Active SLED Opportunity · COLORADO · CITY OF AURORA
AI Summary
City of Aurora seeks qualifications for LED lighting improvements at the Binney Water Purification Facility to enhance efficiency and resolve lighting issues. Design services by Citrine LLC are near final.
The Binney Water Purification Facility is located at 5070 S Robertsdale Way, Aurora, CO 80016, USA, the WPF was constructed in 2010 Refer to figure 1 for project location and map. The main objectives of the project are to enhance lighting efficiency, Resolve ongoing lighting system issues across several buildings within the facility. By replacing the existing lighting system with LED. The City hired Citrine LLC for design services. They are currently advancing the 90% design toward the final issued design (100%/IFC set). **Project Type**: SOQ - Statement of Qualifications (Informal) **Source ID**: PU.AG.USA.1028.C5891301 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/14/2026 04:00 PM EDT **Questions are submitted online**: No **Bid Submission Type**: Electronic Bid Submission **Reference Number**: 0000423491 **Pricing**: No Pricing **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | Yes | No |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.