Active SLED Opportunity · SOUTH CAROLINA · BEAUFORT COUNTY, SC

    Beaufort County Sheriff's Office New Bloodhound Kennel Facility | Design Services

    Issued by Beaufort County, SC
    countyRFQBeaufort County, SCSol. 266795
    Open · 28d remaining
    DAYS TO CLOSE
    28
    due Jul 1, 2026
    PUBLISHED
    May 20, 2026
    Posting date
    JURISDICTION
    Beaufort County,
    county
    NAICS CODE
    541310
    AI-classified industry

    AI Summary

    Beaufort County, SC seeks qualified architectural and engineering firms for design services to develop a new Bloodhound Kennel Facility for the Sheriff's Office. This RFQ is for design services only; construction will be procured separately. Proposals due by July 1, 2026, with a pre-proposal meeting on June 4, 2026.

    Opportunity details

    Solicitation No.
    266795
    Type / RFx
    RFQ
    Status
    open
    Level
    county
    Published Date
    May 20, 2026
    Due Date
    July 1, 2026
    NAICS Code
    541310AI guide
    Agency
    Beaufort County, SC

    Description

    REQUEST FOR QUOTATION (RFQ)

    DESIGN SERVICES


    BEAUFORT COUNTY SHERIFF’S OFFICE
    NEW BLOODHOUND KENNEL FACILITY
    BEAUFORT COUNTY, SOUTH CAROLINA


    1. NOTICE OF REQUEST FOR QUALIFICATIONS

    Beaufort County, South Carolina is soliciting sealed proposals from qualified architectural and engineering firms to provide professional design services for the development of a new Sheriff’s Office Bloodhound Kennel Facility.

    The selected firm will provide architectural and engineering (A/E) design services. Construction will be procured separately by the County.

     

    Important: This RFQ is for design services only. Construction and design-build services are not included in this solicitation.


    2. PROJECT OVERVIEW

    The Beaufort County Sheriff’s Office currently operates bloodhound kennels located at a former Animal Shelter site. These facilities are obsolete, unsuitable for continued use, and must be replaced. The existing site is also required for future County use.

     

    The County intends to construct a new, purpose-built kennel facility at:

    Beaufort County Animal Shelter Campus
    10 Pritcher Point Road
    Okatie, South Carolina 29909

    Project Details

    • Reference ID: 062426
    • Department: Capital Projects
    • Department Head: Hank Amundson (Special Assistant to County Administrator)

    Important Dates

    • Questions Due: 2026-06-11T21:00:00.000Z
    • Pre-Proposal Meeting: 2026-06-04T18:00:00.000Z — Please email gmurray@bcgov.net for TEAMS invitation

    Evaluation Criteria

    • Relevant Experience (25 pts)

      Experience with an emphasis on similar type project completed within the last five (5) years.

    • Design Quality and Approach (25 pts)

      Knowledge of local conditions and potential challenges to be considered in developing the project. The ability to address and solve challenges in the design process.

    • Understanding of Project Goals (25 pts)

      Ability to provide various design options, to evaluate cost-benefit analysis, taking construction and maintenance costs into consideration.

    • Team Qualifications (25 pts)

      Qualifications of firm personnel.

    Submission Requirements

    • Firm confirms the proposal is firm for a period of at least 90 days from the closing date for submission of proposal. (required)
    • Certification regarding Debarment, Suspension, Ineligibility, and Voluntary exclusion (required)

      The contractor certifies, by submission of this qualification statement or acceptance of a contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any State, Federal department, or agency.

      It further agrees by submitting this qualification statement that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts. Where the bidder/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/bid.

    • Has your company been involved in any litigation within the past five (5) years, arising out of your performance. (required)
    • Explain fully any litigation involving performance. (required)
    • Non-Segregated Facilities (required)

      CERTIFICATION BY CONTRACTOR

      Regarding

      NON-SEGREGATED FACILITIES

      The Bidder certifies that he does not, and will not, provide and maintain segregated facilities for his employees at his establishments and, further that he does not, and will not, permit his employees to perform their services at those locations, under his control, where segregated facilities are provided and maintained. Segregated fountains, transportation, parking, entertainment, recreation, ad housing facilities; waiting, rest, wash, dressing, and locker room, and time clock, work, storage, restaurant, and other eating areas which are set apart in fact, or by explicit directive, habit, local custom, or otherwise, based on color, creed, national origin, and race. The Bidder agrees that, except where he has obtained identical certifications from proposed subcontractors for specific time periods, he will obtain identical certifications from proposed subcontractors prior to the award of subcontractors exceeding $10,000.00 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files.

      The Bidder agrees that a breach of this certification is a violation of the Equal Opportunity clause in this Contract. The penalty for making false statements is prescribed in 18 U.S.C. 1001.

    • Please upload any relevant certifications and/or licenses
    • Qualification Statement (required)

      To achieve a uniform review process and allow for adequate comparability, the information is to be organized in the manner specified below and the entire package must not exceed 15 double-sided printed pages excluding cover pages. Please include a cover page at the start of each section.

      1. Executive Summary:  Summary of your company's mission, management, services provided, and competitive advantage
      2. Approach to the Planning Process: Explanation of the process to the Firm's Planning Process for project kickoff
      3. Work Plan and Scheduling: A summary of tasks to be performed from evaluation of data through County approval of the final plan. Include a timeline of key milestone to include overall durations for each major task.
      4. Experience and Qualifications:  Experience and qualifications of the team members, with an emphasis on similar type project completed within the last five (5) years. Provide an organization chart including sub-consultants and contractors. 
      5. List any exceptions, qualifications, or exclusions to this RFP
    • Will your Pre-Proposal Meeting be Mandatory or Non-Mandatory? (required)
    • Will your Pre-Proposal Meeting be In-Person or Online? (required)

    Key dates

    1. May 20, 2026Published
    2. July 1, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.