Active SLED Opportunity · TEXAS · CITY OF SEGUIN
AI Summary
City of Seguin seeks bids for an annual contract to supply pad-mount and pole-mount transformers for its Electric Utilities Department via a competitive sealed bid process. Electronic bids due by April 28, 2026.
It is the intent of the City of Seguin to enter into an annual contract for the su uasagepply of Pad-Mount and Pole-Mount Transformers for use by the City’s Electric Utilities Department. The purpose of these specifications is to describe the minimum requirements of the contract. This contract is intended for routine and continuous usage. **Solicitation Type**: CSB - Competitive Sealed Bid (Formal) **Source ID**: PU.AG.USA.2599609.C16524801 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/17/2026 06:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: ELECTRIC **Solicitation Number**: AF-2026-42 **Reference Number**: 0000418897 **Pricing**: In attached document **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Package | All items related to the bid | Yes | Yes | **Questions and Answers**: - Q1 Arrow Right Question: manufacturer Are products manufactured in China acceptable for this project? Answer: Answered in Addendum 1 04/01/2026 12:41 PM EDT 04/08/2026 12:54 PM EDT - Q2 Arrow Right Question: Drawings Clarification What is the expected timeline for submitting drawings for approval, considering that our manufacturer is not currently on the approved manufacturer list? Answer: Answered in Addendum 1 04/01/2026 12:42 PM EDT 04/08/2026 12:54 PM EDT - Q3 Arrow Right Question: Drawings Clarification Would you require drawings for each transformer type and rating for the approval process? Answer: Answered in Addendum 1 04/01/2026 12:42 PM EDT 04/08/2026 12:54 PM EDT - Q4 Arrow Right Question: Mix and Match or All or Nothing Hello, we wish to bid the 3 phase but not the 1P.. is that acceptable? Answer: Answered in Addendum 1 04/01/2026 01:37 PM EDT 04/08/2026 12:54 PM EDT - Q5 Arrow Right Question: Clarification I just want to double check that the single-phase pads need to be 120/240 4LVB instead of 240/120 3LVB? And for the 3phase that say 120/240 are you wanting 240 delta midtap 120? Answer: Answered in Addendum 1 04/02/2026 11:28 AM EDT 04/08/2026 12:54 PM EDT - Q6 Arrow Right Question: Clarification Needed Can you please advise if the (2) 1000kva 120/208 padmounts are to have a primary (HV) voltage of 7200Delta or the 12470Y/7200? Can you please advise if the 150kva 480Y/277 padmounts are to have a primary (HV) voltage of 7200Delta or the 12470Y/7200? Answer: Answered in Addendum 1 04/06/2026 10:43 AM EDT 04/08/2026 12:54 PM EDT - Q7 Arrow Right Question: Transformer Spec However, we need more information for the single phase pole mount transformers. The spec on p. 35 only covers transformers with 120/240 secondary voltage. We need specs for single phase poles with 240/480v and 277/480v secondaries. Answer: Answered in Addendum 1 04/06/2026 11:30 AM EDT 04/08/2026 12:54 PM EDT - Q8 Arrow Right Question: Missing specs and more Good morning, Please help us with the following requests and questions regarding your transformer bid. Please provide the specs for the following units... 300 KVA 120/240 PAD MOUNT TRANSFORMER, THREE PHASE 500 KVA 120/240 PAD MOUNT TRANSFORMER, THREE PHASE Please confirm whether or not the 75kva below is a single-phase unit, if it's a 3ph unit we will need the specs. 75 KVA 240/480 POLE MOUNT TRANSFORMER, 7,200V THREE PHASE SEGUINS ANSWER: Please provide specs on single phase pole for the secondary voltages of 120/208 and 277/480 or confirm that the specs provided listing 120/240 should be used. SEGUINS ANSWER: 3PH 277/480 spec provided only goes up to 500KV units, please confirm if COS has a different spec for 750KV and above. SEGUINS ANSWER: 5. 3PH 208/120 spec provided only goes up to 500KV units, please confirm if COS has a different spec for 750KV and above. SEGUINS ANSWER: Answer: Answered in Addendum 1 04/06/2026 11:35 AM EDT 04/08/2026 12:54 PM EDT - Q9 Arrow Right Question: Verify Voltages On the transformer list, the items that call out either 7200v or 12470v, are those voltages delta? Also, can you please verify the voltages of the remainder of the single phase pads, most common is 12470GRDY/7200 and 240/120. Answer: Answered in Addendum 1 04/07/2026 10:50 AM EDT 04/08/2026 12:54 PM EDT - Q10 Arrow Right Question: Spec needed for item 3? Good morning, is there a spec available for item three - there is not enough information to determine the exact item needed (neutral, jacket, insulation, etc) Thank you! E1701-00 CABLE, 750KCMIL UNDERGROUND COPPER (CU) 15KV, 3,830 FT/REEL WITH FOOTAGE MARKERS Answer: Answered in Addendum 1 04/08/2026 12:27 PM EDT 04/08/2026 12:54 PM EDT - Q11 Arrow Right Question: Domestic Manufacturer Hi, in the bid its written as manufacturer should be domestic only, which means it has to be USA based manufacturer ONLY. Is that correct? Answer: Answered in Addendum 1 04/08/2026 12:40 PM EDT 04/08/2026 12:54 PM EDT
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.