    Battery Energy Storage System Installation - Cranes

    Issued by The Pasha Group
    localRFPThe Pasha GroupSol. KCT14209
    Closed
    STATUS
    Closed
    due Mar 11, 2026
    PUBLISHED
    Feb 13, 2026
    Posting date
    JURISDICTION
    The Pasha
    local
    NAICS CODE
    238210
    AI-classified industry

    AI Summary

    RFP for installation of a Tesla 2XL Megapack Battery Energy Storage System to capture energy from container cranes' regenerative braking. Includes labor, materials, and site construction in San Rafael, CA.

    Opportunity details

    Solicitation No.
    KCT14209
    Type / RFx
    RFP
    Status
    Bidding
    Level
    local
    Published Date
    February 13, 2026
    Due Date
    March 11, 2026
    NAICS Code
    238210AI guide
    Jurisdiction
    The Pasha Group
    Agency
    The Pasha Group

    Description

    HSI is requesting proposals from qualified Proposers to provide labor and materials necessaryfor the installation of a Tesla 2XL Megapack 1.9MW, 3.9MWh BESS to store the energyprovided by the Ship-to-Shore (STS) container cranes’ regenerative brake drive units. All workshall be in accordance with drawings “Figure 1” and information attached in Figure 2 – 5. TheBESS equipment will be provided by HSI. Proposers must provide a Firm Fixed price for theBESS installation at the time the contract is awarded. Pre-Bid Meeting Information: Yes Online Q&A: Yes Location Information: Department: Procurement Address: 4040 Civic Center Dr.San Rafael, California94903 County: Marin Other Details: The Proposer must provide as-built plans that show the complete BESS and associated hardwareequipment installation, including concrete pads, anchoring, conduits, wiring and wiringconnections. The installation shall be complete and shall be performed in a manner acceptableto the HSI Construction Manager and in full compliance with the terms of the Contract,including, but not limited to transportation to site, insurance, required materials not includedwith the HSI furnished BESS and associated hardware., required site construction and civil work.BESS and associated hardware to be transported to site by HSI.Unless otherwise noted, the Contractor shall furnish all materials, labor, tools, equipment, water,light, power, transportation, superintendence, temporary construction of every nature, andincidentals, and to perform all work involved in executing the Contract in a satisfactory andworkmanlike manner within the specified time.The Contractor shall review the Contract Bid Documents and create a plan to deliver keyoutputs as per Figure 1. Notes: The purpose of this Request for Proposals (“RFP”) is to solicit proposals from qualifiedProposers to provide labor and materials necessary for the installation of an ABB CraneRegeneration Power and Energy management Solution Battery Energy Storage System (BESS)to store the energy provided by the Ship-to-Shore (STS) container cranes’ regenerative brakingdrive units as defined in this RFP.

    Key dates

    1. February 13, 2026Published
    2. March 11, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.