Active SLED Opportunity · CALIFORNIA · CITY OF TORRANCE

    BID FOR TORRANCE TRANSIT FACILITY FIRST AND SECOND FLOOR RENOVATION

    Issued by City of Torrance
    cityRFPCity of TorranceSol. B2026-11
    Open · 36d remaining
    DAYS TO CLOSE
    36
    due Jul 9, 2026
    PUBLISHED
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    City of Torrance seeks bids for renovation of first and second floors of its Transit Facility, including interior upgrades, ADA-compliant restrooms, lighting, and new exterior storefront installation. OSHA compliance and permits required.

    Opportunity details

    Solicitation No.
    B2026-11
    Type / RFx
    RFP
    Status
    Bidding
    Level
    city
    Published Date
    Due Date
    July 9, 2026
    NAICS Code
    236220AI guide
    Jurisdiction
    City of Torrance
    Agency
    City of Torrance

    Description

    The City of Torrance is requesting bids for Torrance Transit Facility First and Second Floor Renovation as per the plans and specifications provided by the City of Torrance and BOA Architecture. The project consists of renovation of the first and second floor of the Torrance Transit Facility. In case of disputes, City requirements take precedence. Pre-Bid Meeting Information: Yes Online Q&A: Yes Location Information: Department: Purchasing Address: Transit Facility - 20500 Madrona Avenue Torrance, CA 90503 County: Los Angeles Other Details: First Floor - renovation of a storage area into a new breakroom and dispatch area with new updated LED lighting, two gender neutral restrooms (one which meets ADA standards), a new kitchenette, a new dispatch window area, relocated dispatch mailboxes, refinished concrete floors, and window storefronts.Second Floor - renovation of common spaces with a new landing façade wall with TV display, updated drinking fountain, repolished concrete floors, updated LED lighting, wall cabinetry for added storage, and updated outlets with USB fixtures, new private office, new kitchen layout with proper fixtures, new exhaust fans at all restrooms, new open office with cubicles, new carpet, paint, acoustics at existing offices.Exterior - Provide new exterior aluminum storefront system with tempered glass, new aluminum storefront door and door hardware.• Regulatory Compliance:o Must follow OSHA (29 CFR 1926) safety and health regulations.o Obtain all necessary permits before work begins.

    Key dates

    1. July 9, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.