Active SLED Opportunity · CALIFORNIA · CITY OF HOLLISTER

    C2405 Vactor Truck Dump Station Project

    Issued by City of Hollister
    cityRFBCity of HollisterSol. 8807564119
    Open · 27d remaining
    DAYS TO CLOSE
    27
    due Jun 10, 2026
    PUBLISHED
    Apr 24, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    City of Hollister seeks bids for construction of a concrete vactor truck ramp, associated utilities, demolition, paving, and installation of dumpsters and safety features. Pre-bid conference online 2026-04-30. Bid due 2026-06-10.

    Opportunity details

    Solicitation No.
    8807564119
    Type / RFx
    RFB
    Status
    Active
    Level
    city
    Published Date
    April 24, 2026
    Due Date
    June 10, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    City of Hollister
    Agency
    City of Hollister

    Description

    This project involves the construction of a new cast-in-place concrete vactor truck ramp, foundation, safety rails, access stair, metal chute, new concrete slab for dumpster, two (2) new 30 CY haul away dumpsters with passive dewatering screens, new hose bib, re-route existing process drain and utilities around ramp and slab, new 6” trench drain with connection to existing process drain line, and widening of existing HMA road to ramp. All work is to be done at the places and in the particular locations, of the forms, sizes and dimensions and of the materials and to the lines and as shown and delineated upon the plans and specifications made therefore and approved by the City. **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.AG.USA.2501980.C18019651 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/29/2026 08:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Physical Bid Submission **Owner Organization**: City of Hollister **Reference Number**: 0000421970 **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Recommended | Event date: 04/30/2026 02:00 PM EDT | Location: Online Via Zoom | Event Note: Join Zoom Meeting https://us02web.zoom.us/j/84491225273?pwd=pd9Z6EXG0gKLmeGqmyHpqvzXjp6jyk.1 Meeting ID: 844 9122 5273 Passcode: 792739 **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| | Next Project 1 Next Section 1-General STANDARD Code Description UOM Qty 1 Mobilization/Demobilization Lump-Sum 1 2 Construction Survey Lump-Sum 1 3 Storm Water Pollution Control/SWPPP Lump-Sum 1 Next Section 2-Demolition STANDARD Code Description UOM Qty 4 Vactor Truck Ramp Area Demolition Lump-Sum 1 Next Section 3-Pavement STANDARD Code Description UOM Qty 5 HMA Ton 177 6 Class 2 Aggregate Base Cubic Yard 121 Next Section 4-Concrete STANDARD Code Description UOM Qty 7 Cast-in-Place Concrete Vactor Truck Ramp Lump-Sum 1 Next Section 5-Utilities STANDARD Code Description UOM Qty 8 Trench Drain Lump-Sum 1 9 Yard Piping Lump-Sum 1 Next Section 6-Mechanical STANDARD Code Description UOM Qty 10 30 CY Haul-away Dumpster with Internal Screen Each 2 11 Vactor Truck Ramp Access Staircase Lump-Sum 1 | Next Section 1-General STANDARD Code Description UOM Qty 1 Mobilization/Demobilization Lump-Sum 1 2 Construction Survey Lump-Sum 1 3 Storm Water Pollution Control/SWPPP Lump-Sum 1 | 1 | Mobilization/Demobilization | Lump-Sum | 1 | 2 | Construction Survey | Lump-Sum | 1 | 3 | Storm Water Pollution Control/SWPPP | Lump-Sum | 1 | | Next Section 2-Demolition STANDARD Code Description UOM Qty 4 Vactor Truck Ramp Area Demolition Lump-Sum 1 | 4 | Vactor Truck Ramp Area Demolition | Lump-Sum | 1 | | Next Section 3-Pavement STANDARD Code Description UOM Qty 5 HMA Ton 177 6 Class 2 Aggregate Base Cubic Yard 121 | 5 | HMA | Ton | 177 | 6 | Class 2 Aggregate Base | Cubic Yard | 121 | | Next Section 4-Concrete STANDARD Code Description UOM Qty 7 Cast-in-Place Concrete Vactor Truck Ramp Lump-Sum 1 | 7 | Cast-in-Place Concrete Vactor Truck Ramp | Lump-Sum | 1 | | Next Section 5-Utilities STANDARD Code Description UOM Qty 8 Trench Drain Lump-Sum 1 9 Yard Piping Lump-Sum 1 | 8 | Trench Drain | Lump-Sum | 1 | 9 | Yard Piping | Lump-Sum | 1 | | Next Section 6-Mechanical STANDARD Code Description UOM Qty 10 30 CY Haul-away Dumpster with Internal Screen Each 2 11 Vactor Truck Ramp Access Staircase Lump-Sum 1 | 10 | 30 CY Haul-away Dumpster with Internal Screen | Each | 2 | 11 | Vactor Truck Ramp Access Staircase | Lump-Sum | 1 | | | | Next Section 1-General STANDARD Code Description UOM Qty 1 Mobilization/Demobilization Lump-Sum 1 2 Construction Survey Lump-Sum 1 3 Storm Water Pollution Control/SWPPP Lump-Sum 1 | 1 | Mobilization/Demobilization | Lump-Sum | 1 | 2 | Construction Survey | Lump-Sum | 1 | 3 | Storm Water Pollution Control/SWPPP | Lump-Sum | 1 | | | 1 | Mobilization/Demobilization | Lump-Sum | 1 | | 2 | Construction Survey | Lump-Sum | 1 | | 3 | Storm Water Pollution Control/SWPPP | Lump-Sum | 1 | | Next Section 2-Demolition STANDARD Code Description UOM Qty 4 Vactor Truck Ramp Area Demolition Lump-Sum 1 | 4 | Vactor Truck Ramp Area Demolition | Lump-Sum | 1 | | | 4 | Vactor Truck Ramp Area Demolition | Lump-Sum | 1 | | Next Section 3-Pavement STANDARD Code Description UOM Qty 5 HMA Ton 177 6 Class 2 Aggregate Base Cubic Yard 121 | 5 | HMA | Ton | 177 | 6 | Class 2 Aggregate Base | Cubic Yard | 121 | | | 5 | HMA | Ton | 177 | | 6 | Class 2 Aggregate Base | Cubic Yard | 121 | | Next Section 4-Concrete STANDARD Code Description UOM Qty 7 Cast-in-Place Concrete Vactor Truck Ramp Lump-Sum 1 | 7 | Cast-in-Place Concrete Vactor Truck Ramp | Lump-Sum | 1 | | | 7 | Cast-in-Place Concrete Vactor Truck Ramp | Lump-Sum | 1 | | Next Section 5-Utilities STANDARD Code Description UOM Qty 8 Trench Drain Lump-Sum 1 9 Yard Piping Lump-Sum 1 | 8 | Trench Drain | Lump-Sum | 1 | 9 | Yard Piping | Lump-Sum | 1 | | | 8 | Trench Drain | Lump-Sum | 1 | | 9 | Yard Piping | Lump-Sum | 1 | | Next Section 6-Mechanical STANDARD Code Description UOM Qty 10 30 CY Haul-away Dumpster with Internal Screen Each 2 11 Vactor Truck Ramp Access Staircase Lump-Sum 1 | 10 | 30 CY Haul-away Dumpster with Internal Screen | Each | 2 | 11 | Vactor Truck Ramp Access Staircase | Lump-Sum | 1 | | | 10 | 30 CY Haul-away Dumpster with Internal Screen | Each | 2 | | 11 | Vactor Truck Ramp Access Staircase | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| | Next Section 1-General STANDARD Code Description UOM Qty 1 Mobilization/Demobilization Lump-Sum 1 2 Construction Survey Lump-Sum 1 3 Storm Water Pollution Control/SWPPP Lump-Sum 1 | 1 | Mobilization/Demobilization | Lump-Sum | 1 | 2 | Construction Survey | Lump-Sum | 1 | 3 | Storm Water Pollution Control/SWPPP | Lump-Sum | 1 | | | 1 | Mobilization/Demobilization | Lump-Sum | 1 | | 2 | Construction Survey | Lump-Sum | 1 | | 3 | Storm Water Pollution Control/SWPPP | Lump-Sum | 1 | | Next Section 2-Demolition STANDARD Code Description UOM Qty 4 Vactor Truck Ramp Area Demolition Lump-Sum 1 | 4 | Vactor Truck Ramp Area Demolition | Lump-Sum | 1 | | | 4 | Vactor Truck Ramp Area Demolition | Lump-Sum | 1 | | Next Section 3-Pavement STANDARD Code Description UOM Qty 5 HMA Ton 177 6 Class 2 Aggregate Base Cubic Yard 121 | 5 | HMA | Ton | 177 | 6 | Class 2 Aggregate Base | Cubic Yard | 121 | | | 5 | HMA | Ton | 177 | | 6 | Class 2 Aggregate Base | Cubic Yard | 121 | | Next Section 4-Concrete STANDARD Code Description UOM Qty 7 Cast-in-Place Concrete Vactor Truck Ramp Lump-Sum 1 | 7 | Cast-in-Place Concrete Vactor Truck Ramp | Lump-Sum | 1 | | | 7 | Cast-in-Place Concrete Vactor Truck Ramp | Lump-Sum | 1 | | Next Section 5-Utilities STANDARD Code Description UOM Qty 8 Trench Drain Lump-Sum 1 9 Yard Piping Lump-Sum 1 | 8 | Trench Drain | Lump-Sum | 1 | 9 | Yard Piping | Lump-Sum | 1 | | | 8 | Trench Drain | Lump-Sum | 1 | | 9 | Yard Piping | Lump-Sum | 1 | | Next Section 6-Mechanical STANDARD Code Description UOM Qty 10 30 CY Haul-away Dumpster with Internal Screen Each 2 11 Vactor Truck Ramp Access Staircase Lump-Sum 1 | 10 | 30 CY Haul-away Dumpster with Internal Screen | Each | 2 | 11 | Vactor Truck Ramp Access Staircase | Lump-Sum | 1 | | | 10 | 30 CY Haul-away Dumpster with Internal Screen | Each | 2 | | 11 | Vactor Truck Ramp Access Staircase | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | Mobilization/Demobilization | Lump-Sum | 1 | | 2 | Construction Survey | Lump-Sum | 1 | | 3 | Storm Water Pollution Control/SWPPP | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 4 | Vactor Truck Ramp Area Demolition | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 5 | HMA | Ton | 177 | | 6 | Class 2 Aggregate Base | Cubic Yard | 121 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 7 | Cast-in-Place Concrete Vactor Truck Ramp | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 8 | Trench Drain | Lump-Sum | 1 | | 9 | Yard Piping | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 10 | 30 CY Haul-away Dumpster with Internal Screen | Each | 2 | | 11 | Vactor Truck Ramp Access Staircase | Lump-Sum | 1 |

    Key dates

    1. April 24, 2026Published
    2. June 10, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.