Active SLED Opportunity · CALIFORNIA · ORANGE COUNTY - CALIFORNIA

    Asphalt and Concrete Maintenance Services

    Issued by Orange County - California
    countyIFBOrange County - CaliforniaSol. 275134
    Open · 17d remaining
    DAYS TO CLOSE
    17
    due Jul 10, 2026
    PUBLISHED
    Jun 12, 2026
    Posting date
    JURISDICTION
    Orange County
    county
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    County of Orange seeks bids for asphalt and concrete maintenance services including repairs, patching, and traffic control on public facilities. Projects are limited in size and require specific California contractor licenses. Bids are submitted electronically with local business preferences applied. Key dates: Questions due 2026-06-26, bids due 2026-07-10.

    Opportunity details

    Solicitation No.
    275134
    Type / RFx
    IFB
    Status
    open
    Level
    county
    Published Date
    June 12, 2026
    Due Date
    July 10, 2026
    NAICS Code
    237310AI guide
    Agency
    Orange County - California

    Description

    The County of Orange, OC Community Resources, (hereinafter referred to as County) is requesting competitive bids from qualified vendors (hereinafter referred to as Bidder) for Asphalt and Concrete Maintenance Services. The County has attempted to provide all information available.  It is the responsibility of each Bidder to review, evaluate, and, where necessary, request any clarification prior to submission of a bid.  The awarded Contract, (hereinafter referred to as Contract) will be between the County and awarded Bidder, (hereinafter referred to as Contractor) in accordance with the model contract terms, conditions and scope of work.

    This is a fully electronic solicitation – only electronic bids submitted through the County’s online bidding system will be allowed; no other form of bid submittals will be accepted. Prior to submitting a bid, Bidders are advised to carefully read the instructions below, including the model contract and any solicitation attachments and/or exhibits. For assistance on uploading proposals via County’s eProcurement Portal, please contact procurement-support@opengov.com or https://help.procurement.opengov.com/en/.

    All questions or requests for interpretations must be received within this solicitation's Question & Answer section as specified in the solicitation. Respondents are not to contact other County personnel with any questions or clarifications concerning this solicitation.

    Background

    Brief description of project.

    Project Details

    • Reference ID: 012-2945401-ME-1
    • Department: OC Community Resources
    • Department Head: Dylan Wright (Director)

    Important Dates

    • Questions Due: 2026-06-26T21:00:00.000Z

    Evaluation Criteria

    • Bid Submission

      Before submitting a bid, Bidders shall carefully examine the solicitation contents, including the Contract Terms and Conditions and Scope of Work. Bidders shall include in their bid response a monetary sum to cover the cost of all items included in the Contract.

      Note: Electronic Bids cannot be viewed by County until after the solicitation deadline. If you encounter any problems with your registration, system, bid submission, or other system issues, please contact OpenGov’s support staff via the live chat option or via email at procurement-support@opengov.com.

    • OCLSB:

      Effective January 1, 2020, County of Orange Board of Supervisors adopted the OCLSB Preference policy.  Implementation of the OCLSB Preference policy supports local businesses, the local economy and the development of the County’s tax base.

      To be certified as a Local Small Business by the County of Orange, a business shall meet (1) and (2) below:

      1. Local Business Requirements:
        1. Maintains their principal center of operations (i.e. headquarters) within Orange County, and:
        2. Has:
          1. A business address located in the County of Orange that is not a post office box, or
          2. A valid business license or certificate of occupancy issued by the County of Orange or by an Orange County city, or other documentation acceptable to the County of Orange. 
      2. Small Business Requirements:
        1. Must be certified as a Small Business by the State of California Department of General Services (DGS): and,
      3. Above requirements must be valid at the time of proposal submittal through the time of award of the contract. The terms and conditions of the contract shall additionally require the contractor to remain in compliance with the Local Business requirements (pursuant to subsection (a) above) through the term of the contract, including any extensions or renewals, and shall provide that contractor’s failure to comply may be construed by County as a material breach of the contract.
    • Background

      Brief description of project.

    • BUYER NOTE - add to pricing section in the Description (optional) section.

      BUYER NOTE - add to pricing section in the Description (optional) section.

      Notes:

      Abbreviations:

      (ADD)

      Additive Bid Item

      CF = Cubic Foot

      LS = Lump Sum

      (DED)

      Deductive Bid Item

      CY = Cubic Yard

      MO = Month

      (DEL)

      Deletable Bid Item

      EA = Each

      TON = Tom (2000 lbs.)

      (NA)

      Non-Adjustable Bid Item

      GAL = Gallon

      SF = Square Foot

      (S)

      Specialty Bid Item

      LB = Pound

      SY = Square Yard

      (AL)

      Allowance

      LF = Linear Foot

      T&M = Time & Materials

       

      Allowances

      ALLOWANCE NO. 1:       All Bidders shall include this amount in their Construction Total Cost to be used for County’s contingency – this amount will cover the cost for additional work requested by the County that is outside the scope of work for this project. County will not pay a mark-up for profit and overhead on any Change paid out of the contingency allowance.

       

      ALLOWANCE NO. 2:       All Bidders shall include this amount in their Construction Total Cost to be used for permit fees. Should the actual costs be less than the allowance, Contractor shall not be entitled to refund of unexpended funds. If permit fees exceed deposit amount, Contractor shall be reimbursed (through an executed change order) for all costs other than Contractor caused re-inspection fees.

    • Scope of Work
      1. DESCRIPTION OF WORK

       

      1. The work to be done consists, in general, of minor asphalt and concrete maintenance and replacement on public trails, paths, driveways and parking lots located on County-owned or maintained facilities, some of which may be located on District land. The scope of this contract excludes County properties designated a county highway as defined in Streets and Highways Code, unless otherwise approved by OC Parks Project Manager and OC Public Works. Maintenance requests will consist of removal and replacement of isolated areas of deteriorated pavement, filling potholes, patching low spots, paving, grinding and overlay, slurry coating, crack sealing, fog sealing, curb installation, and striping throughout Orange County. All work set forth in scope shall not exceed 4,000 square feet in total per project. All work to be done in accordance with current County of Orange Standard Plans where applicable, available online using the following link:

      https://ocpublicworks.com/ocpw/oc-public-works-standard-plans

      1. Other items of work or details not mentioned above that are required by OC Public Works Standard Plans, http://www.ocpublicworks.com/about/oc_public_works_standard_plans (hereinafter, “Plans”); the “Greenbook” – Standard Specifications for Public Works Construction (hereinafter “Standard Specifications”), or this Scope of Work, shall be performed, placed, constructed, or installed.
      1. Contractor License Requirements:

      Current California licenses required to perform work within stated scope include Class-12 Earthwork and Paving Contractor and Class-8 Concrete Contractor.  

      1. Scope of Work Limitations: This Contract shall only be utilized for maintenance work as defined in California Public Contract Code (PCC) 22002(d) and public projects of seventy-five thousand dollars ($75,000) or less as a negotiated contract or purchase order in accordance with PCC 22032(a). where the answer to all of the following statements is "No". If the answer to any statement is "Yes" or "Unknown," this Contract shall not apply, and the project must be treated as a Public Works Project to be separately managed or procured by OC Public Works.

      Contract Work is EXCLUDED if the project:

        1. Requires a permit (encroachment, regulatory, Building, etc.), or if the nature of the work is complex enough that an OCPW Project Manager is needed to determine if a permit is required.
        2. Requires construction, building, grading, or fire plans.
        3. Is being performed correcting a building code violation.
        4. Is being performed in order to comply with the Americans with Disabilities Act of 1990 or ADA (42 U.S.C. § 12101).
        5. Requires the installation of new or replacement of existing plumbing, electrical, or mechanical equipment.
        6. Requires painting in excess of 500 sq ft in a contiguous location or 2,000 sq ft in a building.
        7. Requires the erection of a new structure, structural modification of an existing structure (including demolition), or any sort of structural assessment.
        8. Requires resurfacing one inch or more (vertically) of pavement on a street or highway (where a street or highway is not a parking lot, bikeway, or walking path).
        9. Requires the construction of a retaining wall taller than 4 feet measured from the bottom of the footing to the top of the wall or supporting a surcharge load (CBC 105.2).
        10. Requires design and implementation of new landscape or irrigation features.
        11. Requires more than concrete or asphalt maintenance, replacement, or repairs more than 4,000 sq ft.
        12. Requires grading more than 500 sq ft of land.
        13. Requires roof repair, modification, or replacement to a roof other than patching.
        14. Involves new permanent fencing vertically higher than 4 feet, or linearly longer than 6 feet being installed.
        15. Could potentially impact a drainage pattern or water runoff, ditch, creek, or channel.
        16. Could potentially trigger the National Pollutant Discharge Elimination System – Water Quality measures
        17. Requires general plan conformity
        18. Triggers the California Environmental Quality Act evaluation
        19. Involves something being mounted to a wall that is greater than 20 lbs.
        20. Could compromise the stability of the underlying soil, impact the quality of surface water or groundwater, or is complex enough that an evaluation by OCPW is needed to determine this.

      This Contract is strictly limited to routine Asphalt and Concrete Maintenance and Repair activities that do not trigger any of the conditions described above. This Contract shall also be limited to projects with a cost of seventy-five thousand dollars ($75,000) or less, pursuant to the provisions of California Public Contracts Code section 22032.

      1. IDENTIFICATION AND SCHEDULING OF WORK
      1. County conducts recurring inspections of all County maintained roads and investigates citizen complaints of potholes and road damage. Inspector designates the limits of damaged areas with paint, documents the damage with Digital photos, a short summary of damage and required maintenance using a Work Order form. This report includes the specific location and Thomas Guide reference.
      1. County staff reviews, prioritizes, and "packages" these reports to include several locations in the same general geographic area. Work packages, including photos, will be prepared for the Contractor biweekly. A biweekly work package may include any of the work items in the Contract.
      1. Contractor will furnish a work plan indicating the day/date for work on each location in the biweekly work package. The County reserves the right to insert additional locations into a biweekly work package at any time. When this occurs, Contractor may request Inspector to delete one or more other work locations from that biweekly work package if the total work package, including additional work, cannot be completed during designated completion period. Inspector will respond to Contractor requests for deletion of work by close of business the next workday.
      1. Contractor shall send to a County inspector or County representative a daily worksheet anytime work is being performed for the County of Orange indicating job location/s, how many crew members with foreman name, equipment, tonnage of asphalt, how many loads in and out of job site. This should be done for each work order.
      1. WORK COMPLETION SCHEDULE
      1. Inspector or County Representative will review all work schedules before issuing Notice to Proceed (NTP). All work in each work package is to be completed within the agreed upon time designated for that work package in the NTP. Contractor is responsible for notifying Inspector or County Representative if weather or other conditions preclude working on some or the entire work package. Such notification will be made within four hours of the event/occurrence.
      1. Inspector or County Representative and Contractor are required to discuss the impact of weather or other agreed to delays in an attempt to identify these locations in the work package that cannot be completed on schedule. Inspector will normally include deleted items in the next biweekly work package.
      1. Failure to complete the work package by the described date without Inspector’s or County Representative’s approved extension will result in a deduction of two hundred and fifty dollars ($250.00) per day late penalty fee for each uncompleted location.
      1. CONDUCT
      1. Contractor personnel providing services under this Contract shall not be incompetent, disorderly, under the influence of alcohol or drugs, who fails or otherwise refuses to perform the work properly and acceptably or is otherwise objectionable. County expressly retains the right to request any specific Contract personnel be precluded from providing services to County under this Contract. County is not required to provide any reason for requested removal of specified Contract personnel. Contractor shall effectuate removal of the requested Contractor personnel within three (3) calendar days.
      1. SUPERVISION
      1. Contractor shall provide a supervisor or foreman who shall be present at all times during Contract operations, and who shall be responsible for both conduct and workmanship. Said supervisor or foreman shall be able to communicate effectively in both written and oral English.
      1. Full compensation for conforming to requirements of “Supervision” will be considered as included in the various items of work involved and no additional compensation will be allowed.
      1. REPORTING COMPLETED WORK 
      1. Each completed package must have Contractor’s name, date of completion and name and signature of Contractor's representative certifying completion of work. Completed work requests will be delivered to the Inspector or County Representative in a timely manner, preferably within 24 business hours.
      1. ACCEPTANCE OF WORK
      1. Each work location reported as complete will be accepted by Inspector or County Representative for payment unless Contractor is notified otherwise within 24 business hours following contractors report of completion.
      1. WARRANTY OF WORK
      1. Contractor warrants all work to be free from defects of design material and workmanship, for a period of one (1) year from the date of acceptance of work. Expressly included is the warranty of compaction of existing base material or sub-grade and asphalt concrete or concrete placed under this Contract and that traffic will not result in a depression of the patch or repaved area greater than 1/4" below the surrounding pavement. Contractor, promptly after receipt of notice shall make good, at his expense, all defects developing during this period, including labor and material.
      1. UNSCHEDULED/AS-NEEDED WORK 
      1. Contractor will be required to provide unscheduled/as-needed services, 24 hours per day, seven days a week, to potholes, sinkholes, and other unscheduled/as-needed maintenance as required. Contractor will be given specific locations to fix via telephone call and/or email from a County authorized representative. Contractor shall be compensated for responding to the emergency call and for the quantity of the work done. Contractor will be required to start the work indicated within two (2) hours of the initial telephone call/email and report back to County Representative upon completion of work specified.
      2. Contractor shall provide a 24-hour contact information, including phone numbers, email addresses, and the names of at least two individuals, within one week of award of Contract. Should the phone number or contact person change during the course of the Contract those changes must be provided to County.
      3. Contractor will be required to provide all traffic control required during emergency operations.
      1. COOPERATION
      1. The Contractor, if applicable, shall cooperate with all private property owners affected by the implementation of the work package, notifying them at least 24 hours before commencement of any work on/or adjacent to their property to the satisfaction of County Inspection personnel. The Contractor shall cooperate with utility companies doing on-going work and allow them sufficient time to finish their work.
      2. Full compensation for conforming to the requirements of “Cooperation” shall be considered as included in the various items of work involved and no additional compensation will be allowed.
      1. SOUND CONTROL 
      1. Contractor will comply with all County and local sound control and noise level rules, regulations, and ordinance, which apply to any work performed pursuant to the Contract and will make every effort to control any undue noise resulting from its operation.
      2. Full compensation for conforming to requirements of “Sound Control” will be considered as included in the various items of work involved and no additional compensation will be allowed.
      1. DUST CONTROL 
      1. No separate payment will be made for any work performed or material used to control dust resulting from the Contractor's performance of the work, or by public traffic, either inside or outside the right-of-way.
      2. Contractor will perform operations in a manner that minimizes dust. Contractor will not create dust in such a quantity as to violate the South Coast Air Quality Management District’s regulations.
      3. Full compensation for conforming to requirements of “Dust Control” will be considered as included in the various items of work involved and no additional compensation will be allowed.
      1. DEBRIS REMOVAL 
      1. All trash and debris shall be removed from work area by the end of each working day. At other times during the progress of work, when required, Contractor shall remove all surplus materials, rubbish, and debris resulting from the work. Work area will be left in a neat, clean, and acceptable condition as approved by Inspector or County Representative. No stockpile of debris will be allowed at the site unless authorized by Inspector or County Representative.
      1. Contractor will pick up and dispose of materials at a site outside of County right-of-way approved for disposal of such materials. Any debris dropped on the public street during entrance or exit of the site will be removed immediately by Contractor.
      2. Full compensation for conforming to requirements of “Debris Removal” will be considered as included in the various items of work involved and no additional compensation will be allowed.
      1. WATER 
      1. Contractor will furnish all water required for performance of this work, will make all arrangements for obtaining all water with the governing water district, and will comply with all requirements set forth by the governing water district.
      2. Full compensation for conforming to requirements of “Water” will be considered as included in the various items of work involved and no additional compensation will be allowed.
      1. PARKING CONTROL
      1. Parked cars may interfere with the work to be performed. Therefore, if applicable, Contractor is required to post, maintain, and subsequently remove, temporary "Tow Away No Parking" signs along streets utilized for trail maintenance where work is to be performed with no less than 24 hours prior to the start of said work. Contractor will furnish signs per sample provided by County. Contractor will fill in day and date for scheduled work. Contractor will be responsible for replacing any signs which are damaged or removed in order to maintain notice to the public. Contractor will be responsible for the removal of all temporary "Tow Away No Parking" signs upon completion of the work in posted area.
      2. Full compensation for conforming to requirements of “Parking Control” will be considered as included in the various items of work involved and no additional compensation will be allowed.
      1. TRAFFIC CONTROL 
      1. Contractor will conduct its operations in a manner consistent with the Manual on Uniform Traffic Control Devices (“MUTCD”) Guidelines as published by the State of California, Department of Transportation and/or the County WATCH Manual for Work Area Traffic Control which also follows the CA-MUTCD. Project operations will seek to minimize trail traffic congestion during A.M. and P.M. peak-hour traffic. This may require beginning work after the A.M. peak-hour traffic and ending work before the P.M. peak-hour traffic.
      2. Night work will be permitted only by direction of County Inspector or County Representative.
      3. Contractor will maintain access to schools and commercial areas at all times during project operation.
      4. If a County owned or managed trail, path, or parking lot needs to be closed anytime during maintenance the contractor shall notify the public with advisor notices in the immediate and surrounding work area. Notices shall be in the form of a laminated public notice on standard a-frame sign placard stating the activities that will affect access and operations and the times and dates for scheduled work at least 48 hours before the start of work.
      5. Contractor shall be responsible for adequate barricading of work area and controlling traffic in the vicinity of the work area.
      6. Spillage resulting from hauling operations along or across any public traveled way will be removed immediately by the Contractor, at their expense. When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether empty or loaded, will in all cases yield to public traffic.
      7. Special emphasis will be placed on the use of “Construction Zone Ahead” (C18R) signs at the beginning, end, and all access and/or intersecting streets with trails and paths under maintenance. Contractor will provide and maintain all signs, barricades, pedestals, flashers, delineators, and other necessary facilities for the protection of the motoring public within the limits of the maintenance area and all its approaches, including advanced signing and barricades.
      8. Flashing arrow signs, of the appropriate type per MUTCD, will be provided for all lane Closures, if applicable.
      9. Portable delineators, either conical (traffic cone) or tubular shaped plastic devices, with a minimum height of 28 inches will be used for delineation of the travel way.
      10. If the traffic cones or portable delineators are damaged, displaced, or unacceptable for any reason by Inspector or County Representative or are not in an upright position from any cause, said cones or portable delineators will immediately be replaced or restored to their original location, in an upright position, by Contractor.
      11. Contractor will maintain 6’ for trail traffic at all times unless provided with engineered detour plan.
      12. Contractor will furnish such flagmen as are necessary to give adequate warning to traffic or to the public of any dangerous conditions to be encountered. Flagmen, while on duty and assigned to give warning to the public that the trail is under maintenance and of any dangerous conditions to be encountered as a result thereof, will perform their duties and will be provided with the necessary equipment in accordance with the current "Instructions to Flaggers", by the State of California, Department of Transportation. The equipment will be furnished and kept clean and in good condition by the Contractor, at its expense.
      13. Should Contractor appear to be neglectful or negligent in furnishing warning and protective measures as provided; Inspector or County Representative may direct attention to the existence of a hazard and request necessary warning and protective measures to be furnished and installed by Contractor, at their expense. Should Inspector or County Representative point out the inadequacy of warning and protective measures, such action on the part of Inspector or County Representative will not relieve Contractor from responsibility for public safety or abrogate its obligation to furnish and pay for such devices.
      14. Contractor will maintain safe working conditions at each work location. At the end of each day, all equipment and other obstructions will be removed from the trail, path, or parking lot. The contractor shall place temporary traffic markings (tabs) when any traffic markings are removed.
      15. Full compensation for conforming to requirements of “Traffic Control” will be considered as included in the various items of work involved and no additional compensation will be allowed.
      16. If the Contractor is required to submit Traffic Control Plan prepared and stamped by a Registered Civil or Traffic Inspector, the Contractor shall be reimbursed for the actual cost of the preparation and implementation of the plan without mark-up or profit margin.                       
      1. PROTECTION AND RESTORATION OF EXISTING AREAS
      1. Contractor will protect all furnishings, improvements, and existing trail and path tread outside and leading to or from work project locations from damage by its operations. All damage will be restored or replaced, at the option of County, at Contractor’s expense within three business days after notification of such damage by Inspector or County Representative. Restorations and/or replacements will be equal to or better than original in all aspects.
      1. SAFETY
      1. Contractor agrees to perform all work outlined in this Contract in such a manner as to meet all accepted standards for safe practices during operations and to maintain safe conditions or premises and ways at all times, including safely stored equipment, machines, and materials. This includes compliance with local County, State or other legal intents and terms of the applicable OSHA and CAL/OSHA Safety orders at all times so as to protect all persons, including Contractor's employees and Agency against injury or damage to their property.
      1. BEST MAINTENANCE PRACTICES (BMP) 
      1. The Santa Ana and San Diego Regional Water Quality Control Boards (RWQCB) have issued permits which govern storm water and non-storm water discharges resulting from areas owned and operated by the County of Orange, Orange County Flood Control District and incorporated cities of Orange County (collectively referred to as Permittees).RWQCB Permits are National Pollutant Discharge Elimination System (NPDES) Permits No. R8-2002-0001 and R8-2009-0030, respectively. Copies of the RWQCB Permits are available for review.
      2. In order to comply with the Permit requirements, the Permittees have developed a Drainage Area Management Plan (DAMP) which contains Model Maintenance Procedures with Best Management Practices (BMPs) that parties conducting the municipal activities must adhere to. These Model Maintenance Procedures apply to any party conducting municipal activities and contain pollution prevention and source control techniques to minimize the impact of those activities upon dry weather urban runoff, storm water runoff and receiving water quality.
      3. Work performed under this Contract will conform to the Permit requirements, the DAMP, and the Model Maintenance Procedures. Contractor will fully understand the Model Maintenance Procedures applicable to activities that are being conducted under this Contract prior to conducting them and maintain copies of the Model Maintenance Procedures throughout Contract duration.
      4. Work shall be performed in conformance with BMP; see relevant fact sheets, including but not limited to “Parking Lot Maintenance” (FF-9) and “Roads, Streets and Highways Operation and Maintenance” (FP-3), which can be downloaded at: www.ocwatersheds.com/documents/bmp/municipalactivities.
      5. Evaluation of activities subject to DAMP requirements performed under this Contract will be conducted to verify compliance with DAMP requirements and may be required through Contractor self-evaluation as determined by County.
      1. DEWATERING
      1. Any groundwater that may be encountered shall be controlled and removed by methods of the Contractor's choice subject to the requirements of the California Regional Water Quality Control Board Individual Dewatering Permit, Section 401 Permit, and Flow and Acceptance of Water.
      2. The dewatering system chosen shall relieve seepage pressure and keep the subgrade free from water. Regardless of the dewatering method chosen by the Contractor, the subgrade elevations shall be maintained. If the material at subgrade is unstable due to high moisture content, the Contractor shall remove the material and place fill at 90% Relative Compaction to re-establish the subgrade at no cost to the County. The Contractor may provide other methods of stabilization at subgrade at no cost to the County.
      3. The Contractor shall control the water level below the subgrade to prevent pumping of gravel base material.
      4. No discharge water quality problems are anticipated other than de-silting prior to discharging into the downstream portion of the channel. The cost of de-silting the discharge shall be included in the Contract price for dewatering.
      5. A de-silting basin will be required in at least one location to conform to the provisions of CRWQCB dewatering permit.
      6. Full compensation for conforming to the requirements of “Dewatering” shall be included in the various items of work involved and no additional compensation will be allowed.
      1. UTILITIES
      1. The County has endeavored to locate and show on the plans the approximate locations of all private and public utilities and facilities to be encountered during construction. However, it is possible that, during the work, unknown substructures requiring relocation or protection may be encountered. Such unknown substructures will generally fall into two classes:

      Class I - Those requiring relocation or protection at the expense of the owner; and

      Class II - Those requiring relocation or protection at the expense of the County.

      1. For Class I utilities, the Contractor shall provide time and working space for protection or relocation activities and may be entitled to an extension of time for completion and/or extra compensation under the provisions of Subsection 5-5, "Delays."
      1. For Class II utilities, the County will make arrangements for the protection or relocation by the Owner or by the Contractor or by others. In the event either the protection or the relocation is to be accomplished by the Contractor, the procedures of Section 3, "Changes in Work," of the Standard Specifications shall be used. In the event protection or relocation is accomplished by the owner or by others, the Contractor shall provide time and working space and may be entitled to an extension of time for completion and/or extra compensation under the provisions of said Section 5-5, "Delays."
      1. In the event any such unknown substructures should be disturbed or damaged, by no fault of the Contractor exercising reasonable care, the Contractor shall at once make necessary emergency preservations at no cost to the Contractor. Permanent preservations, if necessary, and/or relocation will be arranged by the County at no cost to the Contractor.
      1. Where facilities are shown on the plans, "To Be Relocated by Others," the County will issue the owner a "Notice to Relocate" or, by County agreement with owner, require owner to relocate. In the event difficulties delay relocation, which in the judgment of the Inspector or County Representative cannot reasonably be foreseen, and require a delay in Contractor's completion date after all reasonable remedies for keeping Contract on schedule have been exhausted by Contractor including, but not limited to flow-charts and critical path scheduling, work simplification, and alternative construction methods, Inspector or County Representative may allow extra compensation and extra time to the Contractor.
      1. The Contractor shall protect facilities shown on the plans, "To Be Relocated by Others," in both original and relocated positions and any damage to such facilities shall be immediately fixed to the owner's satisfaction at no cost to the County.
      1. The Contractor's attention is directed to the utility notification service provided by Underground Service Alert (USA). USA member utilities will provide the Contractor with the locations of their substructures in the construction area when the Contractor gives at least two working days’ notice to the Underground Service Alert by calling 1- 800-422-4133. The Contractor shall call USA prior to any work over substructures to allow owners to locate and/or obtain accurate "ties" on their manholes, valve covers, meter boxes, etc.
      1. Full compensation for conforming to the requirements of “Utilities” shall be considered as included in the various items of work involved and no additional compensation will be allowed.
      1. VERIFICATION OF UTILITY LOCATION AND DEPTH
      1. Prior to the commencement of work, the Contractor shall verify the location and depth of all utilities, including service laterals and service connections, which have been indicated on the plans or marked by the respective owners and which may affect or be affected by its operations.
      2. All utilities designated on the plans to be protected in place shall be carefully uncovered if located within the lines of excavation and time shall be allowed for the Inspector or County Representative to field check the location of such utilities to make certain that they will not interfere with maintenance. In the event a utility conflict exists, the County will either arrange for utility owner to relocate the utility or adjust grade and/or alignment of the proposed improvement. In the event any such facility should be disturbed or damaged, the Contractor shall at once make restorations to the satisfaction of the owner, or arrange with the owner to make restorations, at no cost to the County. Any delays or reconstruction of maintenance resulting from the Contractor's failure to verify utility locations and depths shall be made at the Contractor's expense.
      3. Full compensation for “Verification of Utility Location and Depth” shall be considered as included in the various contract items of work involved and no additional compensation will be allowed.
      1. EXISTING FACILITIES 
      1. This work shall consist of removing, relocating, or protecting existing facilities which interfere with maintenance. Removed facilities shall be disposed of, salvaged, relocated as specified in this Scope of Work, as shown on the Plans, or as directed by the Inspector or County Representative.
      2. Trenches, holes, depressions, and pits caused by the removal of all facilities shall be backfilled with embankment material as provided in Section 300, "Earthwork", of the Standard Specifications. Such trenches, holes, depressions, and pits that are in surfaced areas, otherwise, to remain undisturbed, shall be backfilled with materials equal to or better in quality and to the same thickness as the surrounding materials.
      3. Material, shown on the plans or designated in this Scope of Work, which is to be salvaged or used in the maintenance work and which has been damaged or destroyed as a result of the Contractor's operations, shall be fixed, or replaced by the Contractor, at their expense.
      1. HAND PATCH ASPHALT CONCRETE PAVEMENT 
      1. The quantity and approximate size of 'Hand Patch Asphalt Concrete Pavement' areas will vary by location but will not exceed a total of 4,000 square feet per work order at any given site.
      2. Inspector or County Representative will designate and mark the hand patch limits when preparing work request.
      3. Prior to placing the asphalt concrete, the area will be thoroughly cleaned by removing all loose and damaged material, moisture, dirt, and other foreign matter.
      4. Prior to placement of asphalt concrete, a tack coat of SS-1h emulsified asphalt will be uniformly applied to all contact surfaces at a rate of 0.05 gallon per square yard.
      5. All materials replaced will be left with a clean and finished appearance and will have smooth transitions to and from existing asphalt tie ins.
      6. Asphalt concrete used to hand patch the existing pavement will be AR-4000 and will conform to the provisions of OCPW Standard Plan 1805 and this Scope of Work.
      7. Specifically for Bike Trail Paving, the amount of asphalt binder used in the asphalt concrete shall be INCREASED by no less than 1% by mass of the aggregate over the amount of that used in roadway paving.
      8. Asphalt concrete will not be placed when the atmospheric temperature is below 50 degrees Fahrenheit or during unsuitable weather.
      9. Contractor will notify Inspector or County Representative via phone and/or e-mail at the end of the working day when striping and/or stenciling are damaged as a result of asphalt concrete maintenance.
      10. Full compensation for conforming to the requirements of “Hand Patch Asphalt Concrete Pavement” including:
      1. Cleaning and preparing the surface area to be patched;
      2. Applying the tack coat to the surface;
      3. Placement and compaction of asphalt concrete pavement;
      4. Furnishing all labor, materials including asphalt concrete, tools, equipment, and incidentals necessary to perform the work will be considered as included in Contract unit price per “Square Foot” in accordance with this Scope of Work and no additional compensation will be allowed.
      1. REMOVE AND REPLACE ASPHALT CONCRETE PAVEMENT

      The quantity and approximate size of “Remove and Replace Asphalt Concrete Pavement” areas will vary by location but will not exceed a total of 4,000 square feet per work order at any given site.

      1. Inspector or County Representative will designate and mark the remove and replace asphalt concrete pavement limits when preparing work request.
      1. Spalled or loose blocks of pavement and pavement cracks wider than 3/8” may be deemed justification for extending or adding new areas to the “Remove and Replace Asphalt Concrete Pavement”. Contractor must notify the Inspector or County Representative when the limits marked on the pavement appear incorrect. Inspector or County Representative will notify Contractor of the decision within four hours of notification.
      1. Areas indicated for “Remove and Replace Asphalt Concrete Pavement” will be saw cut and excavated to the full depth of the existing asphalt concrete, to include aggregate base and/or native soil. Additional aggregate base and/or native soil will be removed to permit correction of a subsurface problem.
      1. Asphalt pavement will be removed to clean straight lines before replacement to ensure that all areas are accessible to equipment used to compact replacement materials. Subgrade will be compacted to a relative compaction of not less than ninety-five (95) percent.
      1. All materials replaced will be left with a clean and finished appearance and will have smooth transitions to and from existing asphalt tie.
      1. Prior to placement of asphalt concrete, a tack coat of SS-1h emulsified asphalt will be uniformly applied to all contact surfaces at a rate of 0.05 gallon per square yard.
      1. Asphalt concrete used for replacement of existing pavement will be AR-4000 and will conform to the provisions of OCPW Standard Plan 1805 and this Scope of Work. Specifically for Bike Trail Paving, the amount of asphalt binder used in the asphalt concrete shall be INCREASED by no less than 1% by mass of the aggregate over the amount of that used in roadway paving. Replacement will be made full depth with asphalt concrete. Depth of 4” or more requires two lifts.
      1. Asphalt concrete will not be placed when the atmospheric temperature is below 50 degrees Fahrenheit or during unsuitable.
      1. Asphalt concrete will not be placed when the Rain is forecasted for the day of the maintenance or during any unsuitable weather.
      1. Contractor shall place temporary traffic markings (tabs) when any traffic markings are removed Contractor shall supply the necessary equipment or material to eliminate/ minimize asphalt tracking from job site.
      1. Contractor will notify Inspector or County Representative at the end of the working day when striping and/or stenciling are damaged as a result of asphalt concrete maintenance.
      1. Full compensation for conforming to requirements of “Remove and Replace Asphalt Concrete Pavement” including:
      1. Saw cutting;
      2. Removal and disposal of pavement, base material, and/or native soil;
      3. Compaction of sub-grade;
      4. Placement of tack coat;
      5. Placement and compaction of asphalt concrete pavement;
      6. Furnishing all labor, materials including asphalt concrete, tools, equipment, and incidentals necessary to perform the work will be considered as included in Contract unit price per “Square Foot” in accordance with this Scope of Work and no additional compensation will be allowed. There are 27 pay items for this Section: price per “Square Foot” for 4” to 30”, for areas less than 100 S.F. or area greater than 100 S.F.

       

      1. REPLACEMENT ONLY ASPHALT CONCRETE PAVEMENT

      The quantity and approximate size of 'Replacement of Asphalt Concrete Pavement' areas will vary by location but will not exceed a total of 4,000 square feet per work order at any given site.

      1. Inspector or County Representative will designate and mark the remove and replace asphalt concrete pavement limits when preparing work requests.
      1. Areas will have asphalt removed prior to placement of asphalt; Contractor will need to Replace Asphalt Concrete Pavement only. Contractor must notify the Inspector or County Representative when the limits marked on the pavement appear incorrect. Inspector or County Representative will notify the Contractor of the decision within four hours of notification. In some cases, coordination with County Inspectors or County Representatives will be needed to remove Steel plates from the trail, bikeway, or parking lot. Contractor may be required to remove steel plates and place them to a safe area within the project area.
      1. Areas indicated for “Replacement of Asphalt Concrete Pavement” will require the full depth of the existing asphalt concrete, a minimum of 2” to a maximum of 10”. In most cases, aggregate base and/or native soil will be replaced by County staff.
      1. Subgrade will be compacted to a relative compaction of not less than ninety-five (95) percent.
      1. All materials replaced will be left with a clean and finished appearance and will have smooth transitions to and from existing asphalt tie ins.
      1. Prior to placement of asphalt concrete, a tack coat of SS-1h emulsified asphalt will be uniformly applied to all contact surfaces at a rate of 0.05 gallon per square yard.
      1. Asphalt concrete used for replacement of existing pavement will be AR-4000 and will conform to the provisions of OCPW Standard Plan 1805 and this Scope of Work. The replacement will be made full depth with asphalt concrete. Depth of 4” or more requires two lifts. Specifically for Bike Trail Paving, the amount of asphalt binder used in the asphalt concrete shall be increased by no less than 1% by mass of the aggregate over the amount of that used in roadway paving.
      1. Asphalt concrete will not be placed when the atmospheric temperature is below 50 degrees Fahrenheit or during unsuitable.
      1. Asphalt concrete will not be placed when rain is forecasted for the day of maintenance or during any unsuitable weather conditions.
      1. Contractor shall place temporary traffic markings (tabs) when any traffic markings are removed.
      2. Contractor shall supply the necessary equipment or material to eliminate/ minimize asphalt tracking from job site.
      1. Contractor will notify Inspector or County Representative at the end of the working day when striping and/or stenciling are damaged as a result of asphalt concrete maintenance. When asphalt replacement is not being done on the same day, the contractor shall place temporary traffic markings (tabs) when any traffic markings are removed.
      1. Full compensation for conforming to requirements of “Replacement of Asphalt Concrete Pavement” including:

      1. Removal and disposal of the base material, and/or native soil;

      2. Compaction of sub-grade;

      3. Placement of tack coat;

      4. Placement and compaction of asphalt concrete pavement;

      5. Furnishing all labor, materials including asphalt concrete, tools, equipment, and incidentals necessary to perform the work will be considered as included in Contract unit price per “Square Foot” in accordance with this Scope of Work and no additional compensation will be allowed. There are 13 pay items for this Section: price per “Square Foot” for 2” to 14”, for areas less than 100 S.F. or area greater than 100 S.F

      1. TYPE D1 ASPHALT CONCRETE CURB
      1. County may request replacement of either 6” or 8” high asphaltic concrete curb conforming to the requirements of “Type D1 Curb” per OCPW Standard Plan 120-2.
      1. Inspector or County Representative will designate and mark location and limits for the curb and specify size as either 6” or 8” curb face.
      1. Prior to placing asphalt concrete on existing pavement, the area will be thoroughly cleaned by removing all dirt, moisture, and other foreign matter, including washing as necessary, and will install a uniformly applied tack coat of SS-1h emulsified asphalt to all contact surfaces of the existing pavement at a rate of 0.05 gallon per square yard.
      1. Asphalt concrete for curbs will be AR-4000 or AR-8000 and will conform to the provisions of OCPW Standard Plan 1805 (see “Notes, Special Provisions and Miscellaneous Details”).
      1. Full compensation for conforming to requirements of “Type D1-Asphalt Concrete Curb” including:
      1. Removing existing asphaltic concrete curb (if necessary).
      2. Cleaning and preparing the surface location of the new curb.
      3. Applying the tack coat to the surface.
      4. Placement and compaction of asphalt concrete material using a machine specifically manufactured for asphalt concrete curb construction.
      5. Furnishing all labor, material including asphalt concrete, tools, equipment, and incidentals necessary to perform the work will be considered in Contract unit price per “Linear Foot” in accordance with this Scope of Work and no additional compensation will be allowed. There are two pay items for this Section, price per Foot for 6” high curb and for 8” high curb.

       

      1. FOG SEAL

      The quantity and approximate size of “Fog Seal” areas will vary by location but will not exceed a total of 4,000 square feet per work order at any given site.

      1. Inspector or County Representative will designate and mark exact limits of each area to be fog sealed.
      1. Fog seal will be SS-1h type emulsified asphalt and uniformly applied at a rate of 0.05 gallons per square yard to all exposed surfaces of existing asphalt concrete (such as berms, v-ditches, sidewalks, trail, bikeway, or parking lot approaches, etc.). All loose materials and vegetation will be removed prior to spraying.
      1. Fog seal will not be applied when atmospheric temperature is below 40 degrees Fahrenheit or when humidity is greater than 70 percent.
      1. Full compensation for conforming to requirements of “Fog Seal” including:
      1. Removing all loose materials and vegetation.
      2. Cleaning and preparing the surface location.
      3. Applying fog seal to the surface.
      4. Furnishing all labor, materials including fog seal, tools, equipment, and incidentals necessary   to perform the work will be considered as included in Contract unit price per “Square Foot” in accordance with this Scope of Work and no additional compensation will be allowed.

       

      1. CRACK SEALANT MATERIAL
      1. Unless otherwise specified, asphalt rubber sealant material will be hot applied, elastically modified asphalt, and will meet the following requirements:

      1. Asphalt rubber sealant material will be accompanied by a certificate of compliance from the manufacturer.
      1. This item to be used only in conjunction with crack seal routed or crack seal
      1. County reserves the right to furnish, at County expense, a different sealant material for particular applications.
      1. CRACK SEAL – ROUTED
      1. Quantity of “Crack -Routed” will vary from each project. Inspector or County Representative will supply estimated quantity only.
      1. Sealant will not be placed when pavement temperature is below 40 degrees Fahrenheit or during unsuitable weather.
      1. Cracks in size from 1/8” and greater in width will be widened using a router to form a sealant reservoir which is at least 1/2" wide and 3/4" to 1” deep. The routed crack will then be cleaned with compressed air to remove all dust and free moisture immediately prior to filling.
      1. Contractor will protect all existing utility covers and pull boxes during routing operation and will fix or replace any damaged facilities to its original condition. Existing facilities will include but not be limited to the above items.
      1. All debris resulting from crack routing will be removed from the roadway by hand or mechanical sweeping prior to the end of each workday.
      1. Sealant will be placed to ensure the bottom of the crack is filled first with sealant continuing to the pavement surface in a manner that does not result in sealant bridging or entrapping air pockets. With deep cracks, settlement may occur, thus requiring the application of a second layer of sealant. The level of sealant will be allowed to be slightly below the pavement existing pavement level. All excess sealants will be removed from the crack with a minimum overlap onto adjacent pavement.
      1. Contractor will furnish and spread sufficient sand necessary to eliminate tracking or damage to crack sealant. On all trails, bikeways, and parking lots where sand will be applied over fresh crack sealant, Contractor will post "Loose Gravel" (C6) maintenance signs. Signs will be posted from commencement of crack sealing until all sand has been cleaned from the project area. Contractor will remove all sand by sweeping within 24 hours after opening trail, bikeway, or parking lot to traffic.
      1. Full compensation for conforming to requirements of “Crack Seal –Routed” including:
      1. Crack routing.
      2. Crack cleaning.
      3. Application of sealant.
      4. Furnishing all labor, materials, exclusive of sealant, tools, equipment, and incidentals necessary to perform the work will be considered as included in Contract unit price per “Linear Foot” in accordance with this Scope of Work and no additional compensation will be allowed.

       

      1. CRACK SEAL – NON-ROUTED
      1. The quantity and approximate size of ‘Crack Seal: non-routed' areas will vary by location but will not exceed a total of 4,000 square feet per work order at any given site. Inspector or County Representative will supply estimated quantity only.
      1. County may, at its option specify an alternative method of crack cleaning and filling.
      1. Sealant will not be placed when the pavement temperature is below 40 degrees Fahrenheit or during unsuitable weather.
      2. Under this method cracks will be cleaned and dried by use of a high-pressure hot air wand with a minimum pressure of 120 PSI heated to 350°F with all loose material blown from the crack and the adjacent pavement dried and heated to improve adhesion of the sealant. All loose material will be swept from pavement surface and disposed of by Contractor.
      1. Sealant will be placed while crack surface is still hot to increase adhesion of the sealant to existing pavement. Sealant will be placed to ensure the bottom of the crack is filled first with sealant continuing to pavement surface in a manner which does not result in sealant bridging or entrapping air pockets. With deep cracks, settlement may occur, thus requiring the application of a second layer of sealant. Level of the sealant will be allowed to be slightly below the level of existing pavement.
      1. All excess sealants will be removed from the crack with a minimum overlap onto adjacent pavement.
      1. Contractor will furnish and spread sufficient sand necessary to eliminate tracking or damage to crack sealant. On all trails, bikeway, and parking lots where sand will be applied over fresh crack sealant, Contractor will post "Loose Gravel" (CG) construction signs. Signs will be posted from commencement of crack sealing until all sand has been cleaned from roadway. Contractor will remove all sand by sweeping within 24 hours after opening the street to traffic.
      1. Full compensation for conforming to requirements of “Crack Seal: Non-Routed” including:
      1. Crack cleaning and heating;
      2. Application of sealant;
      3. Removal of debris;
      4. Furnishing all labor, materials (exclusive of sealant) tools, equipment, and incidentals necessary to perform the work will be considered as included in Contract unit price per “Linear Foot” in accordance with this Scope of Work and no additional compensation will be allowed.

       

      1. APPLICATION OF "PERCOL" SEALANT
      1. County may specify the application of “Percol” brand sealant for particular applications. This may include filling unusually wide cracks or as a surface treatment on the pavement to fix damaged pavement Application will be by personnel trained and qualified in the application of Percol.
      1. Full compensation for conforming to the requirements of “Application Of “Percol” Sealant” including:
      1. Cleaning of the surface to be sealed, cracks and/or pavement surface.
      2. Application of “Percol” sealant.
      3. Furnishing all labor, materials, tools, equipment, and incidentals necessary to perform the work will be considered as included in Contract unit price per “Gallon” in accordance with this Scope of Work and no additional compensation will be allowed.

       

      1. UNTREATED BASE MATERIAL
      1. Untreated base will be used where directed by Inspector or County Representative to correct a subsurface problem or where required minor paving work justifies its use.
      1. Untreated base to be used for the base course under asphalt concrete pavement will conform to Section 200-2 and OCPW Standard Plan 1804.
      1. Payment for “Untreated Base Material” will be made at Contract unit price per TON which will include full compensation for furnishing all material required in accordance with the plans and these special provisions and no additional compensation will be allowed. This item includes removal of native/existing material below the depth of excavation for new asphalt included.
      1. Quantity set forth in bid item for “Untreated Base Material” is an anticipated amount only to establish a unit price. No adjustment in compensation will be made in Contract unit price for “Untreated Base Material” regardless of the amount or reason for the increase or decrease in quantity of these items required. Provisions in Section 3-2, “Change Initiated by the Agency," of the Standard Specifications will not apply to the item of “Untreated Base Material”.
      1. COLD MILLING OF ASPHALT CONCRETE PAVEMENT

       The quantity and approximate size of 'Cold Milling of Asphalt Concrete Pavement' areas will vary by location but will not exceed a total of 4,000 square feet per work order at any given site.

      1.  Inspector or County Representative will designate and mark exact limits of each area to be cold milled.
      1. Areas indicated for Cold Milling may be anywhere from 0” to 1” in depth.
      1. “Cold Milling of Asphalt Concrete Pavement” will be in accordance with Section 302-5-2 of the Standard Specifications.
      1. While all material removed by Cold Milling operations will be considered property of Contractor and disposed of by Contractor at his expense, County, at its option, may identify and offer disposal sites to Contractor when County has a potential for reuse of cold milled material. Contractor’s use, at his option, of County disposal sites will not result in a change of unit price of “Cold Milling of Asphalt Concrete Pavement”.
      1. Full compensation for conforming to requirements of “Cold Milling of Asphalt Concrete Pavement” including:
      1. Cold milling of asphalt;
      2. Removal of debris from work area;
      3. Furnishing all labor, materials including fog seal, tools, equipment, and incidentals necessary to perform the work will be considered as included in Contract unit price per “Square Foot” in accordance with this Scope of Work and no additional compensation will be allowed.

       

       

       

      1. PAVEMENT REINFORCEMENT FABRIC
      1. Work will consist of placing reinforcing fabric over existing pavement and/or between layers of pavement on leveling course and overlay if specified on work order for a particular location.
      1. “Pavement Reinforcing Fabric” will conform to special provisions in OCPW Standard Plan 1808, to the Special Provisions and the following:
      1. Asphalt cutbacks will not be used in the asphalt binder
      2. Binder application should be accomplished with an asphalt distributor for all surfaces and will be applied at a temperature of not less than 295 degrees Fahrenheit, nor more than 325 degrees Fahrenheit, the exact temperature to be determined by the Inspector or County Representative.
      3. Fabric can withstand direct application of asphalt concrete up to 300 degrees Fahrenheit without shrinkage or damage. Asphalt concrete will be placed at as high a temperature as practicable but will not exceed 300 degrees Fahrenheit Note: Where the narrow strip of pavement reinforcing fabric is required over the joint between a concrete median curb and the asphalt pavement, a tack coat of 0.45 gallon per square yard of SS-1h may be used.
      1. Prior to placing pavement reinforcing fabric, all raised pavement markers will be removed.
      1.  Pavement reinforcing fabric will be placed in standard 6½’ wide and 12½’ wide increments to most closely approximate actual pavement width, unless specifically designated on the plans or directed by the Inspector or County Representative.
      1. Public traffic will not be allowed on the bare reinforcing fabric, except that public cross traffic will be allowed to cross the fabric, under traffic control, after Contractor has broadcast a small quantity of asphalt concrete over the fabric.
      1. Pavement reinforcement fabric will be measured for payment by the square yard of existing pavement covered and no payment will be made for laps.
      1.  Full compensation for conforming to requirements of “Pavement Reinforcement Fabric” including:
      1. Cleaning and preparing the surface location.
      2. Applying tack coat to surface.
      3. Placing fabric.
      4. Furnishing all labor, materials including fog seal, tools, equipment, and incidentals necessary to perform work will be considered as included in Contract unit price per “Square Yard” in accordance with this Scope of Work and no additional compensation will be allowed.

       

      1. PAVE ASPHALT CONCRETE SLOT WITHIN THREE (3) WORKING DAYS
      1. It is the responsibility of Contractor to fill in the asphalt slot area behind new concrete installation. Contractor will be notified by email with location, square footage and depth and has three (3) days after notification to have the area backfilled with asphalt concrete (not including weekends or holidays). Quantities and approximate sizes of areas will vary for each location. Areas will be ready for new asphalt installation with no other work required, except in front of a drive approach where base material may be required to be removed. Contractor will notify Inspector or County Representative upon completion so that barricades may be picked up.
      1. All materials removed will be properly disposed of by Contractor and not left on County property. Completed project will be left with a clean and finished appearance.
      1. Prior to placement of asphalt concrete, a tack coast of SS-1h emulsified asphalt will be uniformly applied to all contact surfaces at a rate of 0.05 gallon per square yard.
      1. Asphalt concrete used for PAVE AC SLOT will be AR-4000 and will, conform to provisions of OCPW Standard Plan 1805 and this Scope of Work.
      2. Asphalt concrete will not be placed when the atmospheric temperature is below 50 degrees Fahrenheit or during unsuitable weather.
      1. Full compensation for conforming to requirements of “Pave Asphalt Slot Within 3 Working Days” including:
      1. Removal and disposal of base material (as needed);
      2. Compaction of sub-grade;
      3. Placement of tack coat;
      4. Placement and compaction of asphalt concrete pavement;
      5. Furnishing all labor and materials including asphalt concrete, tools, equipment, and incidentals necessary to perform the work will be considered as included in Contract unit price per “Square Foot” in accordance with this Scope of Work and no additional compensation will be allowed. There are two pay items for this Section, price per Square Foot for 4” and 6” depths.

       

      1. SPEED BUMP INSTALLATION
      1. There are occasions when speed bumps are requested by parks. Speed bumps will not be installed on any trail or path; installations of speed bumps are for parking lots only. Inspector or County Representative will designate and mark each location where a speed bump is requested. Speed Bump exhibits that depict a sample style requested will be provided and actual placement will vary and be approved by Inspector or County Representative.
      1. Prior to placing asphalt concrete on existing pavement, the area will be thoroughly cleaned by removing all dirt, moisture, and other foreign matter, including washing as necessary, and will install a uniformly applied tack coat of SS-h emulsified asphalt to all contact surfaces of existing pavement at a rate of 0.05 gallon per square yard.
      1. This work shall conform to Section 302-5, “Asphalt Concrete Pavement,” of the Standard Specifications, OCPW Standard Plan 1805 and this Scope of Work.
      1. Asphalt concrete shall be C2-AR-4000.
      1. Full compensation for conforming to requirements of “Speed Bump Installation” including:
      1. Removal and disposal of existing speed bump;
      2. Cleaning and preparing existing pavement for a new speed bump;
      3. Providing all traffic control;
      4. Forming and placing and compacting new asphalt concrete speed bump;
      5. Furnishing all labor, materials, tools, equipment, and incidentals necessary to perform work will be considered as included in Contract unit price per “Square Foot” in accordance with this Scope of Work and no additional compensation will be allowed.

       

       

       

       

      1. RUBBERIZED EMULSION-AGGREGATE SLURRY (REAS)
      1. General:
      1. Slurry seal with rubberized emulsion shall conform to the requirements of the Standard Specifications and Section 600-3, “Rubberized Emulsion – Aggregate Slurry,” of the Standard Specifications for Public Works Construction, and this Scope of Work.
      2. Slurry seal with rubberized emulsion shall be “Flex Seal” slurry seal, manufactured by Petrochem Marketing, Inc., 3033 Washington Boulevard, Los Angeles, California, (323) 526-4078. An equal product such as Tire Rubber Modified Slurry Seal (TRMSS) can be substituted, subject to approval by the Inspector or County Representative.
      1. Material:
          1. The Rubberized Polymer Modified Emulsion (RPME) shall be slow-set emulsion and shall contain asphalt, crumb rubber, and polymer modifiers.

       

      1. At the time of delivery of each shipment of RPME or REAS, the Contractor shall deliver to the County certified copies of the test report. The test report shall indicate the name of the vendor, type and grade of asphalt emulsion delivered, date and point of delivery, quantity delivered, delivery ticket number, purchase order number, latex brand, designation, and rate mixed with the emulsified asphalt, and results of the specified tests. The test report shall be signed by an authorized representative of the vendor, shall certify that the product delivered conforms to the standard specifications and is compatible with the proposed aggregate. At the request of the County Inspector or County Representative, samples of the emulsion at the stockpile site or the plant will be tested to determine compliance with the above requirements. Testing shall be accomplished by an accredited material testing laboratory approved by a County Inspector or County Representative. Records of the test results shall be provided to the Inspector or County Representative and the testing required in connection with those results and all additional testing shall be provided by the Contractor at no cost to the County.

       

      1. No material from that shipment of RPME or REAS shall be utilized or employed in performance of the work until the certified test reports and samples of the material have been furnished to, checked by, and approved by the Inspector or County Representative to determine their conformity with the prescribed requirements. Delays by the Contractor in furnishing the required test reports will not be grounds for any extension of contract time.

       

      1. Composition of REAS

       

       

      1. For continuous flow mixing, the Contractor, at the request of the County Inspector or County Representative, shall schedule and coordinate the delivery of aggregate to the stockpile(s) such that: (1) deliveries originate at the plant and arrive at the stockpile site no earlier than 7:00 A.M. or later than 4:00 P.M. on the same calendar day, (2) delivery site and project name are explicitly stated on each delivery ticket, (3) successive deliveries on the same calendar day show the cumulative total for that day, (4) copies of all delivery tickets are delivered to the Inspector or County Representative before the end of the working day, whereas any delivery tickets not so delivered may be rejected by the Inspector or County Representative. Any deviation from this process must have the prior approval of the Inspector or County Representative.

       

      1. Type I aggregate shall be used unless Inspector or County Representative approves otherwise.

       

      1. Gradation of Aggregates

      1. Mix Design:
      1. At least 15 working days prior to starting the placement of slurry seal, the Contractor, at its expense, shall submit a current signed original of mix designs and the test results of the slurry components, which include aggregate, emulsion, water, and additives. Test results shall include Consistency Test, Set Time, Cure Time, and the Wet Track Abrasion Test (WTAT). All testing shall be at the request of County Inspectors or County Representative and performed with samples that are representative of the actual materials to be used.
      2. All material testing and mix designs shall be performed by a qualified laboratory, approved by the County Inspector or County Representative and capable of performing the applicable ASTM and California tests.
      3. The laboratory report shall clearly show the proportions of aggregate, fill (Minimum and maximum), water (minimum and maximum), residual percent asphalt based on dry weight of the aggregate; emulsion percent based on dry weight of the aggregate, designation, rate, and method of mixing with the emulsion, additives required for an optimum slurry seal mix, and weight per gallon of REAS.
      4. The Inspector or County Representative will determine if the mix design is best suited to its needs, based upon the test results, including the content of emulsion and water needed to produce slurry with a maximum loss of 75 grams per square foot by WTAT. The standard WTAT template may be modified to a thickness of 3.18mm (0.125 in.), when using fine aggregate.
      5. Once the proportions of materials to be used are approved by the Inspector or County Representative, no substitution of other material will be permitted unless the materials proposed for substitution are first tested by the same approved laboratory that performed the mix design testing, and a laboratory report is submitted for the substituted design as specified above. Substituted materials shall not be used until the mix design for that material is approved by the Inspector or County Representative.
      6. Adjustments may be required during construction, based on field conditions. The Contractor shall obtain the Inspector’s or County Representative approval prior to any adjustments.
      1. Mixing and Equipment:
      1. For central mixing plant, combining of the RPME and aggregate in the mixing tank shall be calibrated in gallons and equipped with load cells and a full sweep agitator capable of producing a homogeneous slurry mix. All storage tanks and delivery vehicles shall be equipped with an agitator. The REAS shall be delivered to the slurry site and spread directly behind the truck with a mechanical-type squeegee distributor, or the slurry may be pumped into smaller trucks equipped with mechanical type squeegee distributors. All spreading equipment shall contain fog/water systems per 302-4.3.2. The mixing tank shall not be used to supply more than one job at a time.
      2. The weight per gallon of REAS delivered to the spreader box shall be within 0.92 lbs./gal of the mix design.
      3. A central mixing plant shall not be used for quick set REAS.
      4.  For continuous flow mixing, the mixing equipment shall be a multi-blade or spiral continuous-flow unit in good working condition. All units used on the project shall have a visual readout display and have the means to accurately meter the individual quantities of aggregate, water, emulsion, and additives being fed into the mixer. All feeding mechanisms must be continuous feed and proportioning must remain constant at all times.
      5. Calibration for the introduction of emulsion into the mixer shall include pumping the emulsion to establish a volumetric consistency within 2.0 percent of the mathematical average of 3 runs of at least 300 gallons. Emulsion pumps shall be equipped with an electronic automatic shut-down device which activates and shuts down the belt feeder when the emulsion level is lowered.
      6. Variable volume pumps shall be equipped with a lock and shall be locked following calibration.
      7. Calibration for the introduction of aggregate into the mixer shall include the delivery of aggregate with the volumetric consistency that shall not exceed 2.0 percent of the mathematical average of 3 runs of at least 3 tons.
      8. The belt delivering the aggregate to the pugmill shall be equipped with a device to monitor the depth of the aggregate being delivered to the pugmill. Said device for monitoring depth of aggregate shall automatically shut down the power to the aggregate belt feeder whenever the depth of aggregate is less than 70 percent of the target depth flow.
      9.  In the event that the metering devices stop working, the slurry units will stop the application of slurry until they are fixed.
      10. The spreader box shall be equipped with flexible material in contact with the pavement and shall be maintained so as to prevent loss of slurry. It shall be adjustable to ensure a uniform controlled spread and be equipped with a mechanical or hydraulic type horizontal shifting device.
      11. The mixture of slurry seal shall not bleed, ravel, separate, or show other signs of distress following its placement.
      12. ADD the Section 600-3.3.1, "Field Mixing and Spreading Equipment Calibration," the following: The Contractor shall allow 14 days prior to the start of work for calibration and for all required testing at a location to be designated by County Inspector or County Representative. The Contractor, at its expense, shall arrange for field samples to be obtained at the time of calibration by the same approved laboratory that performed the mix design testing.
      1. Application:
      1. The Contractor shall provide a coordinator, at least one competent and experienced slow-set man, and one competent experienced driver for the truck applying the slurry. The Contractor shall also provide sufficient laborers for any hand work and clean-up required ensuring proper progress of work.
      2. The trails, paths, driveways, or parking lots to be slurried shall be closed from the time the application begins until the County Inspector or County Representative determines the mixture has achieved sufficient set to be opened to traffic. If possible, slurry seal shall be applied to tree shaded areas in the early morning to allow proper curing.
      3. At the discretion of the County Inspector or County Representative, the placement of slurry seal may be suspended due to unsuitable weather, air or pavement temperature, or other conditions that are considered unfavorable for the prosecution of the work. The Contractor shall immediately comply with the written order for suspension by the County Inspector or County Representative, and work shall not be resumed until approved by the County Inspector or County Representative in writing.
      4. The days during which the suspension of work is in effect shall not be considered as working days as defined in Section 6-7.3, "Contract Time Accounting," and the date of completion shall be extended accordingly. In the event of a suspension of work, the Contractor shall provide for satisfactory passage of traffic through any incomplete portions of the project. No adjustment of unit prices of any items or other increase compensation shall be allowed due to a suspension of work as described above.
      5. Prior to applying slurry, all vegetation previously sprayed with an herbicide shall be removed from cracks in the pavement and joints between the pavement and concrete gutters by the Contractor. Prior to applying slurry, all raised pavement markers shall be removed by the Contractor. The surface to be sealed shall be cleaned by the Contractor by washing, heating, scraping, or other means necessary to remove moisture, dirt, grease, or other foreign matter which would reduce the bond between the slurry and the pavement. Immediately ahead of the slurry truck, the pavement shall be pre-wetted by a pressure water distribution system equipped with a fog-type spray bar which will completely dampen the surface of the pavement. The rate of application will be determined by the inspector or County Representative based on pavement conditions at the time of application.
      6. Slurry shall be applied utilizing such equipment and methods such that no longitudinal or transverse ridges are noticeable either visually or in vehicle ride quality. All loose aggregate shall be removed by sweeping within 24 hours after application.
      7. The Contractor shall fix, replace, or reseal all pavement areas that have not been properly or completely sealed, which have been damaged by traffic due to premature opening or softening from warm weather, or which develop bleeding, raveling, separation other distress. All remedial maintenance shall be completed within 14 days after notification by the Inspector or County Representative and shall be completed at no cost to the County.
      8. During slurry seal operations it shall be the Contractor's responsibility to thoroughly and adequately protect all manhole covers, water valve covers, and utility vault covers, all survey “monumentation”, and all drainage facilities. The contractor shall employ all means necessary to protect and clean these existing facilities to their original condition or shall bear the cost to replace them where necessary.
      9. Any manhole cover, water valve cover, utility vault cover or drainage facility cover found to be inadequately protected and cleaned shall be cleaned by means such as sandblasting to remove all slurry material (including material remaining from previous applications) from the metal surface or it shall be replaced by the contractor at its expense.
      10. The start and finish of a slurry application shall be a straight line which, unless otherwise approved by the Inspector or County Representative, shall be obtained by laying a strip of building paper or other material, approved by the Inspector or County Representative, on the pavement surface. After application of slurry, the paper shall be removed, leaving a straight edge.
      11. Spillage resulting from hauling operations along or across any publicly travel way shall be removed immediately by the Contractor at its expense.
      12. RPME Application Rates

      1. Measurement and Payment:
      1. Payment for Slurry Seal-Type I will be made at the contract unit price per “Gallon” which shall include full compensation for furnishing the complete Rubberized Emulsion Aggregate Slurry (REAS) Type I material (including aggregate), all labor, materials, tools, equipment, and incidentals required for all necessary property owner notification, posting of "No Parking" signs, traffic control, vegetation removal and street cleaning, mix design material testing and providing of mix design, mixing, and placing REAS, sanding and sweeping for traffic access, removing excess slurry, fixing damaged or improperly cured slurry, securing and cleaning stockpile areas, and clean-up in accordance with this Scope of Work and no additional compensation will be allowed.
      1. REMOVE AND REPLACE PORTLAND CEMENT CONCRETE

      The quantity and approximate size of 'Remove and Replacement Portland Cement Concrete' areas will vary by location but will not exceed a total of 4,000 square feet per work order at any given site.

      1. Inspector or County Representative will designate and mark the remove and replace Portland Cement Concrete pavement limits when preparing work request.
      1. Spalled or loose blocks of pavement and pavement cracks wider than 3/8” may be deemed justification for extending or adding new areas to the “Remove and Replace Portland Cement Concrete Pavement”. Contractor must notify the Inspector or County Representative when the limits marked on the pavement appear incorrect. Inspector or County Representative will notify Contractor of the decision within four hours of notification.
      1. Areas indicated for “Remove and Replace Portland Cement Concrete Pavement” will be saw cut and excavated to the full depth of the existing concrete, to include aggregate base and/or native soil. Additional aggregate base and/or native soil will be removed to permit correction of a subsurface problem.
      1. Concrete pavement will be removed to clean straight lines before replacement to ensure that all areas are accessible to equipment used to compact replacement materials. Subgrade will be compacted to a relative compaction of not less than ninety-five (95) percent.
      1. All materials removed will be disposed of outside of the right-of-way, which will be left with a clean and finished appearance.
      1. Prior to placement of Portland Cement Concrete, rebar dowels shall be placed in existing adjoining concrete per OCPW Standard Plan section 1803.
      1. Concrete used for replacement of existing pavement will be fiber reinforced with a minimum of 3500psi and will conform to the provisions of OCPW Standard Plan section 1803 and this Scope of Work. Replacement will be made full depth with concrete.
      1. Concrete will not be placed when the atmospheric temperature is below 50 degrees Fahrenheit or during unsuitable conditions.
      1. Concrete will not be placed when rain is forecasted for the day of maintenance or during any unsuitable weather.
      1. Contractor shall place temporary traffic markings (tabs) when any traffic markings are removed
      1.  Contractor shall supply the necessary equipment or material to eliminate/minimize material tracking from job site.
      1. Contractor will notify Inspector or County Representative, at the end of the working day when striping and/or stenciling are damaged as a result of concrete maintenance.
      1. Full compensation for conforming to requirements of “Remove and Replace Portland Cement Concrete Pavement” including:
      1. Saw cutting;
      2. Removal and disposal of pavement, base material, and/or native soil;
      3. Compaction of sub-grade;
      4. Placement of rebar dowels:
      5. Placement of concrete pavement;
      6. Furnishing all labor, materials including concrete, tools, equipment, and incidentals necessary to perform the work will be considered as included in the Contract unit price per “Square Foot” in accordance with this Scope of Work and no additional compensation will be allowed. There are 27 pay items for this Section: price per “Square Foot” for 4” to 30”, for areas less than 100 S.F. or area greater than 100 S.F.
      1. ADJUSTMENT OF MANHOLE FRAME AND COVER
      1. There are occasions when utility manhole covers require adjustment in areas of current asphalt concrete operations or due to settlement.
      1. Inspector or County Representative will designate and mark each manhole to be adjusted when preparing work request.
      1. Sewer and storm drain manhole frames within the area to be paved or graded will be set to finish grade by Contractor. Manholes in asphalt concrete pavement will be set to finish grade in accordance with provisions of Subsection 302-5.8. In the case of Portland cement concrete pavement, manhole covers will be set to finish grade before paving.

      Repaving required as a result of reconstructing or adjusting all manhole and vault frames and covers to grade will be the responsibility of the Contractor and the cost thereof will be included in the bid item for pavement.

      1. Contractor will remove all debris from the interior of manholes and will clean all foreign material from the top of the frames and covers.
      1. Payment for preparing a sub-grade will be considered as included in the item of work for which the sub-grade is prepared.
      1. Adjusting manhole frames and covers to grade, where the difference between the lowest point of manhole removal and final elevation of the top of the frame is less than 375 mm (15 inches) or where the adjustment is accomplished by adjustment rings only, will be included in the unit price for adjusting each manhole frame.
      1. Full compensation for conforming to requirements of “Adjustment of Manhole Frame and Cover” including:
      1. Removal existing manhole cover and frame up to 15”;
      2. Removal of debris from work area;
      3. Compaction of sub-grade;
      4. Adjustment of manhole cover;
      5. Furnishing all labor and materials including asphalt concrete, tools, equipment, and incidentals necessary to perform the work will be considered as included in Contract unit price per “Each” in accordance with this Scope of Work and no additional compensation will be allowed.

       

      1. CREW RENTAL (CREW AND EQUIPMENT)
      1. County may request the Contractor to perform asphalt maintenance operations outside the scope of previous work items. The contractor will be given a specific location and job description by Inspector or County Representative and meet prior to any work being performed. The contractor shall furnish a crew with the equipment necessary to perform the requested work.
      1.  Full compensation for conforming to requirements of “Crew Rental (Crew and Equipment)” including:
      1. Supplying a crew with all the necessary equipment;
      2. Cleanup, removal, and disposal of debris;
      3. Furnishing all labor, materials, tools, equipment, and incidentals necessary to perform work will be considered as included in Contract unit price per “Hour” in accordance with this Scope of Work and no additional compensation will be allowed.

       

      1. ADDITIONAL WORK/MISCELLANEOUS MATERIALS
      1.  There may be occasions when County may request Contractor to supply materials to complete a project such as traffic loops, special subgrade material, utility covers, or manholes covers and rings.
      1. If this option is used, Contractor will be required to provide with invoice to County, a copy of supplier’s invoice for any part costing $100.00 or more. Materials and supplies will be itemized separately on invoice.
      1. Cost of materials reported will be at invoice or lowest current price at which such materials are locally available and delivered to the job site in the quantities involved, plus sales tax.
      1. County reserves the right to approve materials and sources of supply, or to supply materials to the Contractor if necessary for the progress of the work. No markup will be applied to any materials provided by County.

       

    • Review

      Before submitting a bid, Bidders shall carefully review the General Instructions and examine the solicitation contents, including the Model Contract Terms, Conditions and Scope of Work. Bidders shall include in their bid response a monetary sum to cover the cost of all items included in the Contract.  The Model Contract contained in this solicitation is the Contract proposed for execution.  Upon award, awarded Bidder will be required to sign and submit Contract for execution.

    • Availability of Documents

      The Contract Documents, General Conditions, Plans, and Special Provisions are available electronically via the County’s OpenGov Procurement portal at: https://procurement.opengov.com/portal/ocgov

    • Title VI Solicitation Notice (Federal Contract Provision Guidelines Section A5.3.1)

      Title VI Solicitation Notice: The (Title of Recipient), in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4), 28 CFR § 50.3, and 49 CFR Part 21, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, all contractors will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of the owner’s race, color, national origin, sex, creed, age, or disability in consideration for an award.

    • DVBE:

      Effective January 1, 2021, County of Orange Board of Supervisors adopted the DVBE Preference policy. The DVBE Preference policy supports local business opportunity, economy and the development of County’s tax base, and in addition recognizes the service and sacrifice given by the men and women of our Armed Forces.

      To be certified as a Disabled Veteran Business Enterprise by the County of Orange, a business shall meet (A) and (B) below:

      1. Must be certified as a DVBE by the State of California Department of General Services (DGS); and, 
      2. DGS DVBE requirements must be valid at the time of bid/proposal submittal through the time of award of the contract.

      To participate as an OCLSB and/or DVBE please read and follow the process outlined in COUNTY OF ORANGE LOCAL SMALL BUSINESS (OCLSB) AND DISABLED VETERAN BUSINESS ENTERPRISE (DVBE) CERTIFICATION REQUIREMENTS in the VENDOR RESPONSES.

      *NOTE: DVBE PREFERENCE IS NOT APPLICABLE TO PUBLIC WORKS OR A-E CONSTRUCTION PROJECTS.

    • Definitions

      Terms used in this document shall have the meanings assigned to them in the "Definitions" section of the General Conditions.

    • Responsiveness

      Responsive bids shall include completed submittals/attachments provided in the Vendor Responses.

    • Important Notice

      The County has attempted to provide all information available.  It is the responsibility of each Bidder to review, evaluate, and, where necessary, request any clarification prior to submission of a bid.  If any person contemplating submitting a bid in response to this IFB is in doubt as to the true meaning of any part of the solicitation documents attached hereto or finds discrepancies in or omissions from the specifications, they must submit a written request for clarification/interpretation to the County Deputy Procurement Agent (DPA), Mauricio Escobar, via the County’s online biding system.

    • Mandatory Pre-Bid Meeting Webinar

      All Bidders must be in attendance at the Pre-Bid Webinar Meeting in order to continue in the bidding process. The Pre-Bid Webinar Meeting will be conducted one time only. Attendance will be taken at the webinar meeting, at the beginning and the end of the meeting. Attendance during entire webinar is required.

      1. PRE-BID INFORMATION
        DATE: NO VALUE
        TIME: NO VALUE – NO ONE WILL BE ADMITTED AFTER NO VALUE
        LOCATION: NO VALUE
      2. Please RSVP your attendance through the e-procurement portal by close of business day on TBD.
      3. The purpose of the Pre-Bid Meeting will be to discuss the Job Order Contract (JOC) concept, and discuss JOC from a Contractor’s perspective. For Contractors who are new to the JOC process, a training workshop will be part of the Pre-Bid Meeting.
    • Optional Procurement and Pre-Bid Demographic Survey

      John Wayne Airport (JWA) is requesting information on the racial and ethnic ownership of businesses seeking contractual or business opportunities with the Airport.  Please provide this information in the following online form: https://forms.office.com/g/JDEyLfcptc

      Only one survey response should be submitted per business for each opportunity.  Your assistance in providing this voluntary and anonymous information is greatly appreciated and supports JWA’s measurement of business diversity performance.

    • Bid Content

      Responsive bids must include the following completed forms and documentation, submitted via the County’s online bidding system. Bids that do not meet these requirements may be deemed non-responsive.

    • Clarification/Interpretation

      If clarification or interpretation of this solicitation is considered necessary by County, a written addendum shall be issued and the information will be posted on County’s online bid system.  Any interpretation of, or correction to, this solicitation will be made only by addendum issued by the County DPA.  All addenda will be submitted and posted on the County’s online bidding system.  It is the responsibility of each Bidder to periodically check the County’s online biding system to ensure that they have received and reviewed any and all addenda to this solicitation.  The County will not be responsible for any other explanations, corrections to, or interpretations of the documents, including any oral information.

      All questions or requests for interpretation must be received within this solicitation's Question & Answer section by Friday, June 26, 2026 before 2:00 pm.

    • Bid Submission

      Electronic Bids shall be submitted via the County’s online bidding system via the following  link https://procurement.opengov.com/portal/ocgov.  All required sections of the IFB as listed above, must be submitted via the County’s eProurement Portal.  Bidder is solely responsible for “on time” submission of their electronic bid.  The County will not accept late bids and no exceptions shall be made.  County will only receive those bids that were transmitted successfully. 

      Note: Electronic Bids cannot be viewed by County until after the solicitation deadline. If you encounter any problems with your registration, system, bid submission, or other system issues, please contact OpenGov’s support staff via the live chat option or via email at procurement-support@opengov.com.

    • Non-Mandatory Pre-Bid Meeting Webinar

      A Non-Mandatory Pre-Bid Webinar Meeting will be conducted at the stated date and time. Attendance is not mandatory but is highly recommended for any parties interested in submitting a bid.

      1. PRE-BID INFORMATION
        DATE: NO VALUE
        TIME: NO VALUE – NO ONE WILL BE ADMITTED AFTER NO VALUE
        LOCATION: NO VALUE
      2. Please RSVP your attendance through the e-procurement portal by close of business day on NO VALUE.
      3. The purpose of the Pre-Bid Meeting will be to discuss the Job Order Contract (JOC) concept, and discuss JOC from a Contractor’s perspective. For Contractors who are new to the JOC process, a training workshop will be part of the Pre-Bid Meeting.
        • The County strongly encourages a responsible managing officer from the Contractor’s office to attend this meeting. Bidders may request one (1) CD which contains the Construction Task Catalog® and the Technical Specifications.
    • OCLSB/DVBE Certification Requirements:

      County Of Orange Local Small Business (OCLSB) Preference And Disabled Veteran Business Enterprise (DVBE) Certification Requirements

      1. To participate as an OCLSB and/or DVBE the following requirements must be met:
        1. Must be certified with State of California the Department of General Services (DGS) as a Small Business. - https://caleprocure.ca.gov/pages/sbdvbe-index.aspx
        2. Must be certified with DGS as a DVBE. - https://caleprocure.ca.gov/pages/sbdvbe-index.aspx
        3. Maintains their principal center of operations (i.e. headquarters) within Orange County.
        4. Certification must be valid at the date/time solicitation is closed, and it shall remain in effect at the time of contract award. County reserves the right to verify and/or reject incomplete documents.
        5. Complete and sign the Affirmation form attached herein. The signed Affirmation form and the OCLSB Certification are required and must be returned with the solicitation response.
      2. OCLSB or DVBE Preference provides for the following:
        1. Invitation for Bid – IFB
          A five percent (5%) deduction in the original bid price shall be applied to all confirmed OCLSB or DVBE bidders for evaluation purposes. If the lowest bidder is a certified OCLSB or DVBE bidder, the contract will be awarded at the certified OCLSB or DVBE’s original bid price. The maximum allowable preference deduction is $100,000.
        2. Request for Proposal - RFP
          1. No Cost - Any Request for Proposals that does not include cost as a scoring criteria shall instead apply the five percent (5%) or eight percent (8%) preference percentage pursuant to the eligibility requirements above to a scoring criteria in the RFP that makes up no more than twenty percent (20%) of the total RFP.
          2. With Cost - An additional five percent (5%) shall be applied to the total cost of each certified OCLSB or DVBE to obtain their final score. If the final score of any OCLSB or DVBE matches the final score of a respondent who is not an OCLSB or DVBE, preference shall be given to the certified OCLSB or DVBE. If two or more OCLSBs and/or DVBEs have the same final score, the County shall determine the contract award based on the County’s best interests. Notwithstanding these preference procedures, the Orange County Board of Supervisors reserves the right to award contracts in any other permissible manner in consideration of the County’s best interests.
      3. Dual OCLSB and DVBE Preference provides for the following:
        1. Business Certified as OCLSB and DVBE
          If a State-certified OCLSB is also a State-certified DVBE, the preference given to that business shall be 8% instead of 5%.
      4. Subcontractors
        If bidder is submitting subcontractors to qualify for the OCLSB or DVBE preference, bidder must demonstrate through the Staffing Plan that 20% of the total bid amount is allocated to the OCLSB and/or DVBE subcontractor(s).

      *NOTE: DVBE PREFERENCE IS NOT APPLICABLE TO PUBLIC WORKS OR A-E CONSTRUCTION PROJECTS.

    • Civil Rights and Nondiscrimination
      1. General Civil Rights Provisions: In all its activities within the scope of its airport program, the Contractor agrees to comply with pertinent statutes, Executive Orders, and such rules as identified in Title VI List of Pertinent Nondiscrimination Acts and Authorities to ensure that no person shall, on the grounds of race, color, national origin, creed, sex, age, or disability be excluded from participating in any activity conducted with or benefiting from Federal assistance.
        This provision is in addition to that required by Title VI of the Civil Rights Act of 1964.
        The above provision binds the Contractor and subcontractors from the bid solicitation period through the completion of the contract.
      2. Nondiscrimination: In the performance of this Contract, Contractor agrees that it will comply with the requirements of Section 1735 of the California Labor Code and not engage nor permit any subcontractors to engage in discrimination in employment of persons because of the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, or sex of such persons. Contractor acknowledges that a violation of this provision shall subject Contractor to penalties pursuant to Section 1741 of the California Labor Code.
      3. Compliance with Nondiscrimination Requirements: During the performance of this contract, the Contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “Contractor”), agrees as follows: 
        1. Compliance with Regulations:  The Contractor (hereinafter includes consultants) will comply with the Title VI List of Pertinent Nondiscrimination Acts and Authorities, as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract.
        2. Non-Discrimination:  The Contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, national origin, creed, sex, age, or disability in the selection and retention of subcontractors, including procurements of materials and leases of equipment.  The Contractor will not participate directly or indirectly in the discrimination prohibited by the Nondiscrimination Acts and Authorities, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR part 21 including amendments thereto.
        3. Solicitations for Subcontracts, including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding or negotiation made by the Contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the Contractor of the contractor’s obligations under this Contract and the Nondiscrimination Acts and Authorities on the grounds of race, color, or national origin.
        4. Information and Reports: The Contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Sponsor or the Federal Aviation Administration to be pertinent to ascertain compliance with such Nondiscrimination Acts and Authorities and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the Contractor will so certify to the Sponsor or the Federal Aviation Administration, as appropriate, and will set forth what efforts it has made to obtain the information.
        5. Sanctions for Noncompliance: In the event of a Contractor’s noncompliance with the nondiscrimination provisions of this contract, the Sponsor will impose such contract sanctions as it or the Federal Aviation Administration may determine to be appropriate, including, but not limited to:
          1. Withholding payments to the Contractor under the contract until the Contractor complies; and/or
          2. Cancelling, terminating, or suspending a contract, in whole or in part.
        6. Incorporation of Provisions: The Contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations, and directives issued pursuant thereto. The Contractor will take action with respect to any subcontract or procurement as the Sponsor or the Federal Aviation Administration may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the Contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the Contractor may request the Sponsor to enter into any litigation to protect the interests of the Sponsor. In addition, the Contractor may request the United States to enter into the litigation to protect the interests of the United States.
          Upon request by the County, Contractor will provide a copy of each subcontract to demonstrate the above language has been inserted.
      4. Title VI List of Pertinent Nondiscrimination Acts and Authorities: During the performance of this Contract, the Contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “Contractor”) agrees to comply with the following nondiscrimination statutes and authorities; including but not limited to:
        1. Title VI of the Civil Rights Act of 1964 (42 USC § 2000d et seq., 78 stat. 252) (prohibits discrimination on the basis of race, color, national origin);
        2. 49 CFR part 21 (Nondiscrimination in Federally-Assisted programs of the Department of Transportation—Effectuation of Title VI of the Civil Rights Act of 1964) including amendments thereto;
        3. The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 USC § 4601) (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects);
        4. Section 504 of the Rehabilitation Act of 1973 (29 USC § 794 et seq.), as amended (prohibits discrimination on the basis of disability); and 49 CFR part 27 (Nondiscrimination on the Basis of Disability in Programs or Activities Receiving Federal Financial Assistance);
        5. The Age Discrimination Act of 1975, as amended (42 USC § 6101 et seq.) (prohibits discrimination on the basis of age);
        6. Airport and Airway Improvement Act of 1982 (49 USC § 47123), as amended (prohibits discrimination based on race, creed, color, national origin, or sex);
        7. The Civil Rights Restoration Act of 1987 (PL 100-259) (broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, the Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not);
        8. Titles II and III of the Americans with Disabilities Act of 1990 (42 USC § 12101, et seq), (prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities) as implemented by U.S. Department of Transportation regulations at 49 CFR parts 37 and 38;
        9. Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 USC § 1681, et seq).
        10. Contractor is required to insert the above Title VI List of Pertinent Nondiscrimination Acts and Authorities into every subcontract at any tier.  Upon request by the County, Contractor will provide a copy of each subcontract to demonstrate that the above language has been inserted.
      5. Civil Rights Training: Upon request by the County, Contractor is required to disseminate and provide training materials and other information related to Title VI Civil Rights to its staff as specified by the County.
    • Submission Requirements
      1. Bid Form; (NOTE TO BUYER - This references the old paper form that includes items now within the Vendor Responses & pricing - but not a signature - validate with your CoCo)
      2. List of Subcontractors;
      3. Minimum Experience/Qualification Statement;
      4. Bid Schedule (Pricing in OpenGov);
      5. Company Profile & References
      6. Non-Collusion Affidavit
      7. Iran Contracting Act Certification Form (BUYER - Keep if over $1M)
      8. In-Use Off Road Diesel Fueled Fleets Regulation Form
      9. Campaign Contribution Disclosure Form
      10. Contractor Safety Responsibility Form;

      Note: Electronic Bids cannot be viewed by County until after the solicitation deadline. If you encounter any problems with your registration, system, bid submission, or other system issues, please contact OpenGov’s support staff via the live chat option or via email at procurement-support@opengov.com.

    • OCLSB Preference Policy - Construction:

      For solicitations awarded to the lowest responsive and responsible bidder, a preference of five percent (5%) of the lowest bid will be applied to certified bidders who request the preference pursuant to County policy.

      This preference will be applied to all certified bidders who qualify, including the lowest responsive, responsible bidder. However, the awarded contract price will remain the bidder’s original bid price and not the adjusted price used for evaluation purposes.

      Please note, the total preference applied under this program cannot exceed five percent (5%) of the lowest bid, with a maximum cap of $100,000.

      Eligibility for Contractors Using OCLSB Subcontractors – Prime contractors that do not otherwise meet the OCLSB certification requirements may still qualify for OCLSB preferences by virtue of their use of OCLSB subcontractors. To qualify for the preferences by using certified OCLSB subcontractor(s), twenty percent (20%) of the total proposed contract amount must be allocated to OCLSB subcontractors identified in the List of Subcontractors. (BUYER - Upload list)

    • Communication

      Bidders are not to contact other County personnel with any questions or clarifications concerning this Invitation for Bid (IFB). All questions regarding this solicitation must be submitted via the Question & Answer section of this solicitation within the County’s eProcurement Portal at: https://procurement.opengov.com/portal/ocgov. Any County response relevant to this IFB other than through or approved by County is unauthorized and will be considered invalid.

       

      County's Deputy Procurement Agent, Mauricio Escobar, mauricio.escobar@ocparks.com, will provide all official communication concerning this IFB.

    • Bid Submittal

      This is a fully electronic Invitation for Bid (IFB). Bidders must submit their bid through the County’s online bidding system to be considered responsive. Only electronic bids will be accepted, no exceptions. Once the Bid Due Date and Time has lapsed, bidders, the public and County staff are able to immediately see the results on OpenGov Procurement.

      All bids are due no later than the due date and time specified within this solicitation. Late bids will not be accepted regardless of reason.

      No person, firm or corporation shall be allowed to make or file or be interested in more than one bid, for the Job Order Contract. A person, firm or corporation who has submitted a sub-bid to a Bidder, or who has quoted prices on materials to a Bidder, is not hereby disqualified from submitting a sub-bid or quoting prices to other Bidders.

      Bidders shall take all responsibility for any errors or omissions in their bids. Any discrepancies in numbers or calculations shall be interpreted to reflect the lowest price to the County.

      The County shall not be liable for any expenses incurred by potential Bidders in the preparation or submission of their bids. Pre-contractual expenses are not to be included in the Contractor’s Pricing Sheet. Pre-contractual expenses are defined as, including but not limited to, expenses incurred by Bidder in:

      1. Preparing its bid in response to this IFB;
      2. Submitting that bid to the County;
      3. Negotiating with the County any matter related to the bid; and,
      4. Any other expenses incurred by the Bidder prior to the date of the award and execution, if any, of the Contract.
    • Pricing
      1. Bid Prices:  The bid prices quoted on this solicitation shall be firm for the entire contract term of the awarded Contract. 
      2. Addenda: Bid prices offered shall reflect all addenda issued by County.
      3. Scope of Work: Bids shall be submitted only for the items and/or services as stated in the Scope of Work, Attachment A of Model Contract; bids for other than the items and/or services listed will not be considered.
      4. Firm Prices: The County will only consider firm price bids.
      5. Profit: The net amount of profit will remain firm for the entire term of the Contract.  Contract adjustments which increase Contractor’s profit will not be allowed.
      6. Price Decreases: All price/rate decreases will automatically be extended to the County.  Please reference Paragraph – Price Increase/Decrease provision for additional information.
      7. Acceptance: Bids must be provided for each item separately, “all-or-none” bids will not be accepted unless in the best interest of the County.
    • Bonds

      Bonds shall be secured from an admitted surety company authorized to conduct surety insurance in California and satisfactory to County Counsel and County Risk Management and in accordance with the General Conditions.

      1. Bid Bond:  Bidder will be required to furnish a bid bond in an amount not less than 10% of the total Contract amount. Original bid security documents shall be received at the following address before 2:00 pm on the bid closing date or submittals shall be deemed non-responsive:

        County of Orange/County Administration South Building
        601 N. Ross St., 4th Floor
        Santa Ana, CA 92701
        Attn: Mauricio Escobar

      2. Labor and Material Payment Bond and a Faithful Performance Bond: The successful Bidder, immediately upon award, will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond in an amount of $TBD. Sample bonds can be found attached to this IFB.
    • OCLSB and DVBE Subcontractor Requirement - Construction:

      This project is estimated to exceed five million dollars ($5,000,000). As a result, at least 3% of the total contract value must be subcontracted to an Orange County Local Small Business (OCLSB) or Disabled Veteran Business Enterprise (DVBE). Under the Public Contract Code, no DVBE preference can be applied to Public Works projects.

      The Bid may be declared non-responsive if the Bidder fails to include at least 3% of the total contract value subcontracted to certified OCLSB or DVBE subcontractors.

    • Bid Validity

      Bids will be valid for a period of 365 days after IFB closing date.

    • Bid Security

      Bidders must provide a ten percent (10%) bid security by certified or cashier’s check from a responsible bank, cash, or an original bidder’s bond issued and executed by an admitted surety insurer authorized to transact surety insurance in California, made payable to the order of the County of Orange in an amount equal to at least ten percent (10%) of the total bid amount, as a guarantee that the Bidder will enter into the proposed Contract if it is awarded to the Bidder.

      In the event the Bidder to which the Contract is awarded fails to provide bonds and insurance and meet other preconditions to the County’s execution of the Contract in a timely manner, the proceeds of the check or cash or the full sum of the Bidder’s bond will be forfeited to the County.

      Original bid security documents shall be received at the following address before 2:00 pm on Friday, July 10, 2026 or submittals shall be deemed non-responsive:

      County of Orange/OC Community Resources
      Attn: Mauricio Escobar
      601 NORTH ROSS ST
      SANTA ANA, CA 92701

    • Substitutions

      Bids offering equivalent items meeting the standards of quality specified in the solicitation may be considered, unless otherwise specified, providing the bid clearly describes the article offered and how it differs from the specified brand.  Unless Bidder specifies otherwise, it is understood that the Bidder is offering the brand item as specified in the solicitation.  If Bidder bids an “equal,” Bidder must state the brand name and must submit complete specifications and/or provide samples with the bid.  Determination of equality shall be at the sole discretion of the County.  If it has been justified and accepted by the requesting agency/department and/or a County standards committee that only one brand can meet the County’s requirements, “no exceptions” shall be noted in the specifications. All requests for substitutions must be submitted within the Question and Answer period and upon approval by the County, the bidder shall include the approved substitution in the Pricing table for the item(s).

    • OCLSB Subcontractor Participation - Construction

      For the purpose of satisfying subcontracting participation requirements and/or being eligible for the preference, only 1st-tier OCLSB subcontractors will be recognized as participants in the Contract according to the following criteria:

      1. For credit to be allowed toward a respective participation level, all listed OCLSB firms shall have been certified by the Bid due date.
      2. The Subcontractor shall perform a commercially useful function for credit to be allowed toward subcontractor participation levels. The Subcontractor shall be required by you to be responsible for the execution of a distinct element of the Work and shall carry out its responsibility by actually performing and supervising its own workforce.
      3. If the Bidder is seeking the recognition of materials, supplies, or both towards achieving any mandatory subcontracting participation level, the Bidder shall indicate on the Subcontractor List with the Bid the following: (BUYER - Upload list)
        1. If the materials or supplies are obtained from a OCLSB manufacturer, the Bidder will receive 100% of the cost of the materials or supplies toward OCLSB participation. For the purposes of counting OCLSB participation, a manufacturer is a firm that operates or maintains a factory or establishment that produces, on the premises, the materials, supplies, articles, or equipment required under the Contract and of the general character described by the specifications.
        2. If the materials or supplies are obtained from a OCLSB supplier, the Bidder will receive 60% of the cost of the materials or supplies toward OCLSB participation. For the purposes of counting OCLSB participation a Supplier is a firm that owns, operates, or maintains a store, warehouse, or other establishment in which the materials, supplies, articles or equipment of the general character described by the specifications and required under the Contract are bought, kept in stock, and regularly sold or leased to the public in the usual course of business. To be a supplier, the firm shall be an established, regular business that engages, as its principal business and under its own name, in the purchase and sale or lease of the products in question. A person may be a supplier in such bulk items as petroleum products, steel, cement, gravel, stone, or asphalt without owning, operating, or maintaining a place of business if the person both owns and operates distribution equipment for the products. Any supplementing of the suppliers’ own distribution equipment shall be by a long-term lease agreement and shall not be on an ad hoc or contract-by-contract basis.
        3. If the materials or supplies are obtained from an OCLSB, which is neither a manufacturer nor a supplier, the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies, fees or transportation charges for the delivery of materials or supplies required on a job site will be counted toward OCLSB participation, provided the fees are reasonable and not excessive as compared with fees customarily allowed for similar services. No portion of the cost of the materials and supplies themselves will be counted toward OCLSB participation.
      4. If the Bidder is seeking the recognition of OCLSB Trucking towards achieving any mandatory subcontracting participation level, the Bidder shall indicate it on the List of Subcontractors with the Bid. The following factors will be evaluated in determining the credit to be allowed toward the respective participation level:
        1. The OCLSB shall be responsible for the management and supervision of the entire trucking operation for which it is getting credit on a particular Contract and there shall not be a contrived arrangement for the purpose of counting OCLSB participation.
        2. The OCLSB shall itself own and operate at least 1 fully licensed, insured, and operational truck used on the Contract.
        3. The OCLSB receives credit for the total value of the transportation services it provides on the Contract using trucks it owns, insures, and operates using drivers it employs.
        4. The OCLSB may lease trucks from another OCLSB firm including an owner-operator who is certified as an OCLSB. The OCLSB who leases trucks from another OCLSB receives credit for the total value of the transportation services the lessee OCLSB provides on the contract.
        5. The OCLSB may also lease trucks from a non-OCLSB firm, including an owner-operator. The OCLSB who leases trucks from a non-OCLSB is entitled to credit for the total value of transportation services provided by non-OCLSB lessees not to exceed the value of transportation services provided by OCLSB owned trucks on the contract. Additional participation by non-OCLSB lessees receive credit only for the fee or commission it receives as a result of the lease arrangement.
        6. A lease shall indicate that the OCLSB has exclusive use of and control over the truck. This does not preclude the leased truck from working for others during the term of the lease with the consent of the OCLSB so long as the lease gives the OCLSB absolute priority for use of the leased truck.
    • No Substitutions

      The bidder is required to meet all specifications and requirements contained in this solicitation.  No substitutions will be accepted, unless prior County written approval is received.

    • Self Performance Requirements

      The Bidder shall be capable of performing, and shall perform with its own organization, work amounting to at least TBD% of the Base Bid Amount. However, any Bid Item designated as a “Specialty Bid Item” will be excluded from the Base Bid Amount for purposes of this Section only.

    • Contractor’s License

      No bid may be considered from a Bidder who, at the time the bids are opened, is not licensed to perform the project in accordance with Division 3, Chapter 9, of the Business and Professions Code of the State of California (see California Business and Professions Code, Section 7000, et seq). However, if federal funds are involved, the Bidder must be properly licensed at the time of award (Public Contract Code 20103.5).

      Bidders shall be required to meet any other legal, license or certificate requirements that are necessary to enable them to perform the services specified in this solicitation.

    • Web Content Accessibility Guidelines (WCAG) 2.1, Level AA

      The County of Orange integrates VPAT review into its IT procurement process to ensure that all acquired products and services are accessible to individuals with disabilities. By adhering to the Web Content Accessibility Guidelines (WCAG) 2.1, Level AA, the County affirms its commitment to creating a digital environment that is inclusive, user-friendly, and accessible to everyone in the community.

      All third-party suppliers engaged by the County of Orange must ensure that any web content, applications, or digital assets they produce or maintain meet or exceed WCAG 2.1 Level AA standards. These requirements apply to websites, mobile apps, documents (e.g., PDFs, Word, Excel), and multimedia elements (e.g., videos, images, audio). Additional documentation, testing, or remediation commitments may be required as a condition of contract award.

    • License Requirement

      To be eligible for award of this contract, Bidder must possess the following licensing classification(s) from the State of California’s License Board: “TBD

    • Lobbyists

      County of Orange does not require and neither encourages or discourages the use of lobbyists or other consultants for the purpose of securing business.

       

      ORANGE COUNTY BOARD OF SUPERVISORS
      AND COUNTY AGENCY OFFICERS

      Board of Supervisors  

      Janet Nguyen, First District
      Vicente Sarmiento, Second District
      Donald P. Wagner, Third District
      Doug Chaffee, Fourth District
      Katrina Foley, Fifth District

      County Agency Officers

      Claude Parrish, Assessor
      Hugh Nguyen, Clerk-Recorder
      Todd Spitzer, District Attorney-Public Administrator
      Don Barnes, Sheriff-Coroner
      Shari L. Freidenrich, Treasurer-Tax Collector
      Andrew Hamilton, Auditor-Controller

    • Discrepancies

      Bidder shall take all responsibility for any errors or omissions in their bids. Any discrepancies in numbers or calculations shall be interpreted to reflect the lowest price to the County. 

      If prior to contract award, a Bidder discovers a mistake in their bid which renders the Bidder unwilling to perform under any resulting contract, the Bidder must immediately notify the buyer and request to withdraw the bid. It shall be solely within the County's discretion as to whether withdrawal will be permitted. If the solicitation contemplated evaluation and award of "all or none" of the items, then any withdrawal must be for the entire bid. If the solicitation provided for evaluation and award on a line item or combination of items basis, the County may consider permitting withdrawal of specific line item(s) or combination of items.

    • OCLSB Subcontractor Participation Percentage - Construction
      1. The Bidder must achieve the mandatory Subcontractor participation requirement.
      2. The Bidders shall indicate the participation on the List of Subcontractors regardless of the dollar value.
      3. An OCLSB Bidder may count its own participation toward achieving the subcontracting requirement as long as the OCLSB Bidder performs at least 51% of the Contract Price.
    • Bid Expenses

      The County shall not be liable for any expenses incurred by potential Contractors in the preparation or submission of their bids. Pre-contractual expenses are not to be included in the Contractor’s Pricing Sheet. Pre-contractual expenses are defined as, including but not limited to, expenses incurred by Bidder in: 

      1. Preparing its bid in response to this IFB. 
      2. Submitting that bid to the County. 
      3. Negotiating with the County any matter related to the bid; and, 
      4. Any other expenses incurred by the Bidder prior to the date of the award and execution, if any, of the Contract.
    • Acceptance/Rejection/Award
      1. Bids submitted in response to this IFB may become subject to public disclosure. The County shall not be liable in any way for disclosure of any such records. Additionally, all bids shall become the property of the County.  
      2. Bids will be reviewed by the County for responsiveness to all requirements. The County has the right to reject any bid deemed unresponsive or lacking the resources or experience to adequately perform the services described herein, and is therefore not a responsible bidder.
      3. Only those responsible, responsive bids meeting all solicitation requirements and specifications shall be further reviewed for consideration for award. Award shall be based on the lowest, responsive, responsible bid.
        Please take notice, non-acceptance of County of Orange terms and conditions will result in a bid being deemed non-responsive. The County will not accept any other terms, conditions, or provisions contrary to those contained within this solicitation.
      4. Final award determination based upon the lowest responsive, responsible bid, may also include a review of successful Bidder’s qualifications, experience, and resources; Bidder’s ability to meet the requirements and perform the services specified in this solicitation; Bidder’s references and past performance; and Bidder’s acceptance of County of Orange terms and conditions.
      5. Awarded Contractor will be required to sign a Contract upon award. If Contractor is a corporation, signature will be provided in accordance with the corporation’s code as specified in this solicitation.
    • Labor Code Notice

      All contractors and subcontractors must comply with the requirements of Labor Code Section 1771.1(a), pertaining to registration of contractors pursuant to Section 1725.5. Bids cannot be accepted from unregistered contractors except as provided in Section 1771.1. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. After award of the Contract, successful Bidder (Contractor) and each Subcontractor shall furnish electronic payroll records directly to the Labor Commissioner in the manner specified in Labor Code Section 1771.4.

    • OCLSB Maintaining Participation Levels - Construction
      1. Credit and preference points are earned based on the level of participation proposed prior to the award of the Contract. Once the Project begins, Contractor shall achieve and maintain the OCLSB and/or DVBE participation levels for which credit and preference points were earned. Contractor shall maintain the OCLSB and/or DVBE percentages indicated at the Contract Award and throughout the Contract Time.
      2. If the County modifies the original Scope of Work, the Contractor shall make reasonable efforts to maintain the OCLSB and/or DVBE participation for which creditor preference points were earned. If participation levels will be reduced, written approval shall be received from the County prior to making changes.
      3. The Contractor shall notify and obtain written approval from the County in advance of any reduction in subcontract scope, termination, or substitution for a designated OCLSB and/or DVBE Subcontractor. Failure to do so shall constitute a material breach of the Contract.
    • Listing of Subcontractors

      Pursuant to the provisions of California Public Contract Code Sections 4100 through 4113, all Bidders shall state in their Bids:

      1. The name, location of the place of business, and California contractor license number of each subcontractor who will perform work or labor or render service to the successful Bidder, or who will specially fabricate and install a portion of the work according to detailed drawings contained in the Plans and Special Provisions in an amount in excess of one-half of one percent of the Bidder's total Bid.
      2. The work, trade, service, or portion of the work that will be performed by each such Subcontractor.

      If the Bidder fails to specify a subcontractor for any portion of the work to be performed under the Contract in excess of one-half of one percent of the Bidder's total Bid, the Bidder agrees to perform that portion with its own organization.

      The successful Bidder shall not, without the consent of County, either:

      1. Substitute any person, firm, or corporation as subcontractor in place of the Subcontractor designated in the original Bid; or
      2. Permit any subcontract to be assigned or transferred or allow it to be performed by anyone other than the original Subcontractor listed in the Bid.

      In the event that the Bid Form calls for alternates and Bidder intends to use different or additional subcontractors on the alternates, Bidder shall complete additional forms for each alternate listing the subcontractor(s) for such alternate.

    • OCLSB Subcontractor and Supplier Substitutions - Construction

      Listed Subcontractors and Suppliers shall not be substituted without the written authorization of the County or its duly authorized agent.

      Request for Subcontractor or Supplier substitution shall be made in writing to:

      County of Orange/Department Name
      Attn: Contact Full Name, Title
      Contact Address
      Email: Contact Email Address

      The request shall include a thorough explanation of the reason(s) for the substitution, including dollar amounts and a letter from each substituted Subcontractor or Supplier stating that they (the Subcontractors or Suppliers) release all interest in working on the Project and written confirmation from the new Subcontractor or Supplier stating that they agree to work on the Project along with the dollar value of the Work to be performed.

      Written approval of the substitution request shall be received from the County or its authorized officer prior to any unlisted Subcontractor or Supplier performing Work on the Project. Substitution of Subcontractors and Suppliers without authorization shall subject you to those penalties set forth in Public Contract Code §4110.

      Requests for Supplier substitution shall be made in writing at least ten (10) Days prior to the provision of materials, supplies, or services by the proposed Supplier and shall include proof of written notice to the originally listed Supplier of the proposed substitution.

      A Contractor whose Bid is accepted shall not:

      1. Substitute a person as Subcontractor or Supplier in place of the Subcontractor or Supplier listed in the original bid, except that the County, or it’s duly authorized officer, may consent to the substitution of another person as a Subcontractor or Supplier in any of the following situations:
        1. When the Subcontractor or Supplier listed in the Bid, after having a reasonable opportunity to do so, fails or refuses to execute a written Contract for the scope of work specified in the subcontractor’s bid and at the price specified in the subcontractor’s bid, when that written contract, based upon the general terms, conditions, plans, and specifications for the project involved or the terms of the subcontractor’s written bid, is presented to the subcontractor by the prime contractor.
        2. When the listed Subcontractor or Supplier becomes insolvent or the subject of an order for relief in bankruptcy.
        3. When the listed Subcontractor or Supplier fails or refuses to perform his or her subcontract.
        4. When the listed Subcontractor fails or refuses to meet bond requirements as set forth in Public Contract Code §4108.
        5. When you demonstrate to the County or it’s duly authorized officer, subject to the provisions set forth in Public Contract Code §4107.5, that the name of the Subcontractor was listed as the result of an inadvertent clerical error.
        6. When the listed Subcontractor is not licensed pursuant to Contractor License Law.
        7. When the County, or it’s duly authorized officer, determines that the Work performed by the listed Subcontractor or that the materials or supplies provided by the listed Supplier are substantially unsatisfactory and not in substantial accordance with the Plans and specifications or that the Subcontractor or Supplier is substantially delaying or disrupting the progress of the Work.
        8. When the listed Subcontractor is ineligible to work on a public works project pursuant to §§1777.1 or 1777.7 of the Labor Code.
        9. When the County or its duly authorized agent determines that the listed Subcontractor is not a responsible contractor.
      2. Permit a Contract to be voluntarily assigned or transferred or allow it to be performed by anyone other than the original Subcontractor, Supplier listed in the original Bid without the consent of the County, or it’s duly authorized officer.
      3. Other than in the performance of “Change Orders” causing changes or deviations from the Contract, sublet or subcontract any portion of the Work, or contract for materials or supplies in excess of 0.5% of your total bid or $10,000, whichever is greater, as to which his or her original Bid did not designate a Subcontractor or Supplier.
    • Award

      Upon recommendation of Contract award, Bidder will be required to submit the following documents within seven (7) days of County notification, unless otherwise specified in the solicitation:

      1. Insurance: Certificate(s) of Insurance, including additional Insured Endorsement(s); refer to Model Contract, Article-Insurance

      2. W-9 Form: Current signed W-9 (Taxpayer ID No & Certification), which includes Contractor’s Legal Business Name(s).  Out of State Vendors are required to submit a 587/590 Form.

    • Rights Reserved to County

      The County reserves the right to:

      1. Waive, at its discretion, any non-material defects, irregularity, or informality, which County deems correctable or otherwise not warranting rejection of the bid that do not result in any unfair competitive advantage.
      2. Verify and validate any information prior to Contract Award and during the entire term of the Contract.
      3. Make multiple awards to Bidders for services requested in this solicitation, at its sole discretion, to serve the best interests of the County.
      4. Accept or reject in whole or in part any or all bids received as a result of this solicitation at its sole discretion and to solicit for new bids, as the best interest of the County may require.
      5. Withdraw or cancel in part or in its entirety this solicitation at any time without prior notice and furthermore makes no representation that any contract will be awarded to any Bidder responding to this solicitation.
      6. Negotiate the final Contract with the lowest, responsive and responsible Bidder or Bidders as necessary to serve the best interests of the County.
    • W-9 Requirements

      Department of the Treasury, Internal Revenue Service Form W-9 Requirement: Effective June 3, 2006, all Contractors, entering into a contract with the County, who are not already established in the County's Financial System as an Auditor-Controller vendor, will be required to submit to the County a federal Form W-9, or form W-8 for foreign vendors.

      In order to comply with this County requirement, within ten days of notification of selection of award of Contract but prior to official award of Contract, the selected Contractor agrees to furnish to the contract administrator, the County Deputy Procurement Agent (DPA), Mauricio Escobar, the required W-9 or W-8.

    • Acceptance/Rejection/Award
      1. Bids submitted in response to this IFB may become subject to public disclosure under the California Public Records Act, and other applicable law. The County shall not be liable in any way for disclosure of any such records. Additionally, all bids shall become the property of the County.  
      2. The lowest responsive, responsible Bidder will be recommended for contract award.
      3. Bids will be reviewed by the County for responsiveness to all requirements.  The County has the right to reject any bid deemed unresponsive or lacking the resources or experience to adequately perform the services described herein.
      4. Only those responsible, responsive bids meeting all solicitation requirements and specifications shall be further reviewed for consideration for award.  Award shall be based on the lowest, responsive, responsible bid.
      5. Please take notice, non-acceptance of the County of Orange terms and conditions, incorporated in model contract, may deem a bid non-responsive.  County may not accept any other terms, conditions, or provisions contrary to those contained within this solicitation.
      6. Final award determination shall be based upon the lowest responsive, responsible bid, and may also include a review of Bidder’s ability to meet the requirements and perform the services specified in this solicitation; Bidder’s references and past performance; and Bidder’s acceptance of County of Orange terms and conditions.  
      7. By submitting a response to this solicitation, Bidders agree to accept the decision of the County DPA as final.
      8. Awarded Bidder will be required to sign a contract upon award.  If Bidder is a corporation, signature will be provided in accordance with the corporation’s code as specified in this solicitation.
    • Maintaining Participation Levels
      1. Credit and preference points are earned based on the level of participation proposed prior to the award of the Contract. Once the Project begins, Contractor shall achieve and maintain the OCLSB and/or DVBE participation levels for which credit and preference points were earned. Contractor shall maintain the OCLSB and/or DVBE percentages indicated at the Contract Award and throughout the Contract Time.

       

      1. If the County modifies the original Scope of Work, the Contractor shall make reasonable efforts to maintain the OCLSB and/or DVBE participation for which creditor preference points were earned. If participation levels will be reduced, written approval shall be received from the County prior to making changes.

       

      1. The Contractor shall notify and obtain written approval from the County in advance of any reduction in subcontract scope, termination, or substitution for a designated OCLSB and/or DVBE Subcontractor. Failure to do so shall constitute a material breach of the Contract.
    • Rights Reserved to County

      The County reserves the right to:

      1. Request a sample for determining equality with the specified brand.
      2. Waive, at its discretion, any non-material defects, irregularity, or informality, which County deems correctable or otherwise not warranting rejection of the bid that do not result in any unfair competitive advantage.
      3. Verify and validate any information prior to Contract Award and during the entire term of the Contract.
      4. Make multiple awards to Bidders for services requested in this solicitation, at its sole discretion, to serve the best interests of the County
      5. Accept or reject in whole or in part any or all bids received as a result of this solicitation at its sole discretion and to solicit for new bids, as the best interest of the County may require.
      6. Negotiate the final Contract with the lowest, responsive and responsible Bidder or Bidders as necessary to serve the best interests of the County.
      7. Withdraw or cancel in part or in its entirety this solicitation at any time without prior notice and furthermore makes no representation that any contract will be awarded to any Bidder responding to this solicitation.
      8. Award its total requirements to one Bidder or to apportion those requirements among two or more Bidders as the County may deem to be in its best interests; therefore, bids must be provided for each item separately; “all-or-none” bids will not be accepted unless in the best interest of the County.
      9. Defer award of this Contract for a period of 180 days after the Bid opening. During this period, Bidders shall guarantee the prices quoted in their Bids. County and the lowest responsive, responsible Bidder may mutually agree in writing to extend this deferral period.
    • Subcontractor and Supplier Substitutions

      Listed Subcontractors and Suppliers shall not be substituted without the written authorization of the County or its duly authorized agent.

      Request for Subcontractor or Supplier substitution shall be made in writing to:

      OC Community Resources – Procurement Services

      Attention Mauricio Escobar

      601 NORTH ROSS ST

      SANTA ANA, CA 92701

      The request shall include a thorough explanation of the reason(s) for the substitution, including dollar amounts and a letter from each substituted Subcontractor or Supplier stating that they (the Subcontractors or Suppliers) release all interest in working on the Project and written confirmation from the new Subcontractor or Supplier stating that they agree to work on the Project along with the dollar value of the Work to be performed.

      Written approval of the substitution request shall be received from the County or its authorized officer prior to any unlisted Subcontractor or Supplier performing Work on the Project. Substitution of Subcontractors and Suppliers without authorization shall subject you to those penalties set forth in Public Contract Code §4110.

      Requests for Supplier substitution shall be made in writing at least ten (10) Days prior to the provision of materials, supplies, or services by the proposed Supplier and shall include proof of written notice to the originally listed Supplier of the proposed substitution.

      A Contractor whose Bid is accepted shall not:

      1. Substitute a person as Subcontractor or Supplier in place of the Subcontractor or Supplier listed in the original bid, except that the County, or it’s duly authorized officer, may consent to the substitution of another person as a Subcontractor or Supplier in any of the following situations:
        1. When the Subcontractor or Supplier listed in the Bid, after having a reasonable opportunity to do so, fails or refuses to execute a written Contract for the scope of work specified in the subcontractor’s bid and at the price specified in the subcontractor’s bid, when that written contract, based upon the general terms, conditions, plans, and specifications for the project involved or the terms of the subcontractor’s written bid, is presented to the subcontractor by the prime contractor.
        2. When the listed Subcontractor or Supplier becomes insolvent or the subject of an order for relief in bankruptcy.
        3. When the listed Subcontractor or Supplier fails or refuses to perform his or her subcontract.
        4. When the listed Subcontractor fails or refuses to meet bond requirements as set forth in Public Contract Code §4108.
        5. When you demonstrate to the County or it’s duly authorized officer, subject to the provisions set forth in Public Contract Code §4107.5, that the name of the Subcontractor was listed as the result of an inadvertent clerical error.
        6. When the listed Subcontractor is not licensed pursuant to Contractor License Law.
        7. When the County, or it’s duly authorized officer, determines that the Work performed by the listed Subcontractor or that the materials or supplies provided by the listed Supplier are substantially unsatisfactory and not in substantial accordance with the Plans and specifications or that the Subcontractor or Supplier is substantially delaying or disrupting the progress of the Work.
        8. When the listed Subcontractor is ineligible to work on a public works project pursuant to §§1777.1 or 1777.7 of the Labor Code.
        9. When the County or its duly authorized agent determines that the listed Subcontractor is not a responsible contractor.
      2. Permit a Contract to be voluntarily assigned or transferred or allow it to be performed by anyone other than the original Subcontractor, Supplier listed in the original Bid without the consent of the County, or it’s duly authorized officer.
      3. Other than in the performance of “Change Orders” causing changes or deviations from the Contract, sublet or subcontract any portion of the Work, or contract for materials or supplies in excess of 0.5% of your total bid or $10,000, whichever is greater, as to which his or her original Bid did not designate a Subcontractor or Supplier. 
    • Joint Bids

      Where two or more Bidders desire to submit a single bid in response to a solicitation, they must do so on a prime/subcontractor basis rather than as a joint venture. The County intends to contract with a single firm or multiple firms, but not with multiple firms doing business as a joint venture.

    • Bidders' Review of Documents and Conditions

      Bidders shall inform themselves fully of the conditions relating to construction and labor under which the work will be performed. Before submitting a Bid, Bidders shall: carefully review the Agreement, General Conditions, Plans, and Special Provisions, and all other Contract Documents; visit the Project site; and attend any mandatory pre-bid site meeting and walkthrough described below. Bidder must be capable of and plan to employ such means and methods as will allow performance of the work in accordance with the Contract Documents, and will not cause any interruption or interference with any other contractor working at the site.

    • Delivery of Bids

      Bids and modifications to the Bids, if any, must be submitted electronically via the OpenGov at County's online bidding system before the time and date set for the electronic Bid submittal in the Notice of Inviting Bids. Only electronic bids will be accepted, no exceptions. Bidders shall use the Pricing section of the electronic submittal to prepare and submit their Base Bid Amounts in response to this solicitation. Submission of the Bid before the time specified above shall be the sole responsibility of the Bidder. Late Bids will not be accepted under any circumstances.

    • Unfair Practices and Other Laws

      Bidder warrants that its bid complies with the Unfair Practices Act (Business and Professions Code Section 17000 et seq.) and all applicable County, State and Federal laws and regulations.

    • Modification After Bid Opening

      A modification received from the lowest responsive, responsible Bidder after Bids have been opened that makes the terms of the Bid more favorable to County may be considered at any time and the Contract may be awarded based on such modification.

    • Independence of Bid

      By submitting a bid, Bidder swears under penalty of perjury that it did not conspire with any other supplier to set prices in violation of anti-trust laws.

    • Withdrawal of Bids

      A Bidder may withdraw their bid at any point prior to the due date and time of bids and any bid not in a "Submitted" status as of the deadline shall not be considered. In order to withdraw their bid, a Bidder must click the "Unsubmit Proposal" button. If a bid is unsubmitted for any reason, it shall not be considered by the County if not resubmitted prior to the due date and time of bids.

    • Americans with Disability Act (ADA)

      To comply with the non-discrimination requirements of the ADA, it is the policy of the County to make every effort to ensure that its programs, activities and services are available to all persons, including persons with disabilities. For persons with a disability needing a reasonable modification to participate in the procurement process, or for persons having questions regarding reasonable modifications for the procurement process, you must contact the buyer listed in the solicitation.

    • Homeless Service System Pillars

      OC Community Resources supports the County's effort to build a responsive System of Care that meets the needs of individuals and families experiencing homelessness by providing access to permanent housing and supportive services.

      The Scope of Work and services outlined are in alignment with the Outreach and Supportive Services Pillar and Housing Pillar from the Commission to End Homelessness Homeless Service System Pillars Report. OC Community Resources and Respondents shall work to implement the principles and commitments of the Outreach and Supportive Services Pillar and the Housing Pillar, as applicable.

      Responent shall upload their completed Homeless Service System Pillars Attestation in the Vendor Responses question.

    • Bidder's Questions, Addenda, and Interpretations of Drawings and Documents

      County has made available the Agreement, General Conditions, Plans, and Special Provisions for this Project. Each Bidder shall review and evaluate those documents, including any documents referenced therein, and request any necessary clarification prior to submission of a Bid. Requests for clarification regarding any part of the Notice Inviting Bids, Instructions to Bidders, or Contract Documents must be submitted via County’s OpenGov Procurement portal. For technical assistance with OpenGov, please contact OpenGov customer support.

      Bidders shall post their questions on the County's OpenGov Procurement portal. All questions and requests for clarification or interpretation must be submitted before 2:00 pm on Friday, June 26, 2026. Questions emailed directly to the County will not be answered. If County considers a clarification or interpretation necessary, County shall issue a written Addendum through its OpenGov Procurement portal ONLY. Such Addenda will be issued no later than TBD days prior to the time and date set for opening of Bids.

      Each Bidder shall ensure that it has received and reviewed any and all Addenda and Notices. County will not be responsible for any answers to questions, explanations, corrections to, or interpretations of the Contract Documents, Notice Inviting Bids, Instructions to Bidders, or other documents unless the answer, explanation, correction, or interpretation is issued through the County's OpenGov Procurement portal.

    • Bonds

      Within 14 calendar days after award of the Contract, the successful Bidder shall furnish a Faithful Performance Bond and a Labor and Material Payment Bond, each in an amount equal to 100% of the Contract Price, issued by a surety in accordance with the requirements of the General Conditions of the Contract. The bonds shall be in the form of the models included in these Bid Documents and must be approved by County’s Risk Manager and County Counsel. The successful Bidder shall submit the bonds in duplicate, all of which shall bear original signatures. The signature of the surety representative must be notarized.

    • Contractor Screening

      Throughout the term of this Contract, Contractor shall not be listed on any state or federal exclusionary rosters, listed below. County may screen Contractor on a monthly basis to ensure Contractor is not listed on the exclusionary rosters, listed below.  If Contractor or its employee(s) are found to be included on any of the rosters indicated below, Contractor shall be deemed in default of its obligation under this Paragraph and shall constitute a cause for County to exercise its right to terminate this Contract immediately.  County, in its sole discretion, may afford Contractor an opportunity to cure said default within a reasonable time.

       

      1. United States Department of Health and Human Services, Office of Inspector General (OIG) List of Excluded Individuals & Entities (LEIE) (http://exclusions.oig.hhs.gov)
      2. General Services Administration (GSA) System for Award Management (SAM) Excluded   Parties List (http://sam.gov)
      3. State of California Department of Health Care Services Medi-Cal Suspended and Ineligible Provider List (County Health Care Agency Internal Database)
    • Safety Data Sheets (SDS)

      The Contractor is required to provide a completed Safety Data Sheet (SDS) for each hazardous substance provided to the County under the Contractor’s Contract with the County. This includes hazardous substances that are not directly included in the Contract, but are included in the goods or services provided by the Contractor to the County. The provision of the SDSs must be in accordance with the requirements of California Labor Code Sections 6380 through 6399, General Industry Safety Order Section 5194, and Title 8, California Code of Regulations. The SDSs for each substance must be sent to the place of shipment or provision of goods/service.

    • Insurance

      Within 7 days after award of the Contract, the successful Bidder shall provide proof that all insurance required by the Contract is in place. County will not issue a Notice to Proceed until County has approved such insurance.

    • Contractor Safety

      Contractor shall comply with the County’s Safety and Loss Prevention Policy and Procedure#306 (“Contractor Safety Responsibilities”) and submit a copy of their Injury and Illness Prevention Program (IIPP) and Contractor Safety-Activity Checklist to the County’s Project Manager prior to the start of any work performed under the Contract. Contractor will notify County Project Manager of any revisions to the Safety-Activity Checklist and will provide a new Safety-Activity Checklist upon County request. The IIPP shall comply with California Code of Regulations, Title 8, Section 1509 or 3203(whichever applies). Contractor shall submit other safety programs that pertain to the type of job that will be performed on site. County reserves the right to conduct inspections and audits as necessary for the purpose of evaluating any aspect of safety performance under this Contract.

    • Execution of the Agreement and Notice to Proceed

      County will not execute the Agreement or issue a Notice to Proceed with the work until Bidder has submitted and County has approved Bidder’s Faithful Performance and Labor and Material Payment Bonds, proof of insurance, and initial job progress schedule. All such submittals must be received by County within 7 calendar days of award of the Contract. Any claims by Contractor for adjustments in time and/or cost for delays in issuing the Notice to Proceed due to Contractor’s failure to deliver bonds, insurance, and initial job progress schedule acceptable to County will not be considered.

    • DUNS Number

      The County requires a valid D-U-N-S number prior to Contract Award. If needed, your company may obtain one at no cost at www.dnb.com. If you are unable to provide/obtain a D-U-N-S number, please indicate so in your bid submission response.

    • No Claim for Costs of Preparing Bids

      County will not be responsible for any expenses incurred by any Bidder in attending Pre-Bid Meetings or in preparing or submitting bids, bid bonds, or any other documents prepared by any Bidder prior to the Award of the Contract.

    • Bidders Interested in More Than One Bid

      No person or entity shall submit or be interested in more than one Bid as prime contractor for the same work. A person or entity who has submitted a subproposal to a Bidder, or who has quoted prices on materials to a Bidder, is not hereby disqualified from submitting a subproposal or quoting prices to other Bidders.

    • Unique Entity Identifier Number (UEI)

      The County requires a valid UEI number prior to Contract Award. If needed, your company may obtain one at no cost at www.usfcr.com. If you are unable to provide/obtain a UEI number, please indicate so in your bid submission response.

    • Non-Collusion Declaration

      Pursuant to Public Contract Code Section 7106, each Bidder must execute the Non-Collusion Declaration contained in the Bid Documents and submit it with the Bid.

      The County may require that the Contractor, before awarding any subcontract, secure Non-Collusion Declarations from proposed Subcontractors.

    • Substitutions

      Bidders shall submit Bids covering the materials, equipment, products, processes, articles, or services as specified in the Contract Documents. County will not consider any request for a substitution prior to the opening of Bids.

    • Contractor's License

      Pursuant to Business & Professions Code Section 7028.15, County will not consider any Bid submitted by a Bidder that does not hold a valid contractor’s license at the time of submitting its Bid. This requirement is not a mere formality, and it will not be waived by the Board of Supervisors. The classification of contractor's license required for the performance of this Contract is specified in the Notice Inviting Bids.

    • Contractor's License

      Pursuant to Business & Professions Code Section 7028.15, a Bidder that does not hold a valid contractor’s license by the time of scheduled public meeting of Board of Supervisors for consideration of award this project shall not be considered or awarded. This requirement is not a mere formality, and it will not be waived by the Board of Supervisors. The classification of contractor's license required for the performance of this Contract is specified in the Notice Inviting Bids.

    • Compliance with Laws and Regulations

      Contractor represents and warrants that services to be provided under this Contract shall fully comply, at Contractor’s expense, with all standards, laws, statutes, restrictions, ordinances, requirements, and regulations (collectively “laws”), including, but not limited to those issued by County in its governmental capacity and all other laws applicable to the services at the time services are provided to and accepted by County. Contractor acknowledges that County is relying on Contractor to ensure such compliance, and pursuant to the requirements of the Insurance and Indemnification section, Contractor agrees that it shall defend, indemnify and hold County and County Indemnitees harmless from all liability, damages, costs and expenses arising from or related to a violation of such laws.

      Contractor shall remain in compliance and in good standing, maintaining current and active business entity and/or nonprofit registration status, with all applicable federal, state and local registration requirements at the time of execution of the contract through the duration of the term of the Contract, and shall provide annual confirmation of current and active status to County through the term of the Contract.

    • Time is of the Essence

      Time is of the essence to the contract.  Contractor shall complete the project within the contract time as defined in the “contract price and time” section of the agreement.  Failure to meet this requirement will subject contractor to liability for liquidated damages pursuant to the “liquidated damages” section of the agreement.

    • Allowances

      Allowances, where included, are listed in the Bid as lump-sum estimates. The tasks, conditions, standards, and schedules for performance of Allowances shall be subject to prior written approval of County.  Payment for Allowances shall be in accordance with the “Allowances” subsection of the “Payments” Section of the General Conditions. Any costs exceeding the maximum amount of any Allowance shall be addressed in accordance with the “Changes” Section of the General Conditions.  Upon completion of the Project, each Allowance estimate will be corrected for unused balances by Change Order to reflect the actual amount authorized for that Allowance.

    • Levine Act Requirements

      Effective January 1, 2023, Government Code Section 84308, otherwise known as the “Levine Act,” became applicable to members of the Board and other County officials. In order to comply with this requirement, Bidder shall furnish the required Campaign Contribution Disclosure Information form as a required submittal with its Proposal. Failure to include the form as required will render the bid nonresponsive.

    • Pre-Bid Meeting and Site Visit

      County may hold a pre-bid meeting and site visit. If this meeting is mandatory, each Bidder shall familiarize itself with the Project site.

      A NO VALUE pre-bid meeting and site visit will be held on NO VALUE at NO VALUE. The meeting place will be at NO VALUE, sign-in will be available.

      Failure of any Bidder to attend a mandatory pre-bid meeting and site visit shall constitute a substantial variation from the requirements of the Contract Documents and the Bid of any Bidder not in attendance will be rejected as nonresponsive. If you have any questions regarding the pre-bid meeting and site visit, please contact County’s representative, Mauricio Escobar at (949) 923-3725.

    • Pre-Bid Meeting and Site Visit

      There will be no pre-bid meeting and/or site visit for this solicitation.

    • Award or Rejection of Bids

      The award of the Contract, if it is awarded, will be to the lowest responsive and responsible Bidder complying with these Instructions and the Notice Inviting Bids.

      County’s determination of the lowest Bid price shall be the lowest Base Bid Amount without consideration of the prices on any Additive or Deductive items. However, Deletable Bid Items will be considered as part of the Base Bid Amount.

      The Bidder shall submit its Bid on a lump sum and/or unit price basis as set forth in the pre-printed Bid Form. Quantities and prices represented on the Bid Schedule are used for bidding purposes.  The approved Schedule of Values shall be the basis for all of Contractor’s payment requests and invoices .

      Bids shall include all costs necessary to comply with the requirements of the Contract Documents. Bids premised on other bases will not be considered. Bids that do not reference all Addenda or that are not submitted on the prescribed forms and that provide all required information may be rejected as non-responsive.

      Bids in which the total cost for an individual Bid Item does not correspond to the quoted unit price may be rejected as non-responsive.  In any conflict between the unit price and the total cost calculated for an individual item, the unit price shall prevail.

      A responsive Bidder shall mean a Bidder who has submitted a Bid which conforms, in all material respects, to the Bid Documents.

      A responsible Bidder shall mean a Bidder who has demonstrated the attribute of trustworthiness, as well as the quality, fitness, capacity, and experience to satisfactorily perform the Contract. In determining responsibility, County may consider any or all of the following criteria, among others:

      1. The ability, capacity, and skill of the Bidder to perform the work or provide the service required by the Contract.
      2. Whether the Bidder can perform the Contract promptly, and within the time specified, without delay or interference.
      3. The character, integrity, reputation, judgment, experience, and efficiency of the Bidder.
      4. The quality of Bidder’s performance of previous contracts.
      5. Bids will only be considered from Pre-Qualified Bidders. (BUYER remove if this solicitation does not require Pre-Qualification)

      If County accepts this Bid and the Bidder fails to submit acceptable bonds, insurance, initial job progress schedule, and any other documents required by the Instructions to Bidders or Contract Documents prior to execution of the Contract, or if such Bidder fails to execute the Agreement within the timeframes specified therein, County may, at its option, determine that the Bidder has abandoned the Contract. Upon such determination, the Bidder shall forfeit any security accompanying this Bid, and said security shall become the property of County, and County may proceed to award the Contract to the next lowest responsive, responsible Bidder.

    • Rights Reserved to County

      The County reserves the right to:

      1. Waive, at its discretion, any non-material defects, irregularity, or informality, which County deems correctable or otherwise not warranting rejection of the bid that do not result in any unfair competitive advantage.
      2. Verify and validate any information prior to Contract Award and during the entire term of the Contract.
      3. Make multiple awards to Bidders for services requested in this solicitation, at its sole discretion, to serve the best interests of the County.
      4. Accept or reject in whole or in part any or all bids received as a result of this solicitation at its sole discretion and to solicit for new bids, as the best interest of the County may require.
      5. Withdraw or cancel in part or in its entirety this solicitation at any time without prior notice and furthermore makes no representation that any contract will be awarded to any Bidder responding to this solicitation.
      6. Negotiate the final Contract with the lowest, responsive and responsible Bidder or Bidders as necessary to serve the best interests of the County.
      7. Award its total requirements to one Bidder or to apportion those requirements among two or more Bidders as the County may deem to be in its best interests; therefore, bids must be provided for each item separately; “all-or-none” bids will not be accepted unless in the best interest of the County.
      8. Review and approve the Contractor’s Schedule of Values in accordance with the “Project Schedule and Schedule of Values” Section of the General Conditions, however, notwithstanding acceptance of this Bid.
      9. Include or exclude from the Project, at any time prior to completion of the work, any Additive, Deductive, or Deletable Bid Items. Payment shall be adjusted in accordance with the unit cost for each item as set forth in the Bid. Contractor shall not be entitled to any adjustment of unit costs set forth in its Bid for any Additive, Deductive, or Deletable Bid Items even if those items are added, deducted, or deleted after award of the Contract.
      10. Defer award of this Contract for a period of 180 days after the Bid opening. During this period, Bidders shall guarantee the prices quoted in their Bids. County and the lowest responsive, responsible Bidder may mutually agree in writing to extend this deferral period.

    Submission Requirements

    • Bid Validity: (required)

      Bids will be valid for a period of 365 days after the solicitation closing date.

    • License and User Agreement (required)

      This Click-Through Agreement (the “Agreement”) contains the terms and conditions upon which The Gordian Group, Inc., a Georgia corporation (“Gordian”) grants to you (“Licensee”) a limited license to perform your obligations pursuant to the Client Contract (as defined below). Please read this Agreement carefully. By clicking “I Accept”, you acknowledge that you have read and accept the terms and conditions of this Agreement in its entirety.

      IF YOU ARE ENTERING INTO THIS AGREEMENT WITHIN THE SCOPE OF YOUR EMPLOYMENT OR IN CONNECTION WITH YOUR ENGAGEMENT AS AN INDEPENDENT CONTRACTOR, THEN THE TERM “LICENSEE” INCLUDES YOUR EMPLOYER OR PRINCIPAL CONTRACTOR, AS APPLICABLE, AND YOU WARRANT AND REPRESENT TO GORDIAN THAT YOU ARE AUTHORIZED TO ACCEPT THIS AGREEMENT ON SUCH EMPLOYER’S OR PRINCIPAL CONTRACTOR’S BEHALF.

      WHEREAS, pursuant to the terms and conditions of a contract between Gordian and one or more mutual clients of Gordian and Licensee that has contracted with Licensee for construction services (“Client Contract”), Gordian has agreed to provide Licensee with a limited license to Gordian’s Job Order Contracting system (“JOC System”), and

      NOW, THEREFORE, Gordian and Licensee agree to the terms and conditions of the following:

      Gordian hereby grants to Licensee, and Licensee hereby accepts from Gordian for the term of the Client Contract, a non-exclusive and nontransferable right, privilege, and license to Gordian’s proprietary JOC System and other related proprietary materials (collectively referred to as “Proprietary Information”) to be used for the sole purpose of executing the Licensee’s responsibilities under the Client Contract for which Licensee is utilizing the JOC system (“Limited Purpose”). Licensee hereby agrees that the Proprietary Information shall include, but is not limited to, Gordian’s eGordian® JOC information management applications and support documentation, Construction Task Catalog® and any construction cost data and copyrighted materials contained therein, training materials, and any other proprietary materials provided to Licensee by Gordian either electronically or through an alternative means of delivery. In the event the applicable Client Contract expires or terminates, this JOC System License shall terminate and Licensee shall return all Proprietary Information in its possession to Gordian.

      Licensee acknowledges that Gordian shall retain exclusive ownership of all proprietary rights to the Proprietary Information, including all U.S. and international intellectual property and other rights such as patents, trademarks, copyrights and trade secrets. Licensee shall have no right or interest in any portion of the Proprietary Information except the right to use the Proprietary Information for the Limited Purpose set forth herein.    Except in furtherance of the Limited Purpose, Contractor shall not distribute, disclose, copy, reproduce, display, publish, transmit, assign, sublicense, transfer, provide access to, use or sell, directly or indirectly (including in electronic form), any portion of the Proprietary Information.

      Licensee hereby agrees to pay Gordian a license fee of 1% of the value of work procured from Licensee by Client (“Contractor License Fee”) pursuant to the Client Contract. Licensee further agrees to remit the Contractor License Fee to Gordian within ten (10) days of Licensee’s receipt of a Job Order, Purchase Order or other similar purchasing document pursuant to the Licensee Contract. Licensee shall make payments payable to The Gordian Group, Inc. and shall mail the payments to P.O. Box 751959, Charlotte, NC 28275-1959. All payments received after the due date set forth above will incur a late payment charge from such due date until paid at a rate of 1.5% per month.

      Either party may terminate this Agreement in the event of: (1) any breach of a material term of this Agreement by the other party which is not remedied within ten (10) days after written notice to the breaching party; or (2) the other party’s making an assignment for the benefit of its creditors, or the filing by or against such party of a petition under any bankruptcy or insolvency law, which is not discharged within thirty (30) days of such filing.

      Licensee acknowledges and agrees to respect the copyrights, trademarks, trade secrets, and other proprietary rights of Gordian in the Proprietary Information during and after the term of this Agreement, and shall at all times maintain complete confidentiality with regard to the Proprietary Information provided to Licensee, subject to federal, state and local laws related to public disclosure. Licensee further acknowledges that a breach of any of the terms of this Agreement by Licensee will result in irreparable harm to Gordian for which monetary damages would be an inadequate remedy, and Gordian shall be entitled to injunctive relief (without the necessity of posting a bond) as well as all other monetary remedies available at law or in equity. In the event that it becomes necessary for either party to enforce the provisions of this Agreement or to obtain redress for the breach or violation of any of its provisions, including nonpayment of any Contractor License Fees owed, whether by litigation, arbitration or other proceedings, the prevailing party shall be entitled to recover from the other party all costs and expenses associated with such proceedings, including reasonable attorney’s fees.

      This Agreement shall be construed under the laws of the State of South Carolina without regard to choice of law principles. Both parties irrevocably consent to the jurisdiction and venue of the federal and state courts located in the State of South Carolina for purposes of any action brought in connection with this Agreement or use of the Proprietary Information.

      The parties agree that in the event of a conflict in terms and conditions between this Agreement and any other terms and conditions of the Client Contract, or any Job Order, Purchase Order or similar purchasing document issued to Licensee as it relates to the terms set forth herein, this Agreement shall take precedence.

    • Contractor Information
    • Proof of Contractor Licenses: C-12 and C-8 (required)

      Upload proof of current California licenses required to perform work within the stated scope, including Class 12 Earthwork and Paving Contractor and Class-8 Concrete Contractor.  

    • Name of Bidder (required)

      Please state the Name of Bidder here.

      If Bidder is a corporation, the legal name of the corporation shall be set forth in this section as the Name of Bidder and the name, title, and person authorized to sign contracts on behalf of the corporation shall be stated as well.

      If Bidder is a partnership or joint venture, the true name of the firm shall be set forth as the Name of Bidder and the name of the partner authorized to sign contracts on behalf of the partnership or joint venture shall be stated as well.

      If submittal of this bid or signature of any document submitted with this bid is by an agent other than an officer of a corporation or a member of a partnership, a Power of Attorney must be on file with County prior to Bid opening, or must be submitted with the Bid; otherwise, the Bid may be rejected as non-responsive. You may upload this power of attorney under Additional Information later in this bid response.

    • Bid Guaranty - Bid Bond? (required)

      Is your Bid Guaranty in the form of a Bidder's Bond with a total of at least 10% of the Base Bid Amount?

      If your Bid Guaranty is in the form of cash, a cashier's check, or a certified check then please select "No" here.

    • Bid Bond

      Please upload a scan of your completed Bid Bond (and all applicable paperwork) here.

    • Bidder Security - Other (required)

      Please upload a statement stating the type of bid security used and the date on which it was submitted to the County.

      NOTE: Chosen form of Original Bid Guaranty must be received by the County prior to the due date and time of this Bid or a Bid shall be deemed non-responsive.

    • Contractor's License Number (required)

      Please enter your Contractor's License Number as issued by the Contractor's State License Board.

    • Contractor's Public Works Registration (DIR) Number (required)

      Please enter your DIR (Department of Industrial Relations) Public Works Registration Number.

    • Joint Venture? (required)

      Are you (Bidder) operating as a Joint Venture?

      If Bidder is a joint venture, then in accordance with Business & Professions Code Section 7029, every member of the joint venture shall be listed with its license information.

    • Joint Venture Members License Information (required)

      Please provide the names of all members of your joint venture along with their contractor's license number and public works registration number.

    • Company Profile & References
    • Company Legal Name (required)
    • Company Legal Status (required)

      Please state the status here (Corporation, Partnership, Sole Proprietor, etc.)

    • SAM.gov Confirmation (required)

      Please upload a printout from SAM.gov to confirm that your company currently has no active exclusions. The printout must be no greater than seven (7) calendar days prior to the due date of this bid.

    • Unique Entity Identifier Number (UEI) (required)

      The County requires a valid UEI number with active registration status.  Your company may obtain one at no cost at https://sam.gov/entity-registration. 

    • California Secretary of State registration - active and in good standing (required)

      Please upload your active certificate from the California Secretary of State.

      CA Sec. of State Verification Link = https://bizfileonline.sos.ca.gov/search/business

    • D-U-N-S Number (required)

      Please provide your company's DUNS number. 

      The County requires a valid D-U-N-S number prior to Contract Award. If needed, your company may obtain one at no cost at www.dnb.com.  If you are unable to provide/obtain a D-U-N-S number, please indicate so in lieu of the number.

    • Federal Taxpayer ID Number (required)
    • California Department of Justice, Office of Attorney General active registration (required)

      For Non-Profit and/or Charitable organizations, please provide your active (registration status is current).  All others enter N/A.

      • RCT Registration Number
      • Renewal/Expiration Date

      DOJ Verification Link - https://rct.doj.ca.gov/Verification/Web/Search.aspx?facility=Y

    • Active Licenses (required)

      Please state all active licenses issued by the California State Contractor's License Board to the company whose legal name is above.

    • Corporate Office Address (required)

      What is the address of the company's corporate office? Please provide the full street/mailing address.

    • Local Business Address(es) (required)

      Please provide the local business address for the company named above. If there are multiple local addresses then please provide all.

      • Full address: 
      • Telephone Number: 
      • E-mail Address: 
    • Length of Time Firm Has Been In Business (required)

      Please clearly state, in months and years, how long your firm has been in business.

    • Length of Time At Current Location (required)

      Please clearly state, in months and years, how long your firm has been in business at its current location.

    • Regular Business Hours (required)
    • Regular Holidays and Hours When Business Is Closed (required)
    • Corporation? (required)

      Is your firm incorporated?

    • State of Incorporation? (required)

      You have indicated that your firm is incorporated. Please provide the name of the State of Incorporation.

    • Contract Signature Authority - Executive Signature (required)

      If incorporated, please provide the name, contact number, and email of the person who would provide this signature authority.  The Executive Signer Authority comes from the President, Vice-President, or Chairperson of the Board.

      • Contact Full Name:
      • Contact Number:
      • E-mail Address:
    • Contract Signature Authority - Financial Signature (required)

      If incorporated, please provide the name, contact number, and email of the person who would provide this signature authority.  The Financial Signer Authority comes from the Secretary, Assistant Secretary, Chief Financial Officer, or Treasurer.

      • Contact Full Name:
      • Contact Number:
      • E-mail Address:
    • Contract Signature Authority (required)

      If not incorporated, please provide the name, contact number, and email of the person who has the binding and signature authority of this contract.

      • Contact Full Name:
      • Contact Title:
      • Contact Number:
      • E-mail Address:
    • Sole Proprietor Under Different Name? (required)

      Is your firm a sole proprietor doing business under a different name?

    • Sole Proprietor's Name (required)

      You have indicated that your firm is a sole proprietorship doing business under a different name.

      Please provide the sole proprietor's name and the name you are doing business under.

    • Contact Person for Solicitation (required)

      Please provide the following in relation to the point of contact for this solicitation:

      • Contact Person Full Name
      • Contact Person Telephone Number
      • Contact Person Email Address
    • Project Manager (required)

      Please provide the following regarding who will be your project manager for this project:

      • Project Manager Full Name
      • Project Manager Telephone Number
      • Project Manager Email Address
    • Contact Person for Accounting (required)

      Please provide the following in relation to the point of contact for Accounting:

      • Contact Person Full Name
      • Contact Person Telephone Number
      • Contact Person Email Address
    • Emergency Contact (required)

      In the event of an emergency of declared disaster, the following is required:

      • Contact Person Full Name (during non-business hours)
      • Contact Person Telephone/Cellphone Number
      • Contact Person Email Address
    • Orange County Projects (required)

      What is the number of projects that the Prime Contractor has completed in Orange County?

    • References (required)

      Do you have letters from at least three references (not including County of Orange References) that include:

      • Reference Names
      • Addresses of site where work was performed
      • Contact Name
      • Telephone Number of Contact
      • Contact Email Address
      • Contract Effective Dates
      • Contract Amount
      • Brief Contract Descriptions

      If you do not have letters you will be able to provide the same information electronically in the next question by answering "No" here.

    • References - Letters (required)

      Please upload your letters from at least three references (not including County of Orange References) that include:

      • Reference Names
      • Addresses of site where work was performed
      • Contact Name
      • Contact Email Address
      • Telephone Number of Contact
      • Contract Effective Dates
      • Contract Amount
      • Brief Contract Descriptions
    • References - Information (required)

      Please provide the following information regarding at least three references (not including County of Orange References):

      • Reference Names
      • Addresses of site where work was performed
      • Contact Name
      • Telephone Number of Contact
      • Contact Email Address
      • Contract Effective Dates
      • Contract Amount
      • Brief Contract Descriptions

      The references will be contacted for verification, and these contacts must be current and able to respond promptly.

    • Bidder Certification
    • Conflict of Interest (required)

      Bidder must certify either Yes or No below:

      Bidder certifies current/past financial, business or other relationship(s) with the County exist/existed as follows:

      1.  (Yes) Disclose any financial, business or other relationship with the County of Orange, any other entity that the Orange County Board of Supervisors governs*, or any Orange County Board member, officer or employee, which could affect or influence award of the contract for the services you propose to provide.
      2. (No) Bidder certifies that no relationships exist/existed as outlined in item I above.

      *Orange County Board of Supervisors govern: All Assessment Districts, All Community Facilities Districts, All Reassessment Districts, Housing and Community Development Commission, Housing Successor Agency to the Orange County Development Agency, In-Home Supportive Services Public Authority, Industrial Development Authority For Orange County, Local Redevelopment Authority Marine Corp Air Station (MCAS) El Toro, Orange County Financing Authority, Orange County Flood Control District, Orange County Housing Authority, Orange County Housing Authority Acting As the Housing Successor Agency, Orange County Public Financing Authority, Orange County Special Financing Authority, South Orange County Public Financing Authority, and the Successor Agency to the Orange County Development Agency

    • Disclose any financial, business or other relationship with the County of Orange, any other entity that the Orange County Board of Supervisors governs*, or any Orange County Board member, officer or employee, which could affect or influence award of the contract for the services you propose to provide. (required)
    • Litigation (required)

      Bidder must certify either Yes or No below:

      Bidder certifies current/past litigation as follows:

      1. (Yes) Bidder shall provide detailed information regarding litigation (court and case number), liens, or claims involving Bidder, or any company that holds a controlling interest in Bidder, against the County of Orange in the past seven (7) years.
      2. (No) Bidder certifies that Bidder or any proposed subcontractors do not have any past or current litigation. 
    • Bidder shall provide detailed information regarding litigation (court and case number), liens, or claims involving any proposed subcontractors, or any company that holds a controlling interest in subcontractor firm(s), against the County of Orange in the past seven (7) years. (required)
    • Name/Ownership Changes: (required)

      Respondent must certify either Yes or No below:

      1. (Yes) Respondent certifies past company name changes and/or ownership changes, for Respondent’s firm and any proposed subcontractor firm, as follows:

        1. Respondent shall provide detailed information regarding any company name changes (including legal business names) in the past seven (7) years.

      1. (No) Respondent certifies that Respondent or any proposed subcontractors have not had any company name change or ownership changes in the past seven (7) years.

    • Bidder shall provide detailed information regarding any company ownership changes (including legal business names) in the past seven (7) years.  (required)
    • Is your firm a County Of Orange Local Small Business (OCLSB) or a Disabled Veteran Business Enterprise (DVBE)? (required)

      To participate as an OCLSB and/or DVBE, the requirements in the OCLSB AND DVBE PREFERENCE POLICIES CERTIFICATION REQUIREMENTS section must be met.

    • County of Orange Local Small Business (OCLSB) and/or Disabled Veteran Business Enterprise (DVBE) Affirmation (required)

      Please download the below documents, complete, and upload.

    • DVBE Certification Number (required)

      To be certified as a Disabled Veteran Business Enterprise by the County of Orange, a business shall meet (1) and (2) below:

      1. Must be certified as a DVBE by the State of California Department of General Services (DGS); and, 
      2. DGS DVBE requirements must be valid at the time of bid/proposal submittal.

      Enter your DVBE Certification Number.  If you do not have it then please state "N/A" here.

    • Proposed Staffing/Key Personnel Plan

      Respondent must complete if claiming County of Orange Local Small Business (OCLSB) and/or Disabled Veteran Business Enterprise (DVBE) preference using sub-contractors. 

      Respondent shall:

      1. Download the below documents, complete, and upload hereinto:
        1. The key personnel information must be sufficient to confirm to the County that the firm has adequate staff and the capability to assist in Services as needed. Provide the names of key staff who may be assigned to Services. Include current resumes detailing their technical expertise, experience directly related to the proposed work (including similar projects), function and responsibility related to the proposed work, qualifications, years of related experience, and length of time with the firm. Additionally, list any licenses and certifications held by these individuals. 
        2. Identify subcontractors (if any) that will be assigned to perform services listed in the Scope of Services.
        3. Identify subcontractor(s) Preference Certification, when applicable.
    • SBA Certification Number (required)

      If you do not have an Small Business Administration (SBA) Certification Number then please state "N/A" here.

    • Will a sub-contractor meet this preference policy certification requirement? (required)
    • Upload the proof of certification for each sub-contractor that meets this preference policy certification requirement?

      Required for projects exceeding $5 million

    • Statement of Compliance (required)
      1. (Yes): Bidder certifies it is in strict compliance with this solicitation, including, but not limited to the terms and conditions set forth in the Model Contract and its Attachments and Exhibits, and no exceptions are proposed. 

      2. (No): Bidder certifies it is in strict compliance with this solicitation, including the terms and conditions set forth in the Model Contract and its Attachments and Exhibits, except for those exceptions expressly listed as required by this IFB and attached hereto.  Attachments for each proposed exception to this IFB, including, but not limited to the Model Contract, must include: 
        1. The complete provision Bidder is taking exception to;
        2. The IFB page number and section of the provision Bidder is taking exception to;
        3. The suggested rewording (i.e., Microsoft Word track changes); 
        4. Reason(s) for submitting the proposed exception; and
        5. Any impact the proposed exception may have on the services to be provided.
    • Provide exceptions to the requirements of this solicitation including the terms and conditions set forth in the Model Contract and its Attachments and Exhibits. (required)
    • Subcontractor Information

      The Bidder shall list below all subcontractor(s) who will perform any portion of the work in excess of 0.5% of the total bid. The Bidder shall state each subcontractor’s name, particular trade or subdivision of the work, license number, and principal location. If the Bidder specifies more than one subcontractor for the same portion of work to be performed, or fails to list a subcontractor for any portion of the work in excess of 0.5% of the total bid, the Bidder represents that he or she is fully qualified to perform that portion himself or herself, and, if awarded the Contract, shall perform that portion himself or herself.

    • Subcontractor Listing (required)

      For each subcontractor performing one half of one percent or more for any portion of work on this project, please provide the following:

      • Name of Contractor
      • Corporate Office Address
      • Local Office Address
      • Contractor's License Number
      • Contractors DIR Number
      • DUNS Number
      • UEI Number
      • OCLSB/DVBE Certification Number (if applicable)
      • SBA Certification Number (if applicable)
      • Type of Work, Trade, Service, or Portion of Work to Be Provided
      • Dollar Amount of Work Performed

      In the event that you are not using any subcontractors for this project, please state "N/A" here or simply not that you will not be using subcontractors. You must clearly state all the requested information for any subcontractor you intend to use here and at this time, a response of "N/A" here and use of subcontractors or requested use of subcontractors at a later time may result in your bid being deemed as non-responsive.

    • Minimum Experience/Qualifications Statement

      The classification of contractor’s license required for the performance of this Project is NO VALUE. Within the last NO VALUE years, the Bidder shall have completed at least NO VALUE projects of similar size, scope, and complexity as this Project.

      These must be projects that are not County of Orange projects and shall not be from the same owner. 

    • Project Experience & Qualifications (required)

      Please provide the following for at least NO VALUE projects completed over the last NO VALUE years that had a similar scope to that of the project noted in this Invitation for Bids for which you were the prime contractor:

      • Project Name/Description
      • Owner/Agency
      • Owner's Project Manager Name
      • Owner's Project Manager's Phone Number
      • Owner's Project Manager's Email Address
      • Total Contract Amount of Project
      • Date of Project Completion

      You may provide more than the minimum number of projects if you wish.

    • Experience & Qualifications Confirmation (required)

      By confirming/acknowledging this Minimum Experience/Qualifications Statement, the Bidder certifies that the information provided is true and accurate.  False or inaccurate information may result in the Bidder being deemed non-responsive.  (Reasonable approximations of quantities are acceptable.)

    • Financial Status (required)

      Bidder shall indicate whether its principals, directors, or majority shareholder(s), or any company Bidder has held a controlling interest in, or which has held a controller interest in Bidder, has ever filed or has been involuntarily put into bankruptcy or has been declared bankrupt. If yes, attach statement indicating the bankruptcy date, court jurisdiction, trustee’s name and telephone number, amount of liabilities, amount of assets and current status of bankruptcy.

      • No action pending
      • No prior action
      • Information Attached
    • Forms
    • Certification Regarding Debarment (required)

      Please download the below documents, complete, and upload.

    • Non-Collusion Declaration (required)

      Each Respondent must execute the Non-Collusion Declaration contained in the solicitation and submit it with the Response.

      The County of Orange may require that the Respondent, before awarding any subcontract, secure Non-Collusion Declarations from proposed Subcontractors. The County of Orange does not conduct business with Respondents who engage in the act of Collusion. 

    • Non-Collusion Declaration - A (required)

      Has your firm ever initiated discussions with competing consulting firms about the payment structure of an existing or potential future contract with the County of Orange?

      If Respondent selects Yes answer, Respondent must provide a brief explanation below. A “Yes” answer may preclude you from moving forward in the solicitation Process. 

    • Reason for Collusion: (required)
    • Non-Collusion Declaration - B (required)

      Has your firm participated in any discussions with competing firms in an effort to influence the payment structure for existing or potential County contracts?

      Respondent must select one (1). A “Yes” answer may preclude you from moving forward in the solicitation Process. 

    • Provide names of competing firms: (required)
    • In-Use Off-Road Diesel-Fueled Fleets Regulation form (required)

      Please download the below documents, complete, and upload.

    • IRAN Contracting Affidavit (required)

      Please download the below documents, complete, and upload.

    • Homeless Service System Pillars Attestation (required)

      Please download the below documents, complete, and upload.

    • The Levine Act: County of Orange Campaign Contribution Disclosure (required)

      The Levine Act compliance is a minimum submittal requirement of this solicitation. 

      Please complete and sign the County of Orange Campaign Contribution Disclosure Form attached hereto. A Bidder's failure to provide a completed and signed copy will render its proposal as incomplete and nonresponsive. 

      It is the supplier's responsibility to update the County should any new reportable activity occur between initial disclosure and award.

    • VPAT Attestation of Compliance (required)

      The County of Orange integrates VPAT review into its IT procurement process to ensure that all acquired products and services are accessible to individuals with disabilities. By adhering to the Web Content Accessibility Guidelines (WCAG) 2.1, Level AA, the County affirms its commitment to creating a digital environment that is inclusive, user-friendly, and accessible to everyone in the community.

      All third-party suppliers engaged by the County of Orange must ensure that any web content, applications, or digital assets they produce or maintain meet or exceed WCAG 2.1 Level AA standards. These requirements apply to websites, mobile apps, documents (e.g., PDFs, Word, Excel), and multimedia elements (e.g., videos, images, audio).

      I attest under penalty of perjury under laws of the State of California that the submitted Accessibility Conformance Report (ACR), based on the VPAT, is accurate and complete to the best of my knowledge and represents the current accessibility status of the product or service identified.

    • Accessibility Conformance Report (ACR) (required)

      Respondents shall upload a completed Accessibility Conformance Report (ACR) based on the VPAT WCAG Edition.

      Submission of the ACR represents the supplier’s self-reported assessment of accessibility conformance and will be used by the County to assess alignment with accessibility standards and business requirements.

    • Contractor Safety (required)

      Contractor shall comply with County’s Safety and Loss Prevention Policy and Procedure #306 (“Contractor Safety Responsibilities”) and submit a copy of its Injury and Illness Prevention Program (IIPP) and Contractor Safety-Activity Checklist to the designated County Procurement staff as part of the solicitation and/or contract process. Contractor will notify County Project Manager of any revisions to the Safety-Activity Checklist and will provide a new Safety-Activity Checklist upon County request. The IIPP shall comply with California Code of Regulations, Title 8, Section 1509 or 3203 (whichever applies). Contractor shall submit other safety programs that pertain to the type of job that will be performed on site. County reserves the right to conduct inspections and audits as necessary for the purpose of evaluating any aspect of safety performance under this Contract.

      Last Revision: 5/13/22

    • Safety Data Sheets (SDS) (required)

      Contractor is required to provide a Safety Data Sheet (SDS) compliant with California Code of Regulations, Title 8, Section 5194, for each hazardous substance that is provided, used or created as part of the goods or  services provided by Contractor to County. The SDS for each substance must be sent to either the County  Project Manager, as specified in the “Notices” provision of this Contract, or to the place of shipment or  provision of goods/services.

    • Confirmation of Forms and Supplemental Documents (required)

      Please confirm that all the forms within this section have been completed accurately to the best of your knowledge and as requested and required by this Invitation for Bids.

    • Final Submittal Information
    • At least 10% of the Base Bid Amount is accompanying this Bid. (required)
    • Submittal Confirmation (required)

      The Bidder declares that the only persons or parties interested in this Bid are those named herein; that this Bid is made without collusion with any other person or entity; that the Bidder is fully informed of the conditions relating to the work to be performed; that the Bidder has carefully reviewed and complied with the Instructions to Bidders; that Bidder has carefully reviewed the Agreement, General Conditions, Plans, Special Provisions, and all other Contract Documents. The Bidder agrees that upon acceptance of this Bid by the award of the Contract, the Bidder has entered into a contract with the County of Orange, a political subdivision of the State of California (“County”), to provide all the necessary labor, materials, machinery, tools, apparatus, and other means for construction, and to complete all work as specified in the Contract Documents in the manner, time, and according to all requirements, terms, and conditions set forth in the Contract Documents.

      The Bidder must be an individual or entity holding a valid California State Contractor’s License (number and classification as set forth in the Instructions to Bidders) in accordance with the requirements of this Bid and Business & Professions Code Section 7028.15. By electronically submitting this Bid, Bidder certifies that the Contractor's License referenced above is in good standing and has been properly issued to Bidder.

      Bidder confirms that they have read and understand and agree to the terms and conditions herewith, and are submitting a bid in response to this solicitation.

    • Additional Information (if needed) (required)

      For any additional information requested or required by any of your previously provided answers please upload that additional documentation here.

      This includes any power of attorney that may be required as a part of this bid response.

    • Type of Invitation to Bid (required)
    • Are bidders allowed to submit substitutions for this bid? (required)
    • Is this Vertical or Horizontal Construction? (required)
    • Is this a Construction project over $5 Million (required)
    • Prime Contractor Completion Percentage (required)

      Using both the written and numeric values, please state the minimum percentage of the total project that the prime contractor is required to complete with its own organization.

      Please use the following format:
      written number (#)

      EXAMPLE (50):
      fifty (50)

      NOTE: DO NOT ENTER THE % SYMBOL, IT WILL BE AUTOMATICALLY ADDED FOR YOU

    • Minimum Number of Days for Final Addendum (required)

      What is the minimum number of days prior to the final due date and time of bids that an addendum will be issued? (Default will be 3 days but you may extend if you wish)

      Please state in the following format:
      written number (#)

      EXAMPLE:
      three (3)

    • Supplementary General Conditions (required)

      Are there any Supplementary General Conditions that need to be included in the procurement for this project?

      NOTE: Answering "YES" here will only allow you to add the terms manually. If you wish to upload them as an attachment then you must also be sure to upload them to the Attachments section of this project here.

    • Special Provisions (required)

      Do you wish to include a section for Special Provisions in the procurement for this project?

      NOTE: Answering "YES" here will only allow you to add the terms manually. If you wish to upload them as an attachment then you must also be sure to upload them to the Attachments section of this project here. If you plan to incorporate any Special Provisions into the Scope of Work section then you may answer "NO" here so that the Special Provisions section does not appear.

    • Performance and Payment Bond Amount (required)

      The successful Bidder, immediately upon award, will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond in an amount of:

      Enter Number Amount Only. Dollar Sign is Provided in Text.

    • Job Order Contracting (JOC) for _________ Services (required)
    • Pre-Bid Meeting? (required)

      Whether mandatory or non-mandatory, is there a pre-bid meeting and/or site walk for this project?

    • Pre-Bid Meeting Attendance (required)
    • Provide the date of the day before the pre-bid meeting for RSPVs: (required)
    • Project Completion - Number of Years (required)

      For contractor experience, what is the range of years (within the last # of years) for project completion?

    • Contractor License Requirement (required)

      What is the class of Contractor's License required for the prime?

    • Number of Reference Projects (required)

      What is the minimum number of projects of similar size and scope to this project that the prime contractor shall have completed within the stated range of years?

    • Federal Funding? (required)

      Is there any federal funding being used for this project?

    • Does this solicitation require any of these? (required)

      If none apply, please leave blank.

    • Is a Staffing/Key Personnel Plan needed? (required)
    • Is this solicitation open to Sub-Contractors? (required)
    • Vendor Pricing (required)

      How do you want to receive pricing from vendors for this project?

    Key dates

    1. June 12, 2026Published
    2. July 10, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.