SLED Opportunity · GEORGIA · GEORGIA
AI Summary
The City of Hoschton, GA seeks sealed bids for construction of Barrow County Water Supply Connection - Phase I, including waterline installation, directional drilling, valve vault construction, and electrical/SCADA systems. Bids due April 23, 2026.
Sealed bids will be received by the City of Hoschton, Georgia for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the construction of Barrow County Water Supply Connection ¿ Phase I in Hoschton, Georgia. Bids will be received at Hoschton City Hall, 61 City Square Street, Hoschton, GA 30548 until 2:00 p.m. on April 23, 2026. Any bid received after said time and date of bid opening will not be considered by OWNER. Bids will be publicly opened and read aloud at this time and location. The Project consists of, but is not limited to the following major elements: Installation of approximately 350 LF of 12-inch restrained joint DIP waterline, 300 LF horizontal directional drilling of 20-inch DR17 IPS HDPE with a 12-inch DR9 DIPS HDPE carrier pipe, connections to existing waterlines, a 6-ft x 12-ft solenoid control valve vault, electrical and SCADA, valves and associated appurtenances. For purchasing hard copy documents or requesting free digital sets regarding this project, you may contact Jessica James at 770-962-1387 or jjames@eminc.biz. For technical questions regarding this project, you may contact Greg Bennett at 770-962-1387 or gbennett@eminc.biz.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.