    City of Loveland seeks proposals for the Big Thompson Canyon Broadband Expansion under a USDA Community Connect Grant. This RFP involves capital projects and electronic bid submission with a due date of August 20, 2026.

    Opportunity details

    Solicitation No.
    9443443308
    Type / RFx
    RFP
    Status
    Active
    Level
    city
    Published Date
    July 28, 2026
    Due Date
    August 20, 2026
    NAICS Code
    517919AI guide
    Jurisdiction
    City of Loveland
    Agency
    City of Loveland

    Description

    Big Thompson Canyon Broadband Expansion USDA Community Connect Grant – Capital Projects Fund Grant Awarded Project Area ... **Project Type**: RFP - Request for Proposal (Formal) **Source ID**: PU.AG.USA.1245.C13819276 **Piggyback Contract**: No **Question Acceptance Deadline**: 08/10/2026 04:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: City of Loveland - Utilities **Reference Number**: 0000432088 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Line Items**: | description | quantity | uom | |---|---|---| | Vault Installation – Large (36 in. x 60 in. x 36 in.) | 2.0 | Each | | Fusion Splicing | 326.0 | Each | | Bidirectional Testing (OTDR) | 115.0 | Each | | Power Meter Testing | 115.0 | Each | | Install Fiber Enclosure - Type D | 2.0 | Each | | Install Fiber Enclosure - Type B | 2.0 | Each | | Existing Fiber Enclosure Entry | 2.0 | Each | | Install Type D Splice Tray - 72 Capacity | 4.0 | Each | | Install Fiber Enclosure - Type B | 8.0 | Each | | Aerial - Soil Anchor and Down Guy Installation | 12.0 | Each | | Aerial - Install New Strand and Hardware | 18000.0 | Foot/Feet | | Aerial - Fiber Optic Cable Installation W/Lashing | 43500.0 | Foot/Feet | | Aerial - Additional Fiber optic Cable Installation W/Lashing | 1500.0 | Foot/Feet | | Aerial - Splice closure and AT Installation | 50.0 | Each | | Aerial - Install Riser Guard | 2.0 | Each | | Aerial - Down Guy Installation Existing Aux. Eye | 60.0 | Each | | Aerial - Rock Anchor and Down Guy Installation | 4.0 | Each | | Aerial - Install Fiber Enclosure - Mini-OTE | 43.0 | Each |

    Key dates

    1. July 28, 2026Published
    2. August 20, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.