SLED Opportunity · CONNECTICUT · CITY OF NEW HAVEN
AI Summary
Invitation to bid for renovation of two ball fields at East Shore Park in New Haven, CT, including fence work, turf restoration, infield clay replacement, new dugouts, and site paving.
Renovation of two ball fields at East Shore Park including fence work, turf restoration, infield clay replacement, new dugouts, and site paving.
Please use the See What Changed link to view all the changes made by this addendum.
Request & Substitution Form is attached to this addendum
Please use the See What Changed link to view all the changes made by this addendum.
Please see attachment section.
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| Each Occurrence | $1,000,000 | Y | Y |
| Combined Aggregate | $2,000,000 | Y | Y |
| Products/Completed Operations Aggregate | $2,000,000 | Y | Y |
Wages. Salary rates and the classification of employees shall be as specified in the Solicitation Documents and Contract Documents. The rates of pay set forth in the Solicitation Documents are the minimum that shall be paid during the life of the Contract. Bidders must inform themselves about local labor conditions (e.g. the length of workday and the work week, overtime compensation, health and welfare contributions, labor supply and prospective changes and adjustments of rates).
Livable Wage Rates for FY 25/26
Livable Wage Rates for FY 26/27 : effective 7-01-2026
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| Each Occurrence | $1,000,000 | Y | Y |
| Combined Aggregate | $2,000,000 | Y | Y |
| Products/Completed Operations Aggregate | $2,000,000 | Y | Y |
| Abuse & Molestation | $1,000,000 | Y | Y |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| Combined Single Limit Each accident including endorsements | $1,000,000 | Y | Y |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| Each Occurrence | --$1,000,000 | Y | Y |
| Combined Aggregate | --$1,000,000 | Y | Y |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| Workers' Compensation | Statutory Limits | ||
| EL EACH | $500,000 | --- | Y |
| EL DISEASE | $500,000 | --- | Y |
| EL POLICY | $500,000 | --- | Y |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| --$1,000,000 | -- | -- |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| --$1,000,000 | Y | Y |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| -$1,000,000 | Y | Y |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| $1,000,000 | -- | -- |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| -$100,000 | -- | -- |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| $1,000,000 | Y | Y |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| Each Occurrence | $5,000,000 | Y | Y |
| Minimum Limits (dollar amount indicates required minimum) | Additional Insured (Y indicates required) | Waiver of Subrogation (Y indicates required) | |
| Each Occurrence | $5,000,000 | Y | Y |
When this contract or agreement includes the construction of and/or the addition to a permanent structure or building; including the installation of machinery and/or equipment, the following insurance coverage must be afforded:
Coverage Form: Completed Value, All Risk in an amount equal to 100% of the value upon completion or value of equipment to be installed.
If any policy is written on a “Claims Made” basis, the policy must be continually renewed for a minimum of two years from the completion date of this contract. If the policy is replaced and/or the retroactive date is changed, then the expiring policy must be endorsed to extend the reporting period for claims for the policy in effect during the contract for two) years from the completion date.
Original, completed Certificates of Insurance must be presented to the City of New Haven via Certificial prior to contract issuance. Contractor/Vendor agrees to provide replacement/renewal certificates at least 30 days prior to the expiration date of the policies. Should any of the polices be cancelled, limits reduced, or coverage altered, 30 days written notice must be given to the City.
City of New Haven
200 Orange Street Rm 301
New Haven, CT 06510
The Disclosure and Certification form should be completed through DocuSign prior to exercising the option to notarize online or take the documents to a notary public prior to uploading with your response
The City needs you to get the Disclosure Form notarized. We are offering you a convenient way to do this online through Notary Online (https://notarylive.com) . However, you don't have to use this online service. If you do choose to use it, it will cost you $25 each time you use it for a notarization. You can explore other ways to get your document notarized if you prefer not to pay this fee, click "No".
An online notarization option will be provided for you when responding.
Important: If you don't have the document notarized, your response will be disqualified.
In essence, you must legally verify your identity and the authenticity of your signature on the document.
Important: If you don't have the document notarized, your response will be disqualified.
In essence, you must legally verify your identity and the authenticity of your signature on the document.
.
Please download the below documents, complete, and upload.
Select "Yes" if you are submitting a Digital Bond
Select "No" if you are submitting a Bid Bond utilizing City Bonding Document.
Note: Labor, Material and Performance Bond valued a 100% of the contract amount will be required of awarded vendor.
Please enter your Bid Bond information from Surety2000 below.
Note: Labor, Material and Performance Bond valued a 100% of the contract amount will be required of awarded vendor.
Please download the below documents, complete, and upload. Vendor must use the bid form attached in the submittal section of this solicitation package, no other format accepted.
Statement of Qualifications:
Each solicitation response shall include a Statement of Qualifications in the format provided in this Solicitation upon stationary of the responding entity.
All questions must be answered, and the data given must be clear and comprehensive.The respondent may submit any additional information he/she desires.
This comprehensive financial review is a necessary step for the City of New Haven to ensure the respondent possesses the financial capacity to successfully undertake and complete the proposed project. Your affirmative response confirms your understanding and willingness to comply with these requirements if requested.
Please enter your number here:
Please upload active validation form from Sam.gov here:
By submitting a response to this solicitation, you acknowledge and accept the terms and condition of each individual policy.
Does your company, including all parent companies, subsidiaries, and other affiliated entities, is currently subject to any of the following:
By submitting a response to this solicitation, you acknowledge and accept this requirement as a condition of award.
For Example: "Homeland Security"
Please select the applicable Wages and Salaries o
Livable Wage Rates = when project is City, ARPA funded and under $150,000.00 or HUD funded and under $150,000.00
State Wage Rates = when project is City, ARPA or Grant funded and over $150,000.00. By separate email request Purchasing to obtain state wage rates
Davis Bacon Federal Rates = when project is Federally funded and over $2,000.00. by separate email request Purchasing to obtain Federal wage rates
N/A = when none of the above apply
Note: Project requiring Bid Bond-when setting up project within project builder enter the Project ID by right clicking the Bid Bond question.
The City of New Haven has a set-aside program for Small Business located with New Haven County. This is a program for any non federally funded construction or service related solicitation up to $150,000. SCD shall have first preference. To seek waiver contact Lil Snyder in SCD.
Format: 2 one (1) year
If your project is Construction and over $100,000, a bid bond is required.
Does project specification define what a good faith effort is acceptable for this statement of work.
applies to all city construction contracts that are over one hundred fifty thousand dollars ($150,000.00)
This particular question is to be answered for the company (or their subcontractors) not their employees.
Please enter the specific License or Certification required to be eligible to compete on this solicitation. For example, "CPA - Certified Public Accountant."
Instructions for Project Managers
Based on the information you currently have, attempt to answer this question to the best of your capability. Ultimately, purchasing will review this carefully and edit and update as needed based on your solicitation requirements.
As a standard, all activities for Construction and Service require the following:
Any Professional Services type project (usually Request for Proposals) will require the following:
For Commodity, General Liability is the minimum requirement.
General definitions and parameters of each approach.
Q (Project Schedule): What are the anticipated start and completion dates of the project?
A: It is anticipated the work will begin as soon as a Notice to Proceed can be issued with work progressing continually until completion. Spring 2026 for starting construction depending on the duration of the contract process.
Q (No subject): Good morning, I am looking to get Jaypro Sports equipment listed as an approved equal for the outdoor athletic equipment on this project. Please provide the process and contact information that this spec package can be sent to.
A: Addendum posted with form to complete. Once completed please upload into your account.
Q (No subject): Please provide the length of the backstop windscreen needed. The drawing is not to scale and would like to be as accurate as possible.
A: Length of Softball field windscreen is 250 linear feet. Length of Baseball field windscreen is 200 linear feet. Both dimensions are inclusive of the backstop and dugouts.
Q (No subject): Please clarify item #13 Concete dugout pad- What depth does the pad need to be? what class concrete? what materials and what depth as the sub base?
A: Please see detail RS-01 on Site Details L2 for concrete pad requirements. Sub base shall be 8" depth of processed aggregate.
Q (No subject): Please clarify what depth the reclaiming of asphalt is to be? on pricing matrix you have 3,829 square yards listed, please advise at what depth? please also clarify what depth the new paving is to be ? what depth , how many courses and compaction, what material such as binder or top coat? square yardage says 3800 square yards
A: Reclaiming shall be the full the depth of existing asphalt. New paving to follow the CTDOT Form 819 9.22 Bituminous Concrete Sidewalk of 2" thick installed in a single course. Compaction requirements per CTDOT Form 819 9.22 includes multiple passes of a roller weighing at least 500 pounds.
Q (No subject): Please clarify for infield reconstruction item #19 How many tons of Dura edge classic should we bid for the 4 inches of new infield skin? the math at 4 inches equals 195 tons- Is this correct? Just want to make sure as this is a lump sum line item..
A: A unit price per ton of DuraEdge has been added to the calculation sheet. The lump sum line item for the field improvement shall now exclude the material cost for DuraEdge as that will now be its own unit item.
Q (No subject): Please clarify for turf improvements item 21 and 22 21 Baseball- at 2" of new USGA Spec sand, the math equals 900 tons of new sand 22 Softball- at 2" of new USGA Spec sand, the math equals 550 tons of new sand Just want to make sure this is what you guys want as this is a lump sum line item in pricing matrix..
A: The tonnage of sand per field is correct per the specification.
Q (Fence ): Please clarify the scale on plan L1.
A: L1 Drawings is 1" = 40'
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.