Active SLED Opportunity · NEW YORK · NEW YORK

    Big Rock Wetland Restoration

    Issued by Save the Sound
    stateRFPnew yorkSol. 2137329
    Open · 18d remaining
    DAYS TO CLOSE
    18
    due Aug 24, 2026
    PUBLISHED
    Jul 21, 2026
    Posting date
    JURISDICTION
    new york
    state
    NAICS CODE
    237990
    AI-classified industry

    AI Summary

    Restoration of tidal marsh wetlands along Douglas Road in New York, including invasive species removal, native plantings, drainage channel creation, oyster castle installation, and slope stabilization to improve coastal resiliency and habitat diversity.

    Opportunity details

    Solicitation No.
    2137329
    Type / RFx
    RFP
    Level
    state
    Published Date
    July 21, 2026
    Due Date
    August 24, 2026
    NAICS Code
    237990AI guide
    Jurisdiction
    new york
    Agency
    Save the Sound

    Description

    Project Summary Restoration of wetland areas along Douglas Road through the removal and replacement of invasive species with native plants. Project includes establishing wetland drainage channels and installing nearshore oyster castle wave attenuators. Furthermore, wetland areas and Development landward of the wetland comprises construction of a Live Timber Crib Wall and Revetment Toe along with installation of Brush Mattresses. The purpose of this project is to restore and enhance an existing tidal marsh to a more functioning wetland to mitigate adverse impacts on wetland structure and function, improve coastal resiliency and minimize local flooding, promote marsh migration to mitigate effects of sea level rise, enhance horseshoe crab spawning habitat, provide substrate for oyster reef generation, create more diverse habitats for wildlife, and increase water quality by reducing impacts of nutrient loading from groundwater sources. This will be accomplished through the following proposed living shoreline components: Excavation of Phragmites australis with the rhizomes and replanting of intertidal and high marsh plants; Creation of a drainage channel through the restored marsh bounded by coir logs; Installation of oyster castles along the edge of the restored marsh and the seaward side of the eroded marsh; Cutting back the existing bank and removal of stone along the shorefront of Memorial Field flattening the slope to allow for marsh migration. The bottom of the regraded slope will be planted to tidal marsh plants and above to a native grass/wildflower buffer; Slope stabilization along the southern end of the project with brushmattress; Slope stabilization within the steep sloped mid-section with a Live Timber Crib Wall and stone toe, and wetland plantings on the flatter areas; The northern high-energy segment will be stabilized with a hybrid vegetated stone revetment, live stakes & salt shrubs. Bid Documents Prospective Bidders can obtain Bid and Contract documents by sending an email to the following address stating their interest in the bid: ecoresto_bids@savethesound.org. Once we get your email you will be registered in our list and receive a download link for the bid manual. Only Registered Bidders will be updated periodically with addenda and other relevant information relevant to submitting a Bid for the Project. Neither Owner nor Administrator will be responsible for any errors made by any Bidder as a result of the Bidder having used inaccurate and/or incomplete Bidding Documents, including addenda, if any, if Bidder obtains its Bid Documents from sources other than the dedicated email address. Bidders are solely responsible for ensuring that they have received all addenda issued prior to submission of their Bid and the failure to acknowledge required addenda may result in rejection of the Bid as non-responsive. Instructions to Bidders Additional requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 15.00% WBE Goal: 15.00%

    Key dates

    1. July 21, 2026Published
    2. August 24, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.