator and the costs of the mediator will be borne equally by both parties. The venue for mediation and any subsequent litigation shall be in Alachua County, Florida.

    • Subcontractors

      If subcontracts are to be let, the prime contractor is required to take all necessary steps identified in 2 C.F.R. §200.321(b)(1)-(5) to ensure that small and minority businesses, women’s business enterprises, and labor surplus firms are used when possible. Those steps are outlined below:

      1. Placing qualified small and minority businesses and women’s business enterprises on solicitation lists.
      2. Assuring that small and minority businesses, and women’s business enterprises are solicited whenever there are potential sources.
      3. Dividing total requirements, when economically feasible, into smaller task or quantities to permit maximum participations by small and minority businesses, and women’s business enterprises.
      4. Establishing delivery schedules, where the requirement permits, which encourage participation by small and minority businesses, and women’s business enterprises.
      5. Using the services and assistance, as appropriate, of such organizations as the Small Business Administration and the Minority Business Development Agency of the Department of Commerce.

      Definitions

      Small Business (SBE): A business that is independently owned and operated and is qualified as a small business under the Small Business Administration criteria and size standards at 13 C.F.R. Part 121.

      Women’s Business Enterprise (WBE): A business enterprise that is (a) at least 51% owned by one or more women, or in the case of a publicly owned business, at least 51% of the stock is owned by one or more women; and (b) whose management and daily operations are controlled by one or more women. (13 C.F.R. Part 127)

      Minority Business (MBE): A business that is (a) at least 51% owned by one or more minority group members, or in the case of a publicly owned business, at least 51% of the stock is owned by one or more minority group members; and (b) whose management and daily operations are controlled by one or more minority group members. (13 C.F.R. § 124.103, 13 C.F.R. § 124.102, and 13 C.F.R § 124.105).

      Labor Surplus Area (LSA): A locality, defined by the Department of Labor’s Employment and Training Administration, that has a civilian average annual unemployment rate during the previous two calendar years of 20% or more above the average annual civil unemployment rate for all states during that same period. (20. C.F.R. §§ 654.4-654.5). There is an “Exceptional Circumstance Consideration Provision” that allows a civil jurisdiction to ask for inclusion in the LSA list after it is published, due to events such as COVID-19, natural disasters, and other adverse economic changes.

      Labor Surplus Area Firm (LSAF): A firm that together with its first-tier subcontractors will perform substantially in LSAs as identified by the Department of Labor in accordance with 20 C.F.R. § 654. Performance is substantially in LSAs if the costs incurred under the contract on account of manufacturing, production, or performance of appropriate services in labor surplus areas exceed 50% of the contract price (40 C.F.R. § 33.103).

    • Nonexclusive Remedies

      Except as expressly set forth in the Contract or Purchase Order, the exercise by either Party of any of its remedies under the Contract or Purchase Order shall be without prejudice to its other remedies under the Contract or Purchase Order or otherwise.

    • Invoicing

      Invoices shall include:

      • Date of service
      • Job location
      • Equipment used
      • Hours worked
      • Operator name
      • Purchase order or work authorization number
      • Itemized charges

      Supporting documentation shall be provided upon request.

    • Use of DHS Logo

      Contractor shall not use the DHS seal(s), logos, crests, or reproductions of flags or likenesses of DHS agency officials without specific FEMA pre-approval. The contractor shall include this provision in any subcontract.

    • Price

      The price stated on the Pricing Response Form is firm. Any additional charges that were not included in the Response will not be paid by GRU unless approved in writing by an authorized GRU representative. Subsequent to contract formation, pricing inconsistencies on invoices may be grounds to cancel the contract.

      If the Respondent offers discounted pricing, such as prompt payment discounts or volume discounts, it must be clearly stated and explained on the Pricing Response Form. Such discounts, if applicable, will not be used in determining award of the Solicitation. 

    • Delay

      Notwithstanding the completion schedule, GRU has the right to delay performance for up to three (3) consecutive months as necessary or desirable and such delay will not be deemed a breach of Contract, but the performance schedule will be extended for a period equivalent to the time lost by reason of GRU's delay. Such extension of time will be Contractor's sole and exclusive remedy for such delay.

      If the project is stopped or delayed for more than three (3) consecutive months and GRU or Contractor elects to terminate the Contract because of such delay, or if such stoppage or delay is due to actions taken by GRU within its control, then Contractor's sole and exclusive remedy under the Contract will be reimbursement for costs reasonably expended in preparation for or in performance of the Contract. None of the aforementioned costs will be interpreted to include home office overhead expenses or other expenses not directly attributable to performance of the Contract. Contractor is not entitled to make any other claim, whether in breach of Contract or in tort for damages resulting in such delay.

    • Advertising

      Contractor shall not publicly disseminate any information concerning the Contract or Purchase Order without prior written approval from GRU, including but not limited to, mentioning the Contract or Purchase Order in a press release or other promotional material, identifying GRU as a reference, or otherwise linking Contractor’s name and either a description of the Contract or Purchase Order or the name of the GRU in any material published, either in print or electronically, to any entity that is not a party to the Contract, except potential or actual authorized distributors, dealers, resellers, or service representative.

    • Modification of Terms

      The Contract or Purchase Order constitutes the entire agreement between the Parties. No oral agreements or representations shall be valid or binding upon GRU or Contractor. No alteration or modification of the Contract or Purchase Order, including substitution of product, shall be valid or binding unless authorized by GRU. Contractormay not unilaterally modify the terms of the Contract or Purchase Order by affixing additional terms to product upon delivery (e.g., attachment or inclusion of standard preprinted forms, product literature, “shrink wrap” terms accompanying or affixed to a product, whether written or electronic) or by incorporating such terms onto Contractor’s order or fiscal forms or any other documents forwarded by Contractor for payment. An acceptance of product or processing of documentation on forms furnished by Contractor for approval or payment shall not constitute acceptance of the proposed modification to terms and conditions.

    • Deviations from Specifications

      Any deviation from this Solicitation must be provided and explained in detail with the Response. Deviations must be explained on a separate page labeled “Exceptions and Clarifications” and included with the Response. Each exception and clarification must correspond to the specific referenced section in the Solicitation. Otherwise, the Response will be considered in strict compliance with the Solicitation and the selected Respondent will be held accountable for compliance with the Specifications.

      GRU reserves the right to waive exceptions and clarifications to the Solicitation if determined by GRU to be in GRU’s best interest.

    • Default

      If Contractor should be adjudged as bankrupt, or make a general assignment for the benefit of its creditor(s), or if a receiver should be appointed forContractor, or if there is persistent or repeated refusal or failure to supply sufficient properly skilled workforce or proper materials, or if Contractor should refuse or fail to make payment to persons supplying labor or materials for the Work pursuant to the Contract or Purchase Order, or persistently disregards instructions of GRU, or fails to observe or perform or is guilty of a substantial violation of any provision of the Contract or Purchase Order documents, then GRU, after serving at least ten (10) calendar days prior written notice to Contractor of its intent to terminate and such default should continue un-remedied for a period of ten (10) calendar days, may terminate the Contract or Purchase Order without prejudice to any other rights or remedies and take possession of the Work; and GRU may take possession of and utilize in completing the Work such materials, appliances, equipment as may be on the site of the Work and necessary therefore. Contractor will be liable to GRU for any damages resulting from such default. 

    • Special Conditions

      GRU does not guarantee any minimum quantity of work under this contract. Services shall be requested on an as-needed basis. GRU reserves the right to obtain services from other sources if required to meet operational needs.

    • Compliance with Federal Law

      This is an acknowledgement that FEMA financial assistance will be used to fund all or a portion the Agreement only. The Contractor will comply will all applicable federal law, regulations, executive orders, FEMA policies, procedures, and directives.

    • No Obligation of Federal Government

      The Federal Government is not a party to this Agreement and is not subject to any obligations or liabilities to the non-Federal entity, contractor, or any other party pertaining to any matter resulting from the contract.

    • Termination

      Termination for Convenience. GRU may, by providing thirty (30) calendar days written notice to Contractor, terminate the Contract or Purchase Order, or any part thereof, for any or no reason, for GRU’s convenience and without cause. After the termination date, Contractor shall stop all Work and cause its suppliers and/or subcontractors to stop all Work in connection with the Contract or Purchase Order. If GRU terminates for convenience, GRU shall pay Contractor for goods and services accepted as of the date of termination, and for Contractor’s actual and reasonable, out of pocket costs incurred directly as a result of such termination. GRU is not responsible for Work performed after the effective termination date of the Contract or Purchase Order.

      Termination for Cause (Cancellation). GRU may terminate the Contract or Purchase Order for cause if Contractor materially breaches the Contract or Purchase Order by:

      • refusing, failing or being unable to properly manage or perform. 
      • refusing, failing or being unable to perform the Work pursuant to the Contract or Purchase Order with sufficient numbers of workers, properly skilled workers, proper materials to maintain applicable schedules. 
      • refusing, failing or being unable to make prompt payment to subcontractors or suppliers. 
      • disregarding laws, ordinances, rules, regulations or orders of any public authority or quasi-public authority having jurisdiction over the Project. 
      • refusing, failing or being unable to substantially perform pursuant to the terms of the Contract or Purchase Order as determined by GRU, or as otherwise defined elsewhere herein; and/or 
      • refusing, failing or being unable to substantially perform in accordance with the terms of any other Contract between GRU and Contractor

      Funding out Clause. If funds for the Contract or Purchase Order are no longer available, GRU reserves the right to terminate the Contract or Purchase Order without cause by providing Contractor with thirty (30) calendar day’s written notice to Contractor.

    • Waiver

      Any delay or failure by GRU to exercise or enforce any of its rights pursuant to the Contract or Purchase Order shall not constitute or be deemed a waiver of GRU’s right thereafter to enforce those rights, nor will any single or partial exercise of any such right preclude any other or further exercise thereof or the exercise of any other right.

    • Exceptions and Clarifications

      While a responsive bid meets all material requirements of the solicitation, GRU may waive non-material requirements. Some requirements cannot be waived without adversely impacting the competitive bid process. If, during bid evaluation, there is any doubt as to the materiality of any exception or clarification, Utilities Purchasing and/or the Utilities Attorney shall be consulted before acceptance of a bid. Similarly, a bid will not be rejected without such consultation.

    • Disclosure and Confidentiality

      Florida’s Public Records Law, Chapter 119, Florida Statutes, includes numerous exemptions to the general requirement to disclose information to the public in response to a public records request. Exemptions are found in various provisions of the Florida Statutes, including but not limited to Section 119.071, Florida Statutes (General exemptions from inspection or copying of public records), and Section 119.0713, Florida Statutes (Local government agency exemptions from inspection or copying of public records). Section 119.0715, Florida Statutes (Trade Secrets Held by an Agency), exempts trade secrets from release as a public record, but also provides that public employees cannot be held liable if they, acting in good faith, release a public record that contains a trade secret. The Parties understand and agree that Florida’s Public Records Law is very broad and that documents claimed by a Party to be confidential and exempt from public disclosure pursuant to the Public Records Law may in fact not be deemed such by a court of law. Accordingly, the following provisions shall apply:

      • Identifying Trade Secret or Otherwise Confidential and Exempt Information. For any records or portions thereof that Contractor claims to be Trade Secret or otherwise confidential and exempt from public disclosure under the Public Records Law, Contractor shall:
        • Specifically identify the records or specific portions thereof that are confidential and exempt and reference the particular Florida Statute that grants such status. Provide one redacted copy of the record and one copy of the record with the confidential and exempt information highlighted. Contractor shall take care to redact only the confidential and exempt information within a record.
        • Provide an affidavit or similar type of evidence that describes and supports the basis for Contractor’s claim that the information is confidential and exempt from public disclosure.

      Request for Trade Secret or Otherwise Confidential and Exempt Information.

      • In the event GRU receives a public records request for a record with information labeled by Contractor as Trade Secret or otherwise as confidential and exempt, GRU will provide the public record requester with the redacted copy of the record and will notify Contractor of the public records request.
      • However and notwithstanding the above, in the event that GRU in its sole discretion finds no basis for Contractor’s claim that certain information is Trade Secret or otherwise confidential and exempt under Florida’s Public Records Law, then GRU shall notify Contractor in writing of such conclusion and provide Contractor a reasonable amount of time to file for declaratory action requesting a court of law to deem the requested information as Trade Secret or otherwise as confidential and exempt under Florida’s Public Records Law. If Contractor fails to file for declaratory action within the reasonable amount of time provided, then GRU will disclose the information requested.
      • If a public records lawsuit is filed against GRU requesting public disclosure of the information labeled by Contractor as Trade Secret or otherwise as confidential and exempt, GRU shall notify Contractor and Contractor shall intervene in the lawsuit to defend the nondisclosure of such information under Florida’s Public Records Law.
      • Contractor hereby indemnifies and holds GRU, its officers and employees harmless from any and all liabilities, damages, losses, and costs of any kind and nature, including but not limited to attorney’s fees, that arise from or are in any way connected with Contractor’s claim that any information it provided to GRU is Trade Secret or otherwise confidential and exempt from public disclosure under Florida’s Public Records Law.

      “Work Product" may include creative work which may lead to programs, intellectual properties, computer software, computer programs, codes, text, hypertext, designs, and/or any other work products associated with or arising directly out of the performance of the Work.

    • Emergency Response

      The Contractor shall be capable of responding to emergency requests, including:

      • Storm restoration

      • Infrastructure failures

      • Equipment removal or installation following system outages

      • Hazardous or unstable equipment removal

      Emergency response may require 24-hour availability, including nights, weekends, and holidays.

    • Distribution of Information

      GRU requires electronic submission of bids and proposals. Submit electronic responses via GRU e-Procurement Portal: https://procurement.opengov.com/portal/GRU. By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes.

      The OpenGov portal allows the following:

      1. Access procurement documents and related information.
      2. Receive automatic and instant notifications of government opportunities.
      3. Download solicitation documents and specifications online.
      4. Submit your bids and proposals online.
      5. See all the forms and documents you need to complete in one place.
      6. Receive and respond to government requests for quotes immediately.
      7. Automatic notification of awards.

      For more information about OpenGov, visit https://procurement.opengov.com.

      It is the responsibility of the vendor to regularly monitor GRU's eProcurement Portal. Respondents shall click “Follow” on this solicitation to receive all email notifications when answers are posted, addenda issued, & other solicitation notices.

      Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda at https://procurement.opengov.com/portal/GRU.  Vendor failure to retrieve available, required procurement information and include the appropriate documentation and information in solicitation responses may result in disqualification. 

    • Force Majeure

      No Party to the Contract or Purchase Order shall be liable for any default or delay in the performance of its obligations under the Contract or Purchase Order due to an act of God or other event to the extent that:

      • the non-performing Party is without fault in causing such default or delay; and 
      • such default or delay could not have been prevented by reasonable precautions. Such causes include, but are not limited to acts of civil or military authority (including but not limited to courts of administrative agencies); acts of God; war; terrorist attacks; riot; insurrection; inability of GRU to secure approval; validation or sale of bonds; inability of GRU or Supplier to obtain any required permits, licenses or zoning; blockades; embargoes; sabotage; epidemics; fires; hurricanes, tornados, floods; or strikes.

      In the event of any delay resulting from such causes, the time for performance of each of the Parties hereunder (including the payment of invoices if such event actually prevents payment) shall be extended for a period of time reasonably necessary to overcome the effect of such delay. Any negotiated delivery dates established during or after a Force Majeure event will always be discussed and negotiated if additional delays are expected.

      In the event of any delay or nonperformance resulting from such cause, the Party affected will promptly notify the other Party in writing of the nature, cause, date of commencement, and the anticipated impact of such delay or nonperformance. Such written notice, including change orders, will indicate the extent, if any, to which is anticipated that any delivery or completion date will be affected.

    • Program Fraud and False or Fraudulent Statements or Related Acts

      Contractor acknowledges that 31 U.S.C. Chap. 38 (Administrative Remedies for False Claims and Statements) applies to the contractor’s actions pertaining to this contract.

    • Limitation of Liability

      To the fullest extent permitted by law, GRU shall not be liable to Contractor for any incidental, consequential, punitive, exemplary or indirect damages, lost profits, revenue or other business interruption damages, including but not limited to, loss of use of equipment or facility.

    • Public Records

      If Contractor is either a “contractor” as defined in Section 119.0701(1)(a), Florida Statutes, or an “agency” as defined in Section 119.011(2), Florida Statutes, Contractor shall:

      • Keep and maintain public records, as defined in Section 119.011(12) of the Florida Statutes, required by GRU to perform the service.
      • Upon request from GRU’s custodian of public records, provide the public agency with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law.
      • Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to GRU.
      • Upon completion of the contract, transfer, at no cost, to GRU all public records in possession of the Contractor or keep and maintain public records required by GRU to perform the service. If the Contractor transfers all public records to GRU upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to GRU, upon request from GRU’s custodian of public records, in a format that is compatible with the information technology systems of GRU.
      • IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, AS TO THE CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS AGREEMENT, CONTACT THE GRU CUSTODIAN OF PUBLIC RECORDS AT 352-393-1211, PUBLICRECORDSREQUEST@GRU.COM ,  PO BOX 147117, STATION E3E, GAINESVILLE, FL 32614.
    • Operator and Personnel Requirements

      When crane operators are provided by the Contractor:

      • Operators must be trained, qualified, and certified to operate the specific crane type.

      • Operators must possess the knowledge, skills, and experience necessary to safely perform lifting operations.

      Operators shall comply with federal requirements under 29 CFR 1926.1427, which requires crane operators to be trained, certified or licensed, and evaluated before operating covered equipment.

      Operators must also:

      • Follow all applicable rigging and signaling procedures

      • Maintain communication with designated signal persons

      • Conduct pre-lift safety inspections

    • Solicitation Response

      Bids may be received up to but not later than 2:00 pm on Thursday, July 2, 2026 via GRU e-Procurement Portal located at https://procurement.opengov.com/portal/GRU. GRU e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. Gainesville Regional Utilities strongly recommends completing your response well ahead of the deadline.  By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes.

      Responses will be electronically unsealed publicly opened at the time and place indicated in the Solicitation and will be available for inspection upon notice of award or intended Award, or within thirty (30) calendar days after the opening of Responses, whichever occurs first. Prices may be publicly disclosed on GRU’s eProcurement Portal at the sole discretion of GRU Procurement.

      The Respondent’s Certification Form must be submitted with the Response.  If required, a Bid Bond and other documents must be provided with the Response. If a Bid Bond is required by the Solicitation and not included the response will be deemed non-responsive.

      A “No-Bid” Response can be submitted for those who choose not to participate in the Solicitation.  This designation can be submitted in GRU’s eProcurement Portal: https://procurement.opengov.com/portal/gru/projects/231882

    • Work Hours

      GRU normal business hours are TBDContractor may perform the Work outside business hours only with prior approval from the Authorized Representative or designee.

    • Submitting Questions and Receiving Answers

      Respondents shall submit all inquiries regarding this bid via GRU e-Procurement Portal, located at https://procurement.opengov.com/portal/GRU. Please note the deadline for submitting inquiries: 4:00 am on Wednesday, June 24, 2026. All answers to inquiries will be posted on GRU e-Procurement Portal. Respondents shall click “Follow” on this solicitation to receive all email notifications when answers are posted, addenda issued, & other solicitation notices. It is the responsibility of the respondent to check the website for answers to inquiries.

      Addenda Notification and Acknowledgement Addenda Notification:

      Respondents are required to register for an account via GRU e-Procurement Portal hosted by OpenGov. Once the respondent has completed registration, they will receive addenda notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda at https://procurement.opengov.com/portal/GRU.

    • Equipment Requirements

      All cranes and lifting equipment shall:

      • Be maintained in safe operating condition

      • Meet manufacturer specifications

      • Have all required safety devices operational

      • Include load charts, manuals, and required documentation

      Contractor shall provide:

      • Rigging gear

      • Spreaders

      • Slings

      • Shackles

      • Tag lines

      • Safety devices

      All equipment must be inspected regularly and documentation must be available upon request.

    • Sales Tax

      Respondent’s pricing shall include applicable taxes on items purchased or manufactured by Respondent for the project. GRU is exempt from Florida sales taxes for certain purchases. A “Consumer’s Certificate of Exemption” is available at https://www.gru.com/WorkWithGRU/Procurement/PurchaseOrders.

    • Inspection and Maintenance

      The Contractor shall ensure cranes are inspected and maintained in accordance with:

      • Manufacturer recommendations

      • OSHA inspection requirements

      • Applicable industry standards

      Inspection documentation shall be provided to GRU upon request.

    • Anti-Discrimination

      Contractor shall not discriminate on the basis of race, color, religion, sex, gender, national origin, marital status, sexual orientation, age, disability or gender identity, or other unlawful forms of discrimination in the performance of the Contract or Purchase Order. Contractor understands and agrees that a violation of this clause shall be considered a material breach of the Contract or Purchase Order and may result in termination of the Contract or Purchase Order. This clause is not enforceable by or for the benefit of, and creates no obligation to, any third party.

    • Cancellation of Solicitation

      Procurement may determine, at its sole discretion, that it is in GRU's best interest to cancel a solicitation before the bid due date, either for the purpose of reissuing the solicitation or because there is no longer the need for the equipment, materials or services. Any responses to the solicitation received by Procurement will not be opened but will be maintained pursuant to the State of Florida’s Records Retention Schedules, as may be modified from time to time.

    • Anti-Human Trafficking

      Pursuant to section 787.06(13), Fla. Stat., when a Contract is executed, renewed, or extended the Contractor and any subcontractors must provide GRU with an affidavit, signed by an officer or a representative of the Contractor and any subcontractors under penalty of perjury, attesting that the Contractor and subcontractor does not use coercion of labor or services as those terms are defined in this section.

    • Modification or Withdrawal of a Response

      Changes to a vendor’s bid submittals in GRU's eProcurement Portal can be made up to the deadline date for the bid submittal.

      After responses have been opened, corrections to the response are permitted only to the extent that:

      1. Respondent can show by clear and convincing evidence that there was a material and substantial mistake in the preparation of its Response;
      2. the nature of the mistake is evident; and
      3. the intended pricing is evident.
    • Liquidated Damages

      Liquidated damages shall be assessed in the amount of $TBD

    • Rejection of Bids/Termination of Contract

      Previously solicited and/or accepted bids may be rejected or acceptance revoked prior to beginning of performance upon discovery by GRU that the bidder or its affiliates have committed any act which would have been cause for debarment, or were on the convicted vendor list prepared under the provisions of F.S. 287.133, as amended, at or prior to the acceptance of the bid.

      If GRU discovers, after a contract is awarded and performance has begun, that the bidder or its affiliates have committed any act subsequent to or prior to award or acceptance which would have been cause for debarment had it been discovered prior to award or acceptance, GRU may consider such to be a material breach of the contract and such shall constitute cause for termination of the contract.

    • Completion of Work

      Substantial Completion: The time at which the Work (or a specified part thereof) has progressed to the point where, in the opinion of Engineer, the Work (or a specified part thereof) is sufficiently complete, in accordance with the Contract Documents, so that the Work (or a specified part thereof) can be utilized for the purposes for which it is intended. The terms “substantially complete” and “substantially completed” as applied to all or part of the Work refer to Substantial Completion thereof.

      Final Completion: The date that the Owner receives and agrees with written notice from the Contractor stating that the Work has been completed and is ready for final payment.

    • Prohibition Against Consideration of Social, Political, or Ideological Interest in Government Contracting

      In accordance with Section 287.05701(2)(a), F.S. (2023), GRU may not request documentation of or consider a vendor's social, political, or ideological interests when determining if the vendor is a responsible vendor, and may not give preference to a vendor based on the vendor's social, political, or ideological interests.

    • Cancellation of Award

      Cancellation occurs when an issued purchase order or executed contract is voided, rescinded or terminated, or the delivered goods or work are rejected. If defective goods are received, an order is incorrect, or work is not performed in accordance with specifications, the user department shall contact Procurement before taking any action. In addition, departments must contact Procurement for assistance with canceling any purchase order or contract.

      Even after a bid has been awarded, Procurement may cancel the award or executed contract based on a bid error and may take action to reject performance when appropriate. If the contract is canceled at the request of the vendor, the vendor may be required to reimburse GRU for the difference between its bid and the next low bid.

    • Federal Regulatory Compliance

      The Contractor shall comply with all applicable federal regulations including, but not limited to:

      OSHA Standards

      • 29 CFR 1926 Subpart CC – Cranes and Derricks in Construction

      • 29 CFR 1926.1427 – Operator training, certification, and evaluation

      • 29 CFR 1910.179 – Overhead and gantry crane safety

      These regulations require that crane operators be properly trained, certified, and evaluated before operating crane equipment.

    • Compliance/Consistency with Scrutinized Companies Provisions of Florida Statutes.

      Section 287.135(2)(a), Florida Statutes, prohibits a company from bidding on, submitting a proposal for, or entering into or renewing a contract for goods or services of any amount if, at the time of contracting or renewal, the company is on the Scrutinized Companies that Boycott Israel List, created pursuant to section 215.4725, Florida Statutes, or is engaged in a boycott of Israel.  Section 287.135(2)(b), Florida Statutes, further prohibits a company from bidding on, submitting a proposal for, or entering into or renewing a contract for goods or services over one million dollars ($1,000,000.00) if, at the time of contracting or renewal, the company is on either the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, both created pursuant to section 215.473, Florida Statutes, or the company is engaged in business operations in Cuba or Syria.

      Accordingly, Contractor hereby certifies that Contractor is not listed on any of the following:

      • the Scrutinized Companies that Boycott Israel List, 
      • Scrutinized Companies with Activities in Sudan List, or 
      • the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List. 

      Contractor further hereby certifies that Contractor is not engaged in a boycott of Israel or engaged in business operations in Cuba or Syria. Contractor understands that pursuant to section 287.135, Florida Statutes, the submission of a false certification may subject  Contractor to civil penalties, attorney's fees, and/or costs. Contractor further understands that any contract with GRU for goods or services of any amount may be terminated at the option of GRU if Contractor

      • is found to have submitted a false certification, 
      • has been placed on the Scrutinized Companies that Boycott Israel List, or 
      • is engaged in a boycott of Israel. And, in addition to the foregoing, if the amount of the contract is one million dollars ($1,000,000.00) or more, the contract may be terminated at the sole option of GRU if the  Contractor is found to have submitted a false certification, has been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or has been engaged in business operations in Cuba or Syria.
    • Bid Bond

      A Bid Bond is required. Responses must be accompanied by a Bid Bond using the Bid Bond form provided and made payable to the City of Gainesville, d/b/a Gainesville Regional Utilities, in the amount of five percent (5%) of the price submitted. The Bid Bond amount will be paid to GRU if the successful Respondent fails to execute a Contract with GRU or accepts the receipt of the purchase order within fifteen (15) calendar days after award notice.

    • Conflict of Interest

      The Contractor represents and warrants that, to the best of its knowledge, no official or employee of the City of Gainesville, including Gainesville Regional Utilities (GRU), has a material financial interest in the Contractor’s business or any agreement resulting from the Contract or Purchase Order, nor will any such interest be acquired during the term of this Agreement. The Contractor agrees to comply with the provisions of Chapter 112, Florida Statutes, including but not limited to Section 112.313, pertaining to the ethical obligations and conflict of interest restrictions applicable to public officers and employees.

      The Contractor shall not knowingly participate in or cause any conduct that would violate Florida’s Code of Ethics for Public Officers and Employees. Any actual or potential conflict of interest shall be promptly disclosed in writing to GRU’s designated contract manager and GRU's Utilities Attorney. GRU reserves the right to terminate this Agreement immediately upon determination that a prohibited conflict of interest has occurred or been materially misrepresented.

    • Additional Applicable Federal Requirements

      Where federal funding applies, the Contractor shall also comply with:

      • Equal Employment Opportunity requirements (41 CFR 60)

      • Contract Work Hours and Safety Standards Act

      • Davis-Bacon Act (if applicable)

      • Copeland Anti-Kickback Act

      • Federal Occupational Safety and Health requirements

    • Captions and Section Headings

      Captions and section headings used herein are for convenience only and shall not be used in construing the Contract.

    • Terms of Award

      Award will be made to the lowest, responsive, responsible Respondent.

      1. GRU reserves the right to reject any and all Responses, or any part thereof, to waive any and all informalities or irregularities, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Responses. A responsible Respondent and any selected subcontractors, suppliers, other persons, and/or organizations proposed to perform or furnish the Work have the capacity in all respects to fully perform the Contract requirements and the experience, integrity, reliability, capacity, facilities, equipment, and credit to ensure good faith performance, such capacity and responsibility to be determined solely by GRU. GRU may conduct such investigation as GRU deems necessary to establish the responsibility, qualifications and financial ability of Respondent(s), proposed subcontractors, material suppliers, individuals, or entities to perform the Work in accordance with the Contract. Such information may include, but shall not be limited to, current financial statements, bank records, verifications of availability of equipment and personnel and past performance records.
      2. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
      3. If the Contract is awarded, GRU will give the successful Respondent a Notice of Intent to Award within sixty (60) calendar days after the Solicitation due date. All Responses must remain valid for sixty (60) calendar days from the Solicitation due date.
      4. When GRU gives a Notice of Award to the successful Respondent, it will be accompanied by the required number of unsigned counterparts of the Contract (or Purchase Order, as applicable) with all attachments. Within fifteen (15) calendar days thereafter, Respondent must sign and deliver the required number of counterparts of the Contract, attachments, and required Bonds, if applicable. GRU will ultimately provide a fully signed counterpart to the Respondent.
      5. Failure on the part of the successful Respondent to execute a Contract within fifteen (15) calendar days after the notice of acceptance may be just cause for annulment of award.
      6. GRU may then accept the Response of the next lowest, responsive, responsible Respondent or re-advertise the Solicitation. If the next lowest, responsive, responsible Response is accepted, this acceptance will bind such Respondent as though it was the original successful Respondent.
      7. Protests in respect to the intended award must be filed within three (3) calendar days of notice. It is the Respondent’s duty to be informed of the intended award and GRU’s protest procedures.
    • State of Florida Compliance

      The Contractor shall comply with all applicable Florida laws including:

      • Florida occupational safety requirements

      • Florida motor carrier and transportation regulations

      • Florida Department of Transportation oversize/overweight permitting requirements

      • Local permitting requirements within the City of Gainesville

    • Terms of Award

      Award will be made to the lowest, responsive, responsible Respondent based on the lump sum pricing less trade-in credits or based on the lump sum pricing only, as GRU determines to be in its best interest.

      1. GRU reserves the right to reject any and all Responses, or any part thereof, to waive any and all informalities or irregularities, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Responses. A responsible Respondent and any selected subcontractors, suppliers, other persons, and/or organizations proposed to perform or furnish the Work have the capacity in all respects to fully perform the Contract requirements and the experience, integrity, reliability, capacity, facilities, equipment, and credit to ensure good faith performance, such capacity and responsibility to be determined solely by GRU. GRU may conduct such investigation as GRU deems necessary to establish the responsibility, qualifications and financial ability of Respondent(s), proposed subcontractors, material suppliers, individuals, or entities to perform the Work in accordance with the Contract. Such information may include, but shall not be limited to, current financial statements, bank records, verifications of availability of equipment and personnel and past performance records.
      2. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
      3. If the Contract is awarded, GRU will give the successful Respondent a Notice of Intent to Award within sixty (60) calendar days after the Solicitation due date. All Responses must remain valid for sixty (60) calendar days from the Solicitation due date.
      4. When GRU gives a Notice of Award to the successful Respondent, it will be accompanied by the required number of unsigned counterparts of the Contract (or Purchase Order, as applicable) with all attachments. Within fifteen (15) calendar days thereafter, Respondent must sign and deliver the required number of counterparts of the Contract, attachments, and required Bonds, if applicable. GRU will ultimately provide a fully signed counterpart to the Respondent.
      5. Failure on the part of the successful Respondent to execute a Contract within fifteen (15) calendar days after the notice of acceptance may be just cause for annulment of award.
      6. GRU may then accept the Response of the next lowest, responsive, responsible Respondent or re-advertise the Solicitation. If the next lowest, responsive, responsible Response is accepted, this acceptance will bind such Respondent as though it was the original successful Respondent.
      7. Protests in respect to the intended award must be filed within three (3) calendar days of notice for purchases that do not require prior approval of the Gainesville Regional Utility Authority (GRUA), and within seven (7) calendar days for purchases that require prior approval of the Gainesville Regional Utility Authority (GRUA). It is the Respondent’s duty to be informed of the intended award and GRU’s protest procedures.
    • Permits and Transportation

      The Contractor shall be responsible for:

      • Securing transportation permits

      • Oversize load permits

      • Road use permits

      • Traffic control requirements (if applicable)

    • Surety Bond

      A Surety Bond is required in the amount of TBD to cover loss occasioned by theft and the hazards customarily covered by such bonds; such policy to cover losses by identifiable employees.  The surety or sureties shall be a company or companies satisfactory to GRU, in accordance with Florida Statutes.  The requirement of a Florida resident agent may be waived by GRU if evidence satisfactory to GRU is provided that applicable requirements have been met to permit service of process on a State office under Florida law.

    • Counterparts

      This agreement may be executed in any number of and by the different parties hereto on separate counterparts, each of which when so executed shall be deemed to be an original, and such counterparts shall together constitute but one and the same instrument.

    • Terms of Award

      Award will be made to the lowest, responsive, responsible Respondent based on all line items combined or any combination of line items GRU determines to be in its best interest. GRU may not award a particular line item(s).

      1. GRU reserves the right to reject any and all Responses, or any part thereof, to waive any and all informalities or irregularities, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Responses. A responsible Respondent and any selected subcontractors, suppliers, other persons, and/or organizations proposed to perform or furnish the Work have the capacity in all respects to fully perform the Contract requirements and the experience, integrity, reliability, capacity, facilities, equipment, and credit to ensure good faith performance, such capacity and responsibility to be determined solely by GRU. GRU may conduct such investigation as GRU deems necessary to establish the responsibility, qualifications and financial ability of Respondent(s), proposed subcontractors, material suppliers, individuals, or entities to perform the Work in accordance with the Contract. Such information may include, but shall not be limited to, current financial statements, bank records, verifications of availability of equipment and personnel and past performance records.
      2. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
      3. If the Contract is awarded, GRU will give the successful Respondent a Notice of Intent to Award within sixty (60) calendar days after the Solicitation due date. All Responses must remain valid for sixty (60) calendar days from the Solicitation due date.
      4. When GRU gives a Notice of Award to the successful Respondent, it will be accompanied by the required number of unsigned counterparts of the Contract (or Purchase Order, as applicable) with all attachments. Within fifteen (15) calendar days thereafter, Respondent must sign and deliver the required number of counterparts of the Contract, attachments, and required Bonds, if applicable. GRU will ultimately provide a fully signed counterpart to the Respondent.
      5. Failure on the part of the successful Respondent to execute a Contract within fifteen (15) calendar days after the notice of acceptance may be just cause for annulment of award.
      6. GRU may then accept the Response of the next lowest, responsive, responsible Respondent or re-advertise the Solicitation. If the next lowest, responsive, responsible Response is accepted, this acceptance will bind such Respondent as though it was the original successful Respondent.
      7. Protests in respect to the intended award must be filed within three (3) calendar days of notice for purchases that do not require prior approval of the Gainesville Regional Utility Authority (GRUA), and within seven (7) calendar days for purchases that require prior approval of the Gainesville Regional Utility Authority (GRUA). It is the Respondent’s duty to be informed of the intended award and GRU’s protest procedures.
    • Attachments

      All exhibits attached to the Contract are incorporated into and made part of the Contract by reference.

    • Scheduling and Dispatch

      GRU will issue work requests as needed.

      The Contractor shall:

      • Provide response within a reasonable timeframe

      • Provide estimated arrival times

      • Coordinate scheduling with GRU representatives

    • Insurance

      Any vendor coming on GRU property to do any type of work including meetings or doing work in our service territory on behalf of GRU must provide a Certificate of Liability Insurance (COLI) meeting the below requirements before any work will commence.

      Risk Management requires all the base coverages of General Liability, Automobile Liability, and Workers Compensation. Below are the recommended coverage amounts by Risk Management for these categories. Excess or Umbrella coverage is recommended by Risk Management in the amount below in most cases. The Workers Compensation amount is statutory and the minimum amount that Workers Compensation policies can be sold in Florida.

      The COLI needs to list Gainesville Regional Utilities, 301 Southeast 4th Avenue, Gainesville, Florida 32601 as the Certificate Holder and the language provided in the next section. COLI’s with GRU as “Certificate Holder” status only is not acceptable. Certificate Holder is used to show proof of insurance and does not provide access to the coverages disclosed on the Certificate of Liability Insurance.

      All COLI’s must list under the Description of Operations section the below language:

      "Gainesville Regional Utilities, their subsidiaries, affiliates, and their respective officers, agents and employees are included as additional insured.”

      Insurance is required in the amounts set forth below:

      • Commercial General Liability: $1,000,000 combined single limit for bodily injury and property damage.
      • Automobile Liability: $500,000 combined single limit for bodily injury and property damage.
      • Workers Compensation:
        • State (Florida): Statutory
        • Applicable Federal: Statutory
        • Employer’s Liability:
          • $500,000 per Accident
          • $500,000 Disease, Policy Limit
          • $500,000 Disease, Each Person
    • Terms of Award

      Award will be made to the best evaluated Respondent(s) for Response(s) based on TBD for each individual line item, or any combination of line items, as GRU determines to be in its best interest.

      1. GRU reserves the right to reject any and all Responses, or any part thereof, to waive any and all informalities or irregularities, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Responses. A responsible Respondent and any selected subcontractors, suppliers, other persons, and/or organizations proposed to perform or furnish the Work have the capacity in all respects to fully perform the Contract requirements and the experience, integrity, reliability, capacity, facilities, equipment, and credit to ensure good faith performance, such capacity and responsibility to be determined solely by GRU. GRU may conduct such investigation as GRU deems necessary to establish the responsibility, qualifications and financial ability of Respondent(s), proposed subcontractors, material suppliers, individuals, or entities to perform the Work in accordance with the Contract. Such information may include, but shall not be limited to, current financial statements, bank records, verifications of availability of equipment and personnel and past performance records.
      2. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
      3. If the Contract is awarded, GRU will give the successful Respondent a Notice of Intent to Award within sixty (60) calendar days after the Solicitation due date. All Responses must remain valid for sixty (60) calendar days from the Solicitation due date.
      4. When GRU gives a Notice of Award to the successful Respondent, it will be accompanied by the required number of unsigned counterparts of the Contract (or Purchase Order, as applicable) with all attachments. Within fifteen (15) calendar days thereafter, Respondent must sign and deliver the required number of counterparts of the Contract, attachments, and required Bonds, if applicable. GRU will ultimately provide a fully signed counterpart to the Respondent.
      5. Failure on the part of the successful Respondent to execute a Contract within fifteen (15) calendar days after the notice of acceptance may be just cause for annulment of award.
      6. GRU may then accept the Response of the next lowest, responsive, responsible Respondent or re-advertise the Solicitation. If the next lowest, responsive, responsible Response is accepted, this acceptance will bind such Respondent as though it was the original successful Respondent.
      7. Protests in respect to the intended award must be filed within three (3) calendar days of notice for purchases that do not require prior approval of the Gainesville Regional Utility Authority (GRUA), and within seven (7) calendar days for purchases that require prior approval of the Gainesville Regional Utility Authority (GRUA). It is the Respondent’s duty to be informed of the intended award and GRU’s protest procedures.
    • Responsible/Responsive Bidder

      A responsible bidder has the capability to perform the contract requirements in all respects, including the experience, integrity, reliability, capacity, facilities, equipment, and good credit, which will help assure good faith performance. A bidder’s qualifications may be considered in making an award recommendation. GRU has the right to verify the qualifications of a bidder as GRU deems appropriate either before or after the bid opening.

      A responsive bidder has submitted a bid which fully conforms in all material respects to the solicitation’s requirements, as determined solely by GRU. “Material” respect refers to factors of importance which help to ensure that the bidder will adequately comply with the prerequisites of the solicitation by performing the work in the manner specified, or providing equipment or goods meeting specifications.

      If GRU determines either that a bidder is not responsible, or the bid submitted is nonresponsive, written notice will be sent by the Purchasing representative to the bidder, setting forth the basis of the finding. The failure of a bidder to promptly supply such information to support their company’s capabilities as may be requested by the Purchasing representative may be grounds for GRU to determine that the bidder is not responsible. Similarly, the failure of a bidder to promptly supply information in connection with an inquiry may be grounds for a determination of non-responsiveness.

      GRU may, in the exercise of its sole discretion, require a prequalification process in connection with any bid. In such case, a prequalification form is sent to bidders to complete which helps GRU assess the bidder’s qualifications and experience. Bidders are notified whether or not they qualify to participate in the solicitation. The form may also be modified for submittal with the bid response based on the type of goods or services needed. If a prequalification process is not used, GRU may also elect to award the solicitation based on an evaluated process.

    • Contractor Responsibilities

      The Contractor shall:

      • Provide competent supervision

      • Maintain safe work practices

      • Coordinate with GRU personnel

      • Protect GRU property and infrastructure

      • Comply with all applicable environmental and safety regulations

    • Discussions and Best and Final Officer

      It is anticipated that the evaluation committee may have discussions based on written proposals received by responsive Respondents. GRU reserves the right to waive discussions should it be deemed unnecessary.

      GRU may, at its sole discretion, conduct a Best and Final Offer (BAFO) round to this solicitation. Should this round be conducted, the Procurement Representative will issue a request to include instructions, deadline, and addenda as applicable.

    • Damage or Incident Reporting

      Any incident involving:

      • Property damage

      • Equipment failure

      • Injury

      • Near-miss events

      must be reported to GRU immediately.

    • Notification of Award

      Purchasing will notify bidders of the recommended award of the contract with reasonable promptness. The notification will be through an award letter, issuance of a purchase order, execution of a contract or other appropriate means of communication. Purchasing will be responsible for obtaining required submittals from the successful bidder such as the insurance certificate, bonds, purchase order acceptance or contract, as required.

    • Documentation

      Upon request, the Contractor shall provide:

      • Operator certifications

      • Equipment inspection records

      • Maintenance records

      • Lift plans (when required)

      • Safety documentation

    • Multiple Awards

      If bid documents provide for award to more than one bidder, multiple awards may be made to bidders under one solicitation. The provision to make multiple awards should be considered when it appears likely that the equipment, materials, or services available from a sole bidder will not meet the needs of GRU or it is in the best interest of GRU to purchase from multiple vendors.

    • Warranty/Guarantee

      Contractor warrants and guarantees to GRU that all materials will be new unless otherwise specified and that all Work will be of a quality free from defects and in accordance with the Specifications. Contractor agrees to remedy promptly, and without cost to GRU, any defective materials or workmanship which appear within the stated warranty period.

      No provision contained in the Specifications shall be interpreted to limit Contractor’s liability for defects. No provision contained in the Specifications shall be interpreted to limit the terms and conditions of the manufacturer's warranty and Contractor will secure parts, materials and equipment to be installed with manufacturer's full warranty as to parts and service wherever possible. Contractor must indicate if any warranty is being provided by either Contractor or a manufacturer and if any such warranty is being provided, such warranty will be stated. When the manufacturer warrants the equipment or materials being supplied, Contractor must provide such warranty to GRU or must state as a Clarification and Exception the reason Contractor is not able to provide such warranty.

      All labor shall be warranted for a minimum of one year. For materials, the Manufacturer’s warranty applies.

    • General Requirements

      The selected contractor(s) shall provide as-needed crane services to support Pasadena Water and Power’s (PWP) electrical infrastructure projects, including the installation, removal, and relocation of power poles, transformers, switchgear, and other electrical equipment. The contractor shall furnish all necessary equipment, personnel, and materials to perform the work safely and efficiently in accordance with applicable industry regulations and City requirements. The work covered in these Specifications shall be at various locations throughout the City of Pasadena and PWP service territory.

      The contractor shall:

      • Provide crane services on an as-needed basis, including scheduled work and emergency response.
      • Supply appropriately sized cranes, rigging equipment, and certified personnel to safely lift and position power poles, transformers, switchgear, and related equipment.
      • Ensure compliance with OSHA, CAL/OSHA, ANSI, and other applicable safety regulations for all lifting and rigging operations.
      • Provide qualified and certified crane operators and rigging personnel with experience in utility infrastructure work.
      • Coordinate with PWP crews to ensure safe and efficient execution of work.
      • Maintain equipment in good working condition, with routine inspections and compliance with manufacturer specifications.
      • Be available for both regularly scheduled work and emergency response, with response times specified in the contract.
      • Obtain and maintain all necessary permits, licenses, and insurance coverage as required by the City and regulatory agencies.
      • Provide detailed lift plans for complex or high-risk lifts, as requested by PWP.

      The resulting contract(s) will be for a multi-year term, with work performed on an as-needed basis. Bidders must demonstrate experience in utility-related crane operations and provide proof of appropriate licensing, certifications, and insurance coverage.

    • Term of Contract

      The term of this Contract shall commence on the July 1, 2026 and terminate on June 30, 2029.

      Upon mutual agreement between Parties, this contract may be renewed for One (1) three (3) year additional years.

      Beyond the extensions described above, this Contract may be extended for an additional six (6) months to allow for completion of a new solicitation.

    • Hours of Operation

      Normal work hours are Monday thru Friday, excluding holidays, between the hours of 7:00 A.M. and 5:00 P.M. Overtime is any work time performed outside the hours of 7:00 A.M. to 5:00 P.M.

    • Safety and Security

      Each location has unique safety and security procedures and guidelines that must be followed. Acceptance of a project or work assignment in a particular location will be an acceptance of the safety and security requirements for that location. GRU will provide the safety and security requirements along with the scope of work requested. The Contractor shall at all times take all reasonable precautions for the safety of its employees engaged in services and shall comply with all safety laws, rules and regulations as mentioned in the contractor's safety orientation and/or manual as instruction may be site specific.

      Confinement to Work Area/Parking: Contractor's employees shall stay in the designated work area to the maximum extent possible and shall not traverse other areas of GRU’s site except for travel to and from sanitary facilities or designated parking areas. Contractor and its employees shall park personal vehicles and equipment in areas designated by GRU.

      Sanitation: If sanitary facilities are available near the work site, Contractor may request GRU’s permission to use such facilities by its employees, obtaining written permission from GRU prior to the use of such facilities. Unless such permission has been obtained, Contractor is responsible for the cost, provision and maintenance of sanitary facilities for persons employed by Contractor. If responsible for providing sanitary facilities, Contractor is also responsible for all labor and supplies necessary to maintain such facilities and must comply with the State Board of Health requirements. Upon completion of the Work, facilities must be removed from the site.

      Personal Protection Equipment: The following requirements apply during a Pandemic, Epidemic, Sporadic, Endemic or Outbreaks event.

      1. The Contractorshall supply all safety and personal protective equipment (PPE) required to complete the scope of the contracted work (or as stated in the Contract). Equipment supplied by the Contractor must meet or exceed all GRU requirements and the requirements of the appropriate governmental regulatory agency
      2. It is the sole responsibility of the Contractor to supply and train all workers with reasonably anticipated occupational potential exposure to any workplace hazards.
      3. This training includes when to use PPE; what PPE is necessary; how to properly put on, use, and take off PPE; how to properly dispose of or disinfect, inspect for damage, and maintain PPE; and the limitations of PPE.
      4. Protocols should be in place to prevent or reduce the likelihood of exposure and be in compliance with operating site PPE requirements. Local, state, and federal mandates must be followed.
    • Lobbying

      To ensure fair consideration and consistent and accurate dissemination of information for all proposers, GRU prohibits communication to or with any department, employee, or agent evaluating or considering the proposals during the submission process, except as authorized by the contact person. During the blackout period no person may lobby, as defined herein, on behalf of a competing party in a particular procurement process, GRU officials or employees except the Procurement designated staff contact in the Procurement Department. Violation of this provision shall result in disqualification of the party on whose behalf the lobbying occurred. Lobbying means when any natural person, for compensation, seeks to influence the governmental decision-making, to encourage the passage, defeat or modification of any proposal, recommendation or decision by GRU officials and employees, except as authorized by procurement documents.

    • Warranty of Title

      Contractorwarrants that it holds and shall transfer unencumbered title of the property to GRU and further warrants that it has the right and authority to transfer the title to the property.

    • Emergency Response Services

      The vendor must be available for rapid response to provide emergency crane services for unforeseen events affecting the power distribution system.

      Response Time Requirements:

      • 4-Hour Response Time – Applies to 15- to 90-ton cranes.
        6-8 Hour Response Time – Applies to 120+ ton cranes, allowing for additional transport and setup time.


      Emergency services include, but are not limited to:

      • Storm Response – Assisting in power restoration by replacing poles, transformers, and electrical equipment damaged by high winds, flooding, or other natural disasters.
        Traffic Accident Recovery – Removing damaged poles and electrical equipment after vehicle collisions to ensure safe and efficient site clearance.
        Equipment Failure Response – Providing immediate crane support for transformer or switchgear failures requiring replacement to restore electrical service.
        Fire-Damaged Infrastructure Removal – Hoisting and removing power poles, transformers, and electrical enclosures damaged by fire.
        Structural Failure Mitigation – Assisting with stabilization and controlled removal of structurally compromised electrical infrastructure.

      Contractor Responsibilities:

      • Provide a dedicated emergency point of contact (POC) with 24/7 availability for dispatching emergency services.
      • Ensure all required permits are secured in advance or expedited when necessary.
      • Maintain pre-positioned equipment or rapid mobilization capabilities to meet response time commitments.
      • Confirm crane and crew availability before accepting an emergency dispatch request.
      • Failure to meet response time requirements may result in disqualification from future emergency work.
    • Blackout Period

      Respondents to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the agency posting the notice of intended award, excluding Saturdays, Sundays, and state holidays, any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the procurement officer or as provided in the solicitation documents.  Violation of this provision may be grounds for rejecting a response.

    • NERC CIP Compliance Requirements

      Pursuant to federally mandated security standards from the North American Electric Reliability Corporation (NERC) regarding Critical Infrastructure Protection (CIP), GRU has implemented specific requirements for any contract employee requiring access to protected systems and facilities. These requirements are outlined in NERC Standard “CIP-004-6 Table R3 – Personnel Risk Assessment Program” and apply to anyone who shall have physical and/or electronic access to these designated locations. Compliance verification for an employee, including annual training as well as a qualified criminal history background screening, will be required prior to granting that employee authorized access to the designated protected systems and/or facilities.

    • Special Requirements/Responsibilities/Procedures
      • The contractor shall obtain all necessary Road and Traffic permits from the City’s Transportation and Police Departments to execute the work for all their cranes or any heavy / over-size equipment.
      • Contractor shall comply with the applicable safety provisions of OSHA and the City of Pasadena for construction project(s).
      • All construction practices specified in the California General Orders # 95 and #128 are applicable. If any conflict of the Rules is found, the more stringent ones shall be followed.
      • The Contractor shall comply with all applicable federal, state, and local laws and regulations concerning the use/operation of cranes or any other heavy equipment to be used.
      • Upon notice of a project, the Contractor shall contact the PWP project lead or PWP Project Manager for the specific project within 24 hours to coordinate the activities related to the specific task and schedule a joint job-site inspection.
      • Contractor shall always comply with City Traffic Control Requirements as applicable.
      • Before starting work, the Contractor shall designate an authorized Field Supervisor who shall have the authority to represent and act for the Contractor.
      • The authorized Field Supervisors of the Contractor shall have the responsibility of explaining the work procedure and the crane operations to his or her staff for each individual service order after the walk-thru meeting (s) with the City supervisor on the job.
      • Contractors’ authorized Field Supervisor shall always examine the local conditions for proper clearances for operation of all equipment and take all measures needed to accomplish the project/job in a Safe manner.
    • Rental Hourly Rate and Minimum Rental Time

      Rental time is based on equipment being in service at the City facility. The cost per hour bid shall be inclusive of the following: equipment, operator, fuel, and standard setup. The City will not pay additional charges for operator travel time, standby time, or administrative fees.

    • Florida Trench Safety Act

      The State of Florida incorporates the Occupational Safety and Health Administration’s (OSHA) excavation safety standards, 29 C.F.R. 1926.650 Subpart P, as its standard (Sections 553.60-64, F.S.). The Contractor/Respondent shall list separately in their Proposal the cost of compliance with these standards on a lineal footage basis and the method of compliance. The respondent shall determine if special shoring requirements are needed. Special shoring shall be identified and priced on a square footage basis in the Proposal. The Successful Respondent is fully responsible for the design of the trench safety system and the compliance with the applicable standards for the project.

    • Collusion

      Only one (1) response from any individual, firm, corporation, organization or agency under the same or different name will be considered for this Solicitation. Submission of more than one response may result in the rejection of all responses from the Respondent.

      Respondent, by signing the Respondent’s Certification Form, declares that the Response is made without any previous understanding, agreement, or connections with any persons, firms, or corporations responding on the same items and that it is in all respects fair and in good faith without any outside control, collusion or fraud. A non-exclusive manufacturer/distributor relationship does not, in and of itself, constitute a prior understanding, agreement, connection or collusion between Responders.

      By responding to the Solicitation, the Respondent acknowledges that it has not offered or given any gift or compensation to any GRU officer or employee to secure favorable treatment with respect to being awarded this Contract.

    • Affirmative Socioeconomic Steps

      If subcontracts are to be let, the prime contractor is required to take all necessary steps identified in 2 C.F.R. §200.321(b)(1)-(5) to ensure that small and minority businesses, women’s business enterprises, and labor surplus firms are used when possible.  Those steps are outlined below:  

      1. Placing qualified small and minority businesses and women’s business enterprises on solicitation lists.
      2. Assuring that small and minority businesses, and women’s business enterprises are solicited whenever there are potential sources.
      3. Dividing total requirements, when economically feasible, into smaller task or quantities to permit maximum participations by small and minority businesses, and women’s business enterprises.
      4. Establishing delivery schedules, where the requirement permits, which encourage participation by small and minority businesses, and women’s business enterprises.
      5. Using the services and assistance, as appropriate, of such organizations as the Small Business Administration and the Minority Business Development Agency of the Department of Commerce.

      Definitions:

      Small Business (SBE):  A business that is independently owned and operated and is qualified as a small business under the Small Business Administration criteria and size standards at 13 C.F.R. Part 121.

      Women’s Business Enterprise (WBE): A business enterprise that is (a) at least 51% owned by one or more women, or in the case of a publicly owned business, at least 51% of the stock is owned by one or more women; and (b) whose management and daily operations are controlled by one or more women. (13 C.F.R. Part 127)

      Minority Business (MBE) :  A business that is (a) at least 51% owned by one or more minority group members, or in the case of a publicly owned business, at least 51% of the stock is owned by one or more minority group members; and (b) whose management and daily operations are controlled by one or more minority group members. (13 C.F.R. § 124.103, 13 C.F.R. § 124.102, and 13 C.F.R § 124.105).

      Labor Surplus Area (LSA):  A locality, defined by the Department of Labor’s Employment and Training Administration, that has a civilian average annual unemployment rate during the previous two calendar years of 20% or more above the average annual civil unemployment rate for all states during that same period. (20. C.F.R. §§ 654.4-654.5).  There is an “Exceptional Circumstance Consideration Provision” that allows a civil jurisdiction to ask for inclusion in the LSA list after it is published, due to events such as COVID-19, natural disasters, and other adverse economic changes.

      Labor Surplus Area Firm (LSAF):  A firm that together with its first-tier subcontractors will perform substantially in LSAs as identified by the Department of Labor in accordance with 20 C.F.R. § 654.  Performance is substantially in LSAs if the costs incurred under the contract on account of manufacturing, production, or performance of appropriate services in labor surplus areas exceed 50% of the contract price (40 C.F.R. § 33.103).

    • Bid Item Categories & Pricing Structure

      The following bid item categories define the scope of services required for crane rental operations. Bidders shall provide unit pricing for each applicable category.
      Multi-Year Pricing Structure
      This contract includes three bid tables:

      • Contract Year 1 Pricing
      • Contract Year 2 Pricing
      • Contract Year 3 Pricing

      Bidders must submit pricing for all three contract years in the appropriate tables. If a bidder anticipates price adjustments over the contract term, they should reflect these changes in the Contract Year 2 and Contract Year 3 tables accordingly. If pricing remains the same for all three years, bidders may repeat the same values in each table.

      All bid items, descriptions, and unit structures remain identical across all contract years to ensure consistency and comparability during bid evaluation.

      Fuel Costs: All fuel costs must be included in the bid prices. The City will not accept separate fuel surcharges or markups. Bidders should incorporate any anticipated fuel-related costs within their standard pricing structure.

      ________________________________________
      Crane Rental Services (Hourly Rates)

      Bidders shall provide an hourly rental rate for each crane size. The minimum rental time per day shall be four hours. The City will not pay for operator standby time unless work is delayed due to reasons outside the vendor’s control.

      • Bidders shall provide an hourly rental rate for cranes ranging from 15-ton to 300-ton capacity for each contract year.
      • The hourly rate shall include:
        • Crane equipment
        • Operator
        • Fuel
        • Standard setup and positioning at the worksite
      • Exclusions: Mobilization, demobilization, and permit fees shall be covered under separate bid items.

      ________________________________________

      Permit Fee (Per Permit)
      Permit Requirements: Certain jurisdictions may require permits for crane mobilization and demobilization (e.g., oversize/overweight travel permits). Bidders shall provide a fixed per-permit rate to cover these costs.

      Vendor Responsibility:

      • The vendor is responsible for obtaining all required permits.
      • The City will not secure permits or reimburse penalties due to vendor non-compliance.

      Bid Pricing & Scope:

      • Fixed Cost Per Permit – Bidders shall submit a uniform per-permit cost.
      • Applies to Any Required Permit – The rate applies regardless of the agency issuing the permit.
      • No Additional Fees Allowed – The per-permit price must include all processing and administrative costs.

      ________________________________________

      Mobilization & Demobilization (Fixed Per-Job Fees)

      • Mobilization and demobilization fees shall cover the cost of transporting cranes to and from job sites.
      • Fees shall be fixed per job and bid separately for:
        • Small cranes (40-90 tons)
        • Large cranes (15-300 tons)
      • Fees shall include:
        • Transportation logistics and coordination
          Pilot/escort vehicle coordination
          Route planning

      ________________________________________

      Support Equipment & Personnel (Daily Rates)

      • Bidders shall provide hourly rental rates for additional equipment and support personnel required for lifting operations.
      • Equipment and services include:
        • Support trucks/vehicles
        • Pilot cars for oversized load transport
        • Spreader bars for load stabilization
        • Man baskets for personnel hoisting
        • Custom rigging equipment (chains, slings, shackles, etc.)

      Daily Rate Definition: A “day” shall be defined as a maximum of 8 working hours. If equipment is required beyond 8 hours, additional charges shall be billed at a pro-rated daily rate or overtime hourly rate as specified by the bidder.

      ________________________________________
      Labor Rates (Hourly Rates for Crew)

      • Bidders shall provide hourly rates for qualified labor required for crane operation and rigging.
      • Pricing shall be provided for:
        • One-Man Crew (Operator only)
        • Two-Man Crew (Operator & Rigger)
      • Overtime labor rates shall be bid separately.

      ________________________________________

      Emergency Response Services

      Emergency response services apply to urgent work requiring expedited crane deployment. Vendors shall provide pricing for rapid mobilization as follows:

      • 4-Hour Response Time – Applies to 40- to 90-ton cranes.
      • 6-8 Hour Response Time – Applies to 120+ ton cranes, allowing for additional transport and setup time.

      Vendor Responsibility:

      • Vendors must have a crane ready for dispatch within the required timeframe.
      • All required permits must be obtained in advance or expedited for emergency work.
      • Failure to meet response time requirements may result in disqualification from future work.
    • Contractor Responsibilities

      Contractor will recruit, screen, interview, hire and assign its employees to perform the work pursuant to the Contract or Purchase Order; compensate its employees for hours worked at GRU; withhold and transmit payroll taxes, provide unemployment insurance and workers’ compensation benefits; and handle unemployment and workers’ compensation claims involving employees.

      Contractor shall obtain background check and drug screening services of its employees who will perform work at GRU locations.  To ensure compliance with the Fair Credit Reporting Act, Contractor will not provide copies of such background check or drug screening results to GRU but will instead provide an attestation of completion of such services to GRU. Background check services may be conducted by one or more of Contractor’s preferred, third-party vendors (e.g., Hire Right, A-Check Global).

      Contractor shall require all of the Employees to self-report in writing to Contractor within forty-eight hours any incidents of arrests by local, state or federal law enforcement agencies.  If the Employee is unable to report in writing due to incarceration or confinement, the Employee shall notify Contractor within forty-eight (48) hours after the arrest by text message, email, phone call, or voicemail. In addition, all Employees holding a Commercial Driver’s License (CDL) as a condition of employment shall self-report, in writing, to Contractor  within forty-eight (48) hours after any citations, arrests, or charges disqualifying the Employee from holding a CDL.

    • Debarment/Suspension/Termination

      The Procurement representative is authorized to suspend a vendor from consideration for award of contracts if there is probable cause to believe that the vendor has engaged in activity which might lead to debarment. The suspension shall be for a period not to exceed three months. After reasonable notice to the vendor involved and reasonable opportunity for that vendor to be heard, the Procurement representative, after consulting with the GRU Attorney, is authorized to debar a vendor for cause from consideration for award of contracts. The debarment shall be for a period of not more than three years. The causes for debarment include:

      1. Conviction for commission of a criminal offense as an incident to obtaining or attempting to obtain a public or private contract or subcontract, or in the performance of such contract or subcontract, within five years of a proposed award;
      2. Conviction under State or Federal statutes of embezzlement, theft, forgery, bribery, falsification or destruction of records, receiving stolen property, or any other offense indicating a lack of business integrity or business honesty which currently, seriously, and directly affects responsibility as a GRU contractor, within five years of a proposed award;
      3. Conviction under state or federal antitrust statutes arising out of the submission of bids or proposals, within five years of a proposed award;
      4. Violation of contract provisions, as set forth below, of a character which is regarded by the Procurement representative to be so serious as to justify debarment action, within five years of a proposed award:
        1. Deliberate failure without good cause to perform in accordance with the specifications or within the time limit provided in the contract; or
        2. A record of failure to perform or of unsatisfactory performance in accordance with the terms of one or more contracts; provided that failure to perform or unsatisfactory performance caused by acts beyond the control of the contractor shall not be considered to be a basis for debarment.
      5. For any provision of, or offer, gift or agreement to provide, any gratuity, kickback or offer of employment to any current or former GRU employee in connection with any decision, approval, disapproval, recommendation, or preparation of any part of a program requirement or a purchase requisition, influencing the content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any other advisory capacity in any proceeding or application, request for ruling, determination, claim or controversy or other particular matter, pertaining to any program requirement or a contract or subcontract, or to any solicitation or proposal, within three years of a proposed award;
      6. For any payment, gratuity, kickback or offer of employment to be made by or on behalf of a subcontractor under a contract to the prime contractor or higher tier subcontractor or any person associated therewith, as an inducement for the award of a subcontract or order, within three years of a proposed award;
      7. For retaining a person or soliciting or securing a GRU contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, except for retention of bona fide employees or bona fide established commercial selling agencies for the purpose of securing business, within three years of a proposed award;
      8. During the period of a contract with GRU, employing, or offering employment to, any current GRU employee participating directly or indirectly in the procurement process, within three years of a proposed award;
      9. Any other cause the Procurement representative determines to be so serious and compelling as to affect responsibility as a GRU contractor, including debarment by another governmental entity for any cause listed in this Section.

      REJECTION OF BIDS/TERMINATION OF CONTRACT

      Previously solicited and/or accepted bids may be rejected or acceptance revoked prior to beginning of performance upon discovery by GRU that the respondent or its affiliates have committed any act which would have been cause for debarment, or were on the convicted vendor list, at or prior to the acceptance of the bid.

      If GRU discovers, after a contract is awarded and performance has begun, that the respondent or its affiliates have committed any act subsequent to or prior to award or acceptance which would have been cause for debarment had it been discovered prior to award or acceptance, GRU may consider such to be a material breach of the contract and such shall constitute cause for termination of the contract.

    • Safety and Hazard Responsibility
      • Contractor shall be solely responsible for maintaining a safe worksite and for implementing, at its own cost and expense, all safety, and hazard prevention measures required by Occupational Safety and Health Administration (OSHA), National Fire Protection Association (NFPA), and all applicable federal, state, and local laws, regulations, and codes. This includes, without limitation, providing confined space attendants and air monitoring equipment, fire watch during and after any hot work, maintaining fire extinguishers and safety equipment, securing the work area against hazards, and promptly removing combustible materials. Contractor shall ensure that all subcontractors and other parties engaged by Contractor comply fully with these obligations.
      • Contractor shall complete safety documents with Purchaser personnel that may include a pre-task checklist and require a Job Hazard Analysis (“JHA”) component to promote awareness of potential hazards and suggested mitigation measures, at Purchaser’s sole discretion. Additional permits may be required depending on the scope of work. Contractor acknowledges and agrees that Purchaser’s safety documents are supplemental only, are not intended to be exhaustive or comprehensive, and shall not be relied upon as a complete identification of all potential hazards. Contractor remains solely responsible for identifying, analyzing, and mitigating all hazards associated with its work, including the work of its subcontractors, and for conducting its own job-specific hazard analysis and safety planning.
      • Purchaser reserves the right, but not the obligation, to monitor the worksite for unsafe conditions. If Purchaser reasonably determines that Contractor’s or its subcontractors’ operations pose an imminent threat to health, safety, or property, Purchaser may direct Contractor to stop work until the condition is corrected. Contractor shall promptly comply with such directive and shall not be entitled to any additional compensation or time extension. If Contractor or its subcontractors fail to provide required fire watch, safety measures, or hazard controls, Purchaser may, but is not obligated to, provide such measures directly or through a third party, and the cost shall be back charged to Contractor and deducted from amounts otherwise due under the Purchase Order.
      • The presence of any fire protection, alarm, suppression, or other safety systems or equipment owned or maintained by Purchaser shall not relieve Contractor of its obligations under this Section. Contractor remains fully responsible for fire watch, hazard prevention, and all other safety measures required for its work, regardless of the operation, adequacy, or failure of Purchaser’s systems. Failure to comply with this Section shall subject Contractor to the indemnification obligations set forth elsewhere in the Contract or Purchase Order.
      • Contractor shall immediately notify Purchaser of any incident, near miss, injury, property damage, or unsafe condition occurring at the worksite, and shall cooperate fully with Purchaser in any related investigation.
    • Order of Precedence

      In the event that there is any conflict between the terms and conditions, the order of precedence shall be as follows:

      • Any modification to the Contract or Purchase Order
      • Contract or Purchase Order
      • GRU Technical Specifications
      • GRU Supplemental Conditions
      • GRU General Conditions
      • GRU Instructions
      • Contractor Response
    • Use of Contract by Other Governmental Entities

      Other governmental entities may purchase goods and/or services under this NO VALUE without prior approval from GRU, subject to acceptance by the NO VALUE. Any such use shall be optional for and at the sole risk and responsibility of NO VALUE. The NO VALUE may, but is not obligated to, extend the same pricing, terms, and conditions of this NO VALUE to a participating governmental entity.

      Any such purchases by a participating governmental entity shall be solely between the NO VALUE and that entity. The participating governmental entity shall be responsible for all aspects of NO VALUE  administration, including, but not limited to, ordering, inspection, acceptance, and payment.

      Each participating governmental entity shall be responsible for determining that its use of this NO VALUE complies with its own procurement requirements and applicable law. GRU makes no representation or warranty regarding the legality, appropriateness, or availability of this NO VALUE for use by any other governmental entity. Any use by another governmental entity shall be at the sole risk and responsibility of that entity.

      This solicitation and resulting NO VALUE were conducted solely for GRU’s own use. Any use by another governmental entity is incidental and shall not be construed as creating a cooperative purchasing contract, shared procurement, or joint solicitation.

      GRU shall have no involvement in, nor liability for, any transactions between the NO VALUE and any participating governmental entity. Use of this NO VALUE by another governmental entity shall not modify the terms, conditions, scope, or duration of this NO VALUE , nor shall it affect the NO VALUE’s obligations to GRU.

    Submission Requirements

    • Respondent Certification Form (required)

      "I hereby propose to provide the goods/services requested in this Solicitation. I agree to hold pricing for at least 60 calendar days from the Solicitation due date. I agree that GRU’s terms and conditions herein take precedence over any conflicting terms and conditions submitted for GRU’s consideration, and agree to abide by all conditions of this Solicitation.

      I certify that all information contained in this Response is truthful to the best of my knowledge and belief. I further certify that I am duly authorized to execute and submit this Response on behalf of the organization as its agent and that the organization is ready, willing and able to perform if awarded.

      I further certify that this Response is made without prior understanding, agreement, connection, discussion, or collusion with any other person, company or corporation submitting an offer for the same product or service; and the undersigned executed this Respondent’s Certification with full knowledge and understanding of the matters therein contained."

      Please download the below documents, complete, and upload.

    • Drug-Free Workplace Certification Form (required)

      Please download the below documents, complete, and upload.

      "Preference may be given to a business that certifies that it has implemented a drug-free workplace program. Pursuant to Section 287.087, Florida Statutes, whenever two or more competitive solicitations that are equal with respect to price, quality, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services, a response received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie responses will be followed if none of the tied providers has a drug free workplace program. In order to have a drug-free workplace program, a business shall:

          1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.
          2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.
          3. Give each employee engaged in providing the commodities or contractual services that are under proposal a copy of the statement specified in Subsection (1).
          4. In the statement specified in Subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under proposal, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of Chapter 893, Florida Statutes, or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction.
          5. Impose a sanction on any employee who is so convicted or require the satisfactory participation in a drug abuse assistance or rehabilitation program as such is available in the employee's community.
          6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of applicable laws, rules and regulations.

      As the person authorized to sign the statement, I certify that this firm complies fully with the above requirements."

    • Affidavit of Compliance with Section F.S. 787.06(13) Florida Anti-Human Trafficking Compliance (required)

      Pursuant to section 787.06(13), Fla. Stat., when this contract is executed, renewed, or extended the Contractor and any subcontractors must provide the City with an affidavit, signed by an officer or a representative of the Contractor and any subcontractors under penalty of perjury, attesting that the Contractor and subcontractor does not use coercion of labor or services as those terms are defined in this section.

      Please download the below documents, complete, and upload.

    • Experience Modification Rate (EMR) Documentation

      Experience Modification Rate (EMR) Documentation for the most recent three (3) full years provided on letterhead from current insurance provider.

    • Attach OSHA Documents (required)

      Attach OSHA Documents

    • Subcontractor Information Form (required)

      Please download the below documents, complete, and upload.

      List all subcontractors that will be used for the Work along with the tasks they will provide. If the subcontractor is a small and minority-owned business, women’s business enterprise, or labor surplus firm, check the boxes that apply. The selected prime Contractor will be asked to provide the actual subcontractor spend amount at a later date. Subcontractors are not permitted to work at GRU if listed on the State of Florida Suspended Vendor List or the Federal Suspensions and Debarments

        • Small Business Enterprise (SBE): A business that is independently owned and operated and is qualified as a small business under the Small Business administration criteria and size standards at 13 C.F.R. Part 121.
        • Women’s Business Enterprise (WBE): A business enterprise that is (a) at least 51% owned by one or more women, or in the case of a publicly owned business, at least 51% of the stock is owned by one or more women; and (b) whose management and daily operations are controlled by one or more women. (13 C.F.R. Part 127) 
        • Minority Business Enterprise (MBE): A business that is (a) at least 51% owned by one or more minority group members, or in the case of a publicly owned business, at least 51% of the stock is owned by one or more minority group members; and (b) whose management and daily operations are controlled by one or more minority group members. (13 C.F.R. § 124.103, 13 C.F.R. § 124.102, and 13 C.F.R. § 124.105).
        • Labor Surplus Area (LSA): A locality, defined by the Department of Labor’s Employment and Training Administration, that has a civilian average annual unemployment rate during the previous two calendar years of 20% or more above the average annual civil unemployment rate for all states during that same period. (20. C.F.R. § 654.4-654.5). There is an “Exceptional Circumstance Consideration Provision” that allows a civil jurisdiction to ask for inclusion in the LSA list after it is published, due to events such as COVID-19, natural disasters, and other adverse economic changes.
        • Labor Surplus Area Firm (LSAF): A firm that together with its first-tier subcontractors will perform substantially in LSAs as identified by the Department of Labor in accordance with 20. C.F.R. § 654. Performance is substantially in LSAs if the costs incurred under the contract on account of manufacturing, production, or performance of appropriate services in labor surplus areas exceed 50% of the contract price (40 C.F.R. § 33.103). 
    • Subcontractor Information Form (required)

      Please download the below documents, complete, and upload.

    • Attach Clarifications and/or Exceptions. (required)

      Any deviation from this Solicitation must be provided and explained in detail with the Response. Deviations must be explained on a separate page labeled “Clarifications and Exceptions” and included with the Response. Each clarification and exception must correspond to the specific referenced section in the Solicitation. Otherwise, the Response will be considered in strict compliance with the Solicitation and the selected Respondent will be held accountable for compliance with the Specifications

      Upload your Clarifications and/or Exceptions here.

    • Insurance Requirements

      Please download the below documents for your review.

    • Attach Proposal (required)

      Attach Proposal

    • Attach Pricing (required)

      Attach Pricing

    • Goods only, or Service, Labor or Labor/Material? (required)

      1. Is this Solicitation for Goods only?

      2. Is this Solicitation for a Service, Labor or Labor and Material?

      3. Is this Solicitation for Consulting Services?

    • What capacity will vendor be providing services/labor for GRU? (required)

      For the purpose of Insurance Requirements, please choose one of the following:

      1. Software
      2. Engineering or Consulting Services
      3. Contractor
      4. None of the above (Insurance is not required)
    • Request for Statement of Qualifications (required)

      Is this solicitation a request for statement of qualifications in accordance with CCNA?

    • Non-Mandatory Pre-Bid Meeting (required)

      Is the pre-bid meeting non-mandatory?

    • Non-Mandatory - entrance after meeting begins (required)

      Enter number of minutes below:

      "Representatives arriving to the Pre-Bid/Proposal Meeting more than __ minutes late will not be allowed to participate in the meeting."

    • Mandatory Pre-Bid Meeting (required)

      Is the pre-bid meeting mandatory?

    • Mandatory - entrance after meeting begins (required)

      Enter number of minutes below:

      "Representatives arriving to the Pre-Bid/Proposal Meeting more than __ minutes late will not be allowed to participate in the meeting."

    • Will Vendor be performing duties on GRU Property or in the GRU Territory? (required)

      If answer is "Yes", and this is not for a PSA or Software purchase, click yes.

    • Software (required)

      Is this solicitation software related?

    • Professional Services Agreement (required)

      Is this solicitation for engineering, architectural or consulting services?

    • Is there budget approval for this purchase? (required)

      Do you know what the budget amount is?

    • Approved Budget (required)

      Enter the dollar amount of your approved budget.

    • Network Number or Internal Order (I/O) Number? (required)

      Check applicable item below.

    • Network Number (required)

      Enter the Network Number being used for this purchase.

    • Internal Order (O/I) (required)

      Enter the Internal Order (O/I) Number being used for this purchase.

    • Terms of Award (required)

      Please select from the Terms of Award listed below if known:

    • Experience Modification Rate (EMR) (required)

      Does vendor need to provide EMR?

    • Electronic Pricing Table (required)

      Would you like to have bidders respond to an electronic pricing table through OpenGov?

      Some examples of when to say "yes":

      1. This is a quote for goods or services
      2. This is a bid, with a pricing table that can be uploaded from an Excel spreadsheet
      3. Hourly rate schedules
    • Evaluation (required)

      Will there be an evaluation to review the proposals and score them based on weights and multiple criteria?

    • List your Evaluation Criteria (required)

      List criteria being evaluated (i.e. price, delivery and warranty). 

    • Evaluation Committee (required)

      List 3-5 names of member who will be on the evaluation comittee.

    • Contract (required)

      Is a multi-year contract required?

    • Term of Agreement: Begin Date (required)

      Enter the begin date here (i.e. October 1, 2024)

    • Term of Agreement: Termination Date (required)

      Enter the termination date (i.e. September 30, 2024)

    • Renewals (required)

      How many renewal will this contract have? (i.e. 'Three (3)'; 'Two (2)'; 'Three (3) One Year', etc.)

    • State or Federal Funding (required)

      Will the purchase of goods or services be funded by the State or Federal Government (i.e. Grants, FEMA Reimbursements).

    • Bid Bond (required)

      Will this solicitation require a bid bond?

    • Performance and Payment Bond (required)

      Will a Performance Bond be required for this solicitation?

    • Surety Bond. (required)

      Is a Surety Bond required with bid submittals?

    • Surety Bond $ Amount (required)

      Enter the dollar amount of the surety bond

    • Commercial Blanket Bond. (required)

      Is a Commercial Blanket Bond required with bid submittal?

    • Fidelity Bond (required)

      Is a Fidelity Bond required?

    • Liquidated Damages (required)

      Will Liquidated damages be required?

    • Liquidated Damages dollar amount $ (required)

      Enter dollar amount of Liquidated Damages.   

      For example: "Liquidated damages shall be assessed in the amount of $[XXX,XXX].  [Define when liquidated damages will apply]." 

    • Work Hours (y/n) (required)

      Do work hours apply to this solicitation?

    • Work hours - Days of week/time of day work can be done. (required)

      Enter the days of the week and the hours of the day that work can be done. (i.e. Monday-Friday, 8am-5pm)

    • Delivery Date (required)

      Do you have a required delivery date?

    • Delivery Date (required)

      Provide required delivery date

    • Delivery Location (required)

      Do you have a specific delivery location?

    • Delivery Location (required)

      Enter full delivery address here.

    • Job Site. (required)

      Is there a specific location where work will be done?

    • Job Site Address (required)

      Please provide address for the job site.

    • Construction (required)

      Is this a Construction Project?

    • Will Vendor provide required permits? (required)

      Will Vendor provide required permits?

    • Will GRU provide permits? (required)

      Will GRU provide required permits?

    • Licensing requirements? (required)

      Licensing requirements?

    • Design Build (required)

      Is this a Design Build Project?

    • Choose which indemnification clause applies to this construction project. (required)

      Choose which indemnification clause applies to this construction project.

    • Florida Trench Safety Act. (required)

      Does the Florida Trench Safety Act apply to this solicitation?

       

      The State of Florida incorporates the Occupational Safety and Health Administration’s (OSHA) excavation safety standards, 29 C.F.R.  1926.650 Subpart P, as its standard (Sections 553.60-64, F.S.). The Contractor/Respondent shall list separately in their Proposal the cost of compliance with these standards on a lineal footage basis and the method of compliance. The bidder shall determine if special shoring requirements are needed. Special shoring shall be identified and priced on a square footage basis in the Proposal. The Successful Bidder is fully responsible for the design of the trench safety system and the compliance with the applicable standards for the project.

    • Best and Final Officer (BAFO) (required)

      Will a best and final offer apply to this solicitiation?

    • Contractor, Supplier or Consultant? (required)

      Is the vendor a:

      (Your answer will automatically populate throughout the contract document)

    • CONTRACTOR, SUPPLIER OR CONSULTANT (CAPS) (required)

      Is the vendor a:

      (Your answer will automatically populate throughout the contract document)

    • Contractor Business Entity (required)

      Sunbiz

      https://dos.fl.gov/sunbiz/search/

      Enter the Business Entity Type of the Contractor

    Key dates

    1. June 2, 2026Published
    2. July 2, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.