Active SLED Opportunity · FLORIDA · BOYNTON BEACH

    Campanelli Blvd. - Gateway Blvd. Stormwater Cured-In-Place Piping Project

    Issued by Boynton Beach
    cityIFBBoynton BeachSol. BAT-Boynton_Beach-26-051B
    Open · 20d remaining
    DAYS TO CLOSE
    20
    due Jun 23, 2026
    PUBLISHED
    Posting date
    JURISDICTION
    Boynton Beach
    city
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    The City of Boynton Beach seeks bids for stormwater system rehabilitation using cured-in-place pipe lining, including pipe cleaning and CCTV inspections. Bids due June 23, 2026, with a non-mandatory pre-bid conference on June 8, 2026.

    Opportunity details

    Solicitation No.
    BAT-Boynton_Beach-26-051B
    Type / RFx
    IFB
    Status
    Open
    Level
    city
    Published Date
    Due Date
    June 23, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    Boynton Beach
    State
    Florida
    Agency
    Boynton Beach

    Description

    ITB NO. 26-051B Campanelli Blvd. - Gateway Blvd. Stormwater Cured-In-Place Piping Project Electronic Invitation To Bid (ITB’s) shall be received by the e-procurement system up until June 23, 2026; No Later Than 3:00 P.M. (Local Time) ; unless specified otherwise and may not be withdrawn within ONE HUNDRED TWENTY (120) days after such date and time. All ITB’s received will be publicly opened and acknowledged of receipt by the City’s Procurement Department via the e-procurement system electronically. The e-procurement system does not permit ITB’s received after the assigned date and time. For the above reasons, it is recommended that the proposer(s) allow sufficient time to complete your online Submission and to resolve any issues that may arise. ATTENTION ALL INTERESTED BIDDERS: To obtain documents online, please visit Boynton-beach.bidsandtenders.net. and https://boynton-beach.bidsandtenders.net/Module/Tenders/en .  Documents are not provided in any other manner. SCOPE OF SERVICES: The City of Boynton Beach (“City”) Utilities Department is requesting sealed bids from qualified contractors for the installation of a cured-in-place pipe liner using a resin-impregnated flexible tube method that is formed to the original conduit by use of a hydrostatic head. Rehabilitations will be made to the City’s Stormwater System and generally consist of, but are not limited to, performing cleaning of the existing stormwater pipes; an internal pre-rehabilitation closed-circuit television (CCTV) inspection; furnishing and installing a cured-in-place pipe (CIPP) mainline liner; preparation of inspection reports; and performing internal closed-circuit television (CCTV) post-rehabilitation final inspections. The City reserves the right to award to more than one Bidder. The Bidder(s) shall act as an independent contractor and not as an employee of the City. Questions related to this ITB are to be submitted to the Purchasing representative through the e-procurement system only by clicking on the “Submit a Question” button for this specific solicitation. PRE-BID CONFERENCE: A NON-MANDATORY Pre-Bid Conference & Site Visit is scheduled for June 8, 2026, at 9:00 A.M. to be held at City of Boynton Beach City Hall Room 115, 100 East Ocean Avenue, Boynton Beach, Florida 33435. The purpose of this meeting is to provide a forum for all concerned parties to discuss the proposed project, answer questions on the solicitation document, provide instructions for submitting bid packages, and discuss other relevant issues. In the event that any discussions or questions at the pre-bid meeting require, in the City’s opinion, official additions, deletions, or clarifications of the solicitation or any other document, the City will issue an addendum to this ITB, as the City determines is appropriate. No oral representation or discussion taking place at the pre-bid meeting will be binding or may be relied upon by any person or entity. All questions prior to the pre-bid meeting should be submitted in writing through the City’s e-procurement system by the deadline for questions. PUBLIC RECORDS DISCLOSURE: Pursuant to Florida Statutes §119.071, sealed Proposal responses received by the City in response to an Invitation to bid are exempt from public records disclosure requirements until thirty (30) days after the opening of the Proposals unless the City announces intent to award sooner. If the City rejects all Responses submitted in accordance with an Invitation To Bid, and the City concurrently provides notice of its intent to reissue the competitive solicitation, the rejected Responses remain exempt from public disclosure until such time as the City provides notice of a decision or intended decision concerning the competitive solicitation or until the City withdraws the reissued competitive solicitation. A Bid response, or reply is not exempt for longer than twelve (12) months after the initial City notice rejecting all Bids.

    Key dates

    1. June 23, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.