SLED Opportunity · GEORGIA · GEORGIA
AI Summary
Renovation project at Campbell High School Stadium including press box replacement, ADA ramp renovations, concrete bleacher repairs, and protective coating application.
The project includes renovations at the Campbell High School Stadium (home side), including demolition and replacement of the existing two-story press box with a larger, single-story press box, including associated new structure. Additional scope includes renovations to the existing ADA ramp, and repairs and improvements to the existing concrete bleachers and application of a protective coating to select surfaces.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.