Active SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS
AI Summary
Formal bid opportunity for water facilities construction and improvement projects at McGee Creek Reservoir, Oklahoma City. Includes sediment control, demolition, electrical conduit replacement, and other construction services. Mandatory pre-bid conference on May 14, 2026.
Prequalification Requirement is Water Facilities Contractor “B” WMC-043, Bureau of Reclamation Improvement Projects, McGee Creek Reservoir **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/19/2026 09:00 AM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Oklahoma City Water Utilities Trust **Reference Number**: 0000421400 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 05/14/2026 11:00 AM EDT | Location: Utilities Department, 1 North Walker, Large Conference Room 124-125, Oklahoma City, Oklahoma 73102 | Event Note: 103.01.03 – MANDATORY PRE-BID CONFERENCE103.01.03.01 When specified in the Notice to Bidder, attendance at the Pre-Bid Conference is a prequalification requirement. If there is a virtual meeting option, the virtual address will be provided in the Notice to Bidders. When the Notice to Bidders specifies that the Pre-Bid Conference is mandatory, the contractor who plans to submit a bid must attend the Mandatory Pre Bid Conference. Failure of the prospective bidders to attend a Mandatory Pre-Bid Conference will cause the bidder’s submission to be rejected. Whenever required, a Mandatory Pre-Bid Conference is a prequalification requirement to bid on the contract. **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next OCWUT WMC-043 Next 1-Base Bid Code Description UOM Qty 1 PRE-POST-CONSTRUCTION VIDEO RECORDING Lump-Sum 1 2 MOBILIZATION Lump-Sum 1 3 SEDIMENT & EROSION CONTROL Lump-Sum 1 4 REMOVE AND REPLACE 12-INCH CGMP TOE DRAINS Linear Foot/Feet 20 5 REMOVE AND RESET 24-INCH RIPRAP Cubic Yard 30 6 DRYWALL DEMO FOR JET FLOW METER VAULT Lump-Sum 1 7 DRYWALL DEMO FOR JET FLOW VALVE VAULT Lump-Sum 1 8 DRYWALL DEMO FOR EAST AND WEST INSTRUMENT HOUSES Lump-Sum 1 9 RE-SEAL JOINTS IN TUNNEL LINER Lump-Sum 1 10 REMOVE AND REPLACE 16-INCH AIR VENTALIATION DUCT Lump-Sum 1 11 REMOVE AND REPLACE ELECTRICAL CONDUIT AND CONDUCTORS Lump-Sum 1 | Next 1-Base Bid Code Description UOM Qty 1 PRE-POST-CONSTRUCTION VIDEO RECORDING Lump-Sum 1 2 MOBILIZATION Lump-Sum 1 3 SEDIMENT & EROSION CONTROL Lump-Sum 1 4 REMOVE AND REPLACE 12-INCH CGMP TOE DRAINS Linear Foot/Feet 20 5 REMOVE AND RESET 24-INCH RIPRAP Cubic Yard 30 6 DRYWALL DEMO FOR JET FLOW METER VAULT Lump-Sum 1 7 DRYWALL DEMO FOR JET FLOW VALVE VAULT Lump-Sum 1 8 DRYWALL DEMO FOR EAST AND WEST INSTRUMENT HOUSES Lump-Sum 1 9 RE-SEAL JOINTS IN TUNNEL LINER Lump-Sum 1 10 REMOVE AND REPLACE 16-INCH AIR VENTALIATION DUCT Lump-Sum 1 11 REMOVE AND REPLACE ELECTRICAL CONDUIT AND CONDUCTORS Lump-Sum 1 | 1 | PRE-POST-CONSTRUCTION VIDEO RECORDING | Lump-Sum | 1 | 2 | MOBILIZATION | Lump-Sum | 1 | 3 | SEDIMENT & EROSION CONTROL | Lump-Sum | 1 | 4 | REMOVE AND REPLACE 12-INCH CGMP TOE DRAINS | Linear Foot/Feet | 20 | 5 | REMOVE AND RESET 24-INCH RIPRAP | Cubic Yard | 30 | 6 | DRYWALL DEMO FOR JET FLOW METER VAULT | Lump-Sum | 1 | 7 | DRYWALL DEMO FOR JET FLOW VALVE VAULT | Lump-Sum | 1 | 8 | DRYWALL DEMO FOR EAST AND WEST INSTRUMENT HOUSES | Lump-Sum | 1 | 9 | RE-SEAL JOINTS IN TUNNEL LINER | Lump-Sum | 1 | 10 | REMOVE AND REPLACE 16-INCH AIR VENTALIATION DUCT | Lump-Sum | 1 | 11 | REMOVE AND REPLACE ELECTRICAL CONDUIT AND CONDUCTORS | Lump-Sum | 1 | | | | Next 1-Base Bid Code Description UOM Qty 1 PRE-POST-CONSTRUCTION VIDEO RECORDING Lump-Sum 1 2 MOBILIZATION Lump-Sum 1 3 SEDIMENT & EROSION CONTROL Lump-Sum 1 4 REMOVE AND REPLACE 12-INCH CGMP TOE DRAINS Linear Foot/Feet 20 5 REMOVE AND RESET 24-INCH RIPRAP Cubic Yard 30 6 DRYWALL DEMO FOR JET FLOW METER VAULT Lump-Sum 1 7 DRYWALL DEMO FOR JET FLOW VALVE VAULT Lump-Sum 1 8 DRYWALL DEMO FOR EAST AND WEST INSTRUMENT HOUSES Lump-Sum 1 9 RE-SEAL JOINTS IN TUNNEL LINER Lump-Sum 1 10 REMOVE AND REPLACE 16-INCH AIR VENTALIATION DUCT Lump-Sum 1 11 REMOVE AND REPLACE ELECTRICAL CONDUIT AND CONDUCTORS Lump-Sum 1 | 1 | PRE-POST-CONSTRUCTION VIDEO RECORDING | Lump-Sum | 1 | 2 | MOBILIZATION | Lump-Sum | 1 | 3 | SEDIMENT & EROSION CONTROL | Lump-Sum | 1 | 4 | REMOVE AND REPLACE 12-INCH CGMP TOE DRAINS | Linear Foot/Feet | 20 | 5 | REMOVE AND RESET 24-INCH RIPRAP | Cubic Yard | 30 | 6 | DRYWALL DEMO FOR JET FLOW METER VAULT | Lump-Sum | 1 | 7 | DRYWALL DEMO FOR JET FLOW VALVE VAULT | Lump-Sum | 1 | 8 | DRYWALL DEMO FOR EAST AND WEST INSTRUMENT HOUSES | Lump-Sum | 1 | 9 | RE-SEAL JOINTS IN TUNNEL LINER | Lump-Sum | 1 | 10 | REMOVE AND REPLACE 16-INCH AIR VENTALIATION DUCT | Lump-Sum | 1 | 11 | REMOVE AND REPLACE ELECTRICAL CONDUIT AND CONDUCTORS | Lump-Sum | 1 | | | 1 | PRE-POST-CONSTRUCTION VIDEO RECORDING | Lump-Sum | 1 | | 2 | MOBILIZATION | Lump-Sum | 1 | | 3 | SEDIMENT & EROSION CONTROL | Lump-Sum | 1 | | 4 | REMOVE AND REPLACE 12-INCH CGMP TOE DRAINS | Linear Foot/Feet | 20 | | 5 | REMOVE AND RESET 24-INCH RIPRAP | Cubic Yard | 30 | | 6 | DRYWALL DEMO FOR JET FLOW METER VAULT | Lump-Sum | 1 | | 7 | DRYWALL DEMO FOR JET FLOW VALVE VAULT | Lump-Sum | 1 | | 8 | DRYWALL DEMO FOR EAST AND WEST INSTRUMENT HOUSES | Lump-Sum | 1 | | 9 | RE-SEAL JOINTS IN TUNNEL LINER | Lump-Sum | 1 | | 10 | REMOVE AND REPLACE 16-INCH AIR VENTALIATION DUCT | Lump-Sum | 1 | | 11 | REMOVE AND REPLACE ELECTRICAL CONDUIT AND CONDUCTORS | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next 1-Base Bid Code Description UOM Qty 1 PRE-POST-CONSTRUCTION VIDEO RECORDING Lump-Sum 1 2 MOBILIZATION Lump-Sum 1 3 SEDIMENT & EROSION CONTROL Lump-Sum 1 4 REMOVE AND REPLACE 12-INCH CGMP TOE DRAINS Linear Foot/Feet 20 5 REMOVE AND RESET 24-INCH RIPRAP Cubic Yard 30 6 DRYWALL DEMO FOR JET FLOW METER VAULT Lump-Sum 1 7 DRYWALL DEMO FOR JET FLOW VALVE VAULT Lump-Sum 1 8 DRYWALL DEMO FOR EAST AND WEST INSTRUMENT HOUSES Lump-Sum 1 9 RE-SEAL JOINTS IN TUNNEL LINER Lump-Sum 1 10 REMOVE AND REPLACE 16-INCH AIR VENTALIATION DUCT Lump-Sum 1 11 REMOVE AND REPLACE ELECTRICAL CONDUIT AND CONDUCTORS Lump-Sum 1 | 1 | PRE-POST-CONSTRUCTION VIDEO RECORDING | Lump-Sum | 1 | 2 | MOBILIZATION | Lump-Sum | 1 | 3 | SEDIMENT & EROSION CONTROL | Lump-Sum | 1 | 4 | REMOVE AND REPLACE 12-INCH CGMP TOE DRAINS | Linear Foot/Feet | 20 | 5 | REMOVE AND RESET 24-INCH RIPRAP | Cubic Yard | 30 | 6 | DRYWALL DEMO FOR JET FLOW METER VAULT | Lump-Sum | 1 | 7 | DRYWALL DEMO FOR JET FLOW VALVE VAULT | Lump-Sum | 1 | 8 | DRYWALL DEMO FOR EAST AND WEST INSTRUMENT HOUSES | Lump-Sum | 1 | 9 | RE-SEAL JOINTS IN TUNNEL LINER | Lump-Sum | 1 | 10 | REMOVE AND REPLACE 16-INCH AIR VENTALIATION DUCT | Lump-Sum | 1 | 11 | REMOVE AND REPLACE ELECTRICAL CONDUIT AND CONDUCTORS | Lump-Sum | 1 | | | 1 | PRE-POST-CONSTRUCTION VIDEO RECORDING | Lump-Sum | 1 | | 2 | MOBILIZATION | Lump-Sum | 1 | | 3 | SEDIMENT & EROSION CONTROL | Lump-Sum | 1 | | 4 | REMOVE AND REPLACE 12-INCH CGMP TOE DRAINS | Linear Foot/Feet | 20 | | 5 | REMOVE AND RESET 24-INCH RIPRAP | Cubic Yard | 30 | | 6 | DRYWALL DEMO FOR JET FLOW METER VAULT | Lump-Sum | 1 | | 7 | DRYWALL DEMO FOR JET FLOW VALVE VAULT | Lump-Sum | 1 | | 8 | DRYWALL DEMO FOR EAST AND WEST INSTRUMENT HOUSES | Lump-Sum | 1 | | 9 | RE-SEAL JOINTS IN TUNNEL LINER | Lump-Sum | 1 | | 10 | REMOVE AND REPLACE 16-INCH AIR VENTALIATION DUCT | Lump-Sum | 1 | | 11 | REMOVE AND REPLACE ELECTRICAL CONDUIT AND CONDUCTORS | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | PRE-POST-CONSTRUCTION VIDEO RECORDING | Lump-Sum | 1 | | 2 | MOBILIZATION | Lump-Sum | 1 | | 3 | SEDIMENT & EROSION CONTROL | Lump-Sum | 1 | | 4 | REMOVE AND REPLACE 12-INCH CGMP TOE DRAINS | Linear Foot/Feet | 20 | | 5 | REMOVE AND RESET 24-INCH RIPRAP | Cubic Yard | 30 | | 6 | DRYWALL DEMO FOR JET FLOW METER VAULT | Lump-Sum | 1 | | 7 | DRYWALL DEMO FOR JET FLOW VALVE VAULT | Lump-Sum | 1 | | 8 | DRYWALL DEMO FOR EAST AND WEST INSTRUMENT HOUSES | Lump-Sum | 1 | | 9 | RE-SEAL JOINTS IN TUNNEL LINER | Lump-Sum | 1 | | 10 | REMOVE AND REPLACE 16-INCH AIR VENTALIATION DUCT | Lump-Sum | 1 | | 11 | REMOVE AND REPLACE ELECTRICAL CONDUIT AND CONDUCTORS | Lump-Sum | 1 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.