Construction of the following for the North Texas Municipal Water District:
- Installation of approximately 9,100 LF of 42” Fiberglass sanitary sewer piping
- Procurement and installation of valves and appurtenances per the contract drawings and specification
- Installation of CMAR provided valves in Bid Package 11 (majority of large diameter valves)
- Installation of fiber conduit
- Installation of fiber cabling that will parallel the South Mesquite force mains from Buffalo Creek Lift Station No. 2 to South Mesquite Creek Regional WWTP.
## Details
**Bid/Project ID:** 224092-BP13
**Type of Work:** Wastewater Pipeline
**Pre-Bid Location:** Virtual (Microsoft Teams)
**Pre-Bid Notes:** https://teams.microsoft.com/meet/25500904726998?p=BB1WIjwrsAtSMCpr9Q
**Bid Location:** 1411 Greenway Dr., Irving, TX 75038
**Bid Notes:** ATTN: Johnathan Polak
**Engineer/Publisher:** Archer Western Construction
**Engineer Address:** 1411 Greenway Dr., Irving, Texas, 75038
## Additional Notes
The purpose of this meeting is to share the list of proposers who have submitted bids on Bid Opening day.
Note: Proposal costs will not be shared at this time.
Date: 04/16/2026
Time: 2:10 PM CST
Microsoft Teams meeting
Join:
https://teams.microsoft.com/meet/25411104768191?p=dfcEZIPPsk0IuoAc1Z
Meeting ID: 254 111 047 681 91
Passcode: Qm3Js259
Dial in by phone
+1 773-917-3510,,525089798#
United States, Chicago
Find a local number
Phone conference ID:
525 089 798#
## Notes
+ Bid Package 13 – Buffalo Creek Parallel Force Main Construction Drawings IFB
+ Bid Package 13 – Buffalo Creek Parallel Force Main Construction Specifications IFB
+ Appendix A - Bid Package 08 - Buffalo Creek Lift Station Force Main Construction Drawings
+ Appendix B - Bid Package 11 - Buffalo Creek Parallel Force Main Valve Procurement Drawings and Specifications