City of Temple seeks contractors for construction of new LED PAPI and REIL lighting systems on Runway 34 at Draughon-Miller Central Texas Regional Airport, including an add alternate for electrical conduit replacement. Estimated cost $100,922 with 180-day completion.
Bid submittals will be received to furnish all labor and materials and perform all work for the construction of the following described project:AIRPORT PAPI AND REIL REPLACEMENT - RUNWAY 34 (TXDOT RAMP GRANT)This project consists of constructing a new 4-box LED Precision Approach Path Indicator (PAPI) and Runway End Identifier Lights (REIL) to replace the existing PAPI and REILs on runway 34 at the Draughon-Miller Central Texas Regional Airport, 7720 Airport Rd. Temple, TX 76502. An Add Alternate is included to replace existing direct buried electrical lines with new lines inside of conduit from the electrical box to the lights, and any upgrades to the electrical box needed.The engineer’s estimate of probable construction cost associated with this project is $100,922.The selected Contractor shall complete the work within 180 consecutive calendar days from Notice to Proceed.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.