Active SLED Opportunity · CONNECTICUT · CONNECTICUT
AI Summary
Paving project for front and rear parking lots at Brookside Elementary School in Norwalk, CT, including milling, overlay, curb replacement, ADA ramps, and pavement markings.
The proposed work for the Base Bid project are two parking lots for the Board of Education. Those locations are the front and rear parking lots of Brookside Elementary School, 382 Highland Ave. Norwalk. CT. This scope consists of a 2” mill and overlay of the existing parking lots, resetting of existing structures as depicted, removing and replacing the existing bituminous concrete curb, and installation of pavement markings and ADA ramps. The parking lots will be closed while the Project is taking place. The requirements of this project are outlined in greater detail under Section 102-16 Special Specifications and Notes URL to bid and specs: https://norwalkct.bonfirehub.com/opportunities/235203
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.