    BPTS Pit Wall and Tipping Floor

    Issued by Hennepin County
    countyRFPHennepin CountySol. FC00000212
    Open · 27d remaining
    DAYS TO CLOSE
    27
    due May 20, 2026
    PUBLISHED
    Apr 14, 2026
    Posting date
    JURISDICTION
    Hennepin County
    county
    NAICS CODE
    238110
    AI-classified industry

    AI Summary

    Hennepin County seeks contractors for concrete floor replacement, curb replacement, and pit wall repair at Brooklyn Park Transfer Station. The project requires completion within 28 days during a 30-day facility closure in late 2026.

    Opportunity details

    Solicitation No.
    FC00000212
    Type / RFx
    RFP
    Status
    active
    Level
    county
    Published Date
    April 14, 2026
    Due Date
    May 20, 2026
    NAICS Code
    238110AI guide
    Jurisdiction
    Hennepin County
    Agency
    Hennepin County

    Description

    1.1 PROJECT DESCRIPTION / OWNER INTENT The Brooklyn Park Transfer Station, located at 8100 N Jefferson Highway in Brooklyn Park, Minnesota, was constructed in 1989. This Project consists of modifying three areas of the facility: (1) In the maneuvering area, replace the concrete floor. Floor replacement includes demolition of the existing concrete floor and installation of new concrete floor with floor drain replacement. (2) The curb at the top of the storage pit wall is to be replaced. Curb replacement includes demolition of the existing concrete curb and installation of new concrete curb with a protective steel plate over the curb. (3) The storage pit concrete wall below the new curb is to be repaired. Wall repairs include removal of asphalt base, removal of loose concrete and rebar materials, and installation of new concrete wall with associated embeds and rebar material. The schedule is a critical aspect of this project . The facility will be closed for 30 calendar days. Contractor will have 28 days - from October 10, 2026 through November 6, 2026 (the “Mobilization” period) - to complete all work, inclusive of concrete curing time. Pre-Mobilization Period. The Contractor will be granted access to the facility for pre-closure work that will not have significant impact on facility operations. Such Work must occur outside of facility operating hours, which are Monday-Friday 6:00am - 4:00pm. Permission to perform pre-closure work must be requested in writing. Owner will not approve pre-closure work that disrupts facility operations. Printed sets/plan holders list Printed sets and plan holders list are available from: ARC Document Solutions 4730 Park Glen Road St. Louis Park, MN 55416 952-697-8800 Website

    Key dates

    1. April 14, 2026Published
    2. May 20, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.