Pierce County seeks bids for asphalt overlay and pavement grinding on Canyon Road East from 138th to 160th Street East, including ADA-compliant curb ramp upgrades. Electronic bid submission is required via OpenGov Procurement. Proposals due by April 22, 2026.
This project provides for the improvement of Canyon Road E by grinding 2” asphalt concrete pavement and overlaying 2” hot-mix asphalt from 138th Street E to 160th Street E. Work will include curb ramp upgrades to meet the American with Disabilities Act (ADA), and other work in accordance with and as described in the Plans and Specifications.
Addendum#1
Pierce County is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid.
(Please refer to all attachments for a more detailed scope of work...)
Please Upload your COMPLETE Proposal here.
Please provide a brief, one to two paragraph, description of the project.
Q (bid item 61): Please provide a detail/plan for the "replace riser section and adjust catch basin" item. include elevations if available
A: For complete answer to this question, please see the attached pdf in the "Addenda & Notices" tab. Photos included in the pdf. An Addendum will be issued shortly in response to the question.
Q (Survey): With no separate “Survey” bid item included, is the County providing survey services beyond those associated with the ADA Features bid item? If so, please clarify what survey services will be provided.
A: The only staking to be provided by the Contractor as a bid item will be for ADA features. All other staking shall be requested by the contractor and provided by Pierce County in accordance with the Contract Provisions, Specifications, and Plans.
Q (sidewalk/ada ramps): please provide a profile detail or thickness for sidewalks and ramps.
A: Per Pierce County Standard Drawings, sidewalk shall be 4” thick and curb ramps shall be 6” thick.
Q (bid item 60 measurement clarification): Please confirm whether HMA, roadway excavation, and curb and gutter work required as part of Adjust Catch Basin operations will be measured and paid under their respective bid items, or if they are included in the Adjust Catch Basin item
A: The road ex, HMA, remove curb, new curb will all be paid for under their separate bid items. See 7-05 for Adjust Catch Basin specifications.