Active SLED Opportunity · FLORIDA · CLAY COUNTY

    Carl Pugh Park - Drainage Improvements

    Issued by Clay County
    countyRFBClay CountySol. 229465
    Open · 3d remaining
    DAYS TO CLOSE
    3
    due Apr 27, 2026
    PUBLISHED
    Mar 26, 2026
    Posting date
    JURISDICTION
    Clay County
    county
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    Clay County seeks licensed contractors for drainage improvements at Carl Pugh Park to address flooding issues. Scope includes grading, stormwater pond construction, drainage installation, and site restoration. Mandatory pre-bid meeting on April 9, 2026. Bids due April 27, 2026. Award based on lowest responsive and responsible bid.

    Opportunity details

    Solicitation No.
    229465
    Type / RFx
    RFB
    Status
    open
    Level
    county
    Published Date
    March 26, 2026
    Due Date
    April 27, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    Clay County
    State
    Florida
    Agency
    Clay County

    Description

    The Clay County Board of County Commissioners (County) is requesting bids from qualified and licensed Contractors for the drainage improvements required at Carl Pugh Park located at 317 S West Street, Green Cove Springs, FL 32043 per the plans and specifications associated with this Request for Bid (RFB).

    Bidders shall submit all inquiries regarding this RFB in the "Question and Answer" tab of the RFB. See "Inquiries/Questions" in the "Instructions to Bidders" below for more information.

    Bidders are prohibited from contacting, by any means, whether orally, telephonically, electronically or in writing, any member of the Board, any County employee, including the County Manager, the County Attorney or the Commission Auditor, any member of the designated Evaluation Committee or any agent of the County regarding the Request for Bids in any respect during the Request for Bid Period. The Request for Bid Period during which no contact may occur commences from the date of publication of the notice of a Request for Bids and ends upon a Bid Decision becoming final, i.e. after the notice of bid protest period of 72 hours has expired. However, in the event of a notice of protest, the no contact rule continues in place during the Protest Period and does not end until a resolution of the protest has occurred and become final. The following exceptions exist to the no-contact rule:

    1. Inquiries may be submitted to the Purchasing Department if specifically provided in the Request for Bids;
    2. Pre-bid conferences provided for in the Request for Bids; and
    3. Formal presentations by Bidders to the designated Evaluation Committee or to the Board or any committee thereof specifically contemplated in the Request for Bids.

    The Board reserves the right and power to reject any and all Bids without cause and to waive technical and non-technical or non-material defects in the Request for Bids or submittal of any Bid, and in its discretion to re-advertise the Request for Bids. The Board reserves the right to award Request for Bids which would be in the Best Interest of the County. Interested vendors are advised that the Clay County Board of County Commissioners has a local preference policy and Buy American policy. The complete policy for both can be viewed at: https://www.claycountygov.com/government/purchasing/vendor-information.

    FOLLOWING THE BID OPENING AND TABULATION, A “NOTICE OF INTENT TO AWARD BID” OR A “NOTICE OF REJECTION OF ALL BIDS” WILL BE POSTED ON THE INTERNET AT:https://procurement.opengov.com/portal/claycounty?status=all.

    THIS WEBPAGE CAN ALSO BE ACCESSED FROM THE HOMEPAGE OF THE COUNTY’S WEBSITE AT:https://www.claycountygov.com/government/purchasing/formal-bid-solicitations.

    PROSPECTIVE BIDDERS ARE NOTIFIED THAT THE FAILURE TO INCLUDE A PROPER BID BOND OR OTHER SECURITY APPROVED UNDER THE COUNTY’S PURCHASING POLICY, IF REQUIRED FOR THIS REQUEST, WILL RESULT IN REJECTION OF THE BID AND SHALL, AS WELL AS THE FAILURE TO FILE A WRITTEN NOTICE OF PROTEST AND TO FILE A WRITTEN PETITION INITIATING A FORMAL PROTEST PROCEEDING WITHIN THE TIMES AND IN THE MANNER PRESCRIBED IN CHAPTER 8, SECTION I OF THE COUNTY’S PURCHASING POLICY SHALL, CONSTITUTE A WAIVER OF THE RIGHT TO PROTEST THE BID REQUEST, ANY ADDENDUM THERETO, OR THE BID DECISION, AS APPLICABLE, AND TO INITIATE A FORMAL PROTEST PROCEEDING UNDER THE PURCHASING POLICY. THE COUNTY’S PURCHASING POLICY CAN BE VIEWED AT THE COUNTY’S WEBSITE BY FOLLOWING THE APPROPRIATE LINKS FROM THE HOMEPAGE ADDRESS SET FORTH ABOVE.

    IF A PROSPECTIVE BIDDER IS IN DOUBT WHETHER THIS REQUEST REQUIRES A BID BOND, SUCH PROSPECTIVE BIDDER IS SOLELY RESPONSIBLE FOR MAKING APPROPRIATE INQUIRY.

    THE BOARD RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS WITHOUT CAUSE AND TO WAIVE TECHNICAL AND NON- TECHNICAL OR NON-MATERIAL DEFECTS IN THE REQUEST OR SUBMITTAL OF ANY BIDS.

    A PERSON OR AFFILIATE WHO HAS BEEN PLACED ON THE CONVICTED VENDOR LIST FOLLOWING A CONVICTION FOR A PUBLIC ENTITY CRIME MAY NOT SUBMIT A BID ON A CONTRACT TO PROVIDE ANY GOODS OR SERVICES TO A PUBLIC ENTITY, MAY NOT SUBMIT A BID ON A CONTRACT WITH A PUBLIC ENTITY FOR THE CONSTRUCTION OR REPAIR OF A PUBLIC BUILDING OR PUBLIC WORK, MAY NOT SUBMIT BIDS ON LEASES OF REAL PROPERTY TO A PUBLIC ENTITY, MAY NOT BE AWARDED OR PERFORM WORK AS A CONTRACTOR, SUPPLIER, SUBCONTRACTOR, OR CONSULTANT UNDER A CONTRACT WITH ANY PUBLIC ENTITY, AND MAY NOT TRANSACT BUSINESS WITH ANY PUBLIC ENTITY IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO FOR A PERIOD OF 36 MONTHS FROM THE DATE OF BEING PLACED ON THE CONVICTED VENDOR LIST.

    Background

    Carl Pugh Park currently has extensive flooding and standing water causing playing fields and spectator areas inoperable for an extended amount of time during and after minor rainfall. Proposed improvements will address issues identified through multiple field reviews and park operators. The design of proposed improvements prioritizes both functionality and ease of maintenance.

    Project Details

    • Reference ID: 25/26-041
    • Department: Capital Projects
    • Department Head: Ed Dendor (Director of Capital Projects)

    Important Dates

    • Questions Due: 2026-04-13T20:00:00.000Z
    • Answers Posted By: 2026-04-17T20:30:00.000Z
    • Pre-Proposal Meeting: 2026-04-09T15:00:50.589Z — A Mandatory Pre-Bid Meeting will be held Onsite In-Person at: Carl Pugh Park 317 S West Street, Green Cove Springs, FL 32043 (Meet at the Main Park Entrance). Please electronically RSVP to this Mandatory Pre-Bid by clicking the "Events RSVP" drop down located next to "Draft Response" at the top of this project.

    Meetings & Milestones

    EventDateLocation
    Estimated Date for Recommendation to Board of County Commissioners 2026-05-12T20:00:00.000ZClay County Administration Building Fourth Floor, Main Board Room 477 Houston Street Green Cove Springs, Florida 32043
    Bid Open2026-04-28T13:00:00.000ZClay County Administration Building 4th Floor, Conference Room B 477 Houston Street Green Cove Springs, Florida 32043

    Addenda

    • Official Notice #1: Mandatory Pre-Bid Meeting (released 2026-04-09T17:55:25.146Z) —

      Attached is the sign-in-sheet from the Mandatory Pre-Bid meeting that was held at the following date / time and location:

      Thursday, April 9,2026, 11:00am

      Carl Pugh Park

      317 S West Street

      Green Cove Springs, FL 32043

    Evaluation Criteria

    • Purpose

      The Clay County Board of County Commissioners (County) is requesting bids from qualified and licensed Contractors for the drainage improvements required at Carl Pugh Park located at 317 S West Street, Green Cove Springs, FL 32043 per the plans and specifications associated with this Request for Bid (RFB).

      Carl Pugh Park currently has extensive flooding and standing water causing playing fields and spectator areas inoperable for an extended amount of time during and after minor rainfall. Proposed improvements will address issues identified through multiple field reviews and park operators. The design of proposed improvements prioritizes both functionality and ease of maintenance.

    • Instruction to Bidders:

      The term 'RFB' (Request for Bids) used throughout this solicitation is intended to be all-inclusive, encompassing competitive processes, such as Request for Bids (RFB), Request for Proposal (RFP), Request for Qualifications (RFQ), Invitation to Negotiate (ITN), Best Final Offer, or Design-Build, and any similar solicitations. These instructions are derived from Clay County's purchasing policy.

    • Mandatory Pre-Bid Meeting

      A Mandatory Pre-Bid Meeting will be held on Thursday, April 9, 2026, at Carl Pugh Park located at 317 S West Street, Green Cove Springs, FL 32043 with a start time of 11:00 AM.

      **Please meet at the Main Park Entrance **

      Attendees from the public are required to sign in upon arrival, with the sign-in sheet provided by a Purchasing Department representative. Once the sign-in sheet has been collected, the Pre-Bid Meeting will officially commence. Please note that no additional attendees will be allowed to sign in or participate in the meeting after the sign-in sheet has been collected.

    • Response to Request for Bids:

      The County posts and distributes information pertaining to its RFB's on the County’s e-Procurement Portal. In order to submit a Bid to this RFB the Bidder must be registered with the County’s e-Procurement Portal.

      The Bid, containing all required documents, must be received by 4:00 pm on Monday, April 27, 2026 electronically. Any required uploaded documents should be in PDF format and be labeled correctly, unless the Bid states otherwise. The PDF document should be titled with the Bidders name and RFB number.

      THE COUNTY NOR THE PUBLIC PORTAL PLATFORM WILL ACCEPT LATE SUBMITTALS

      The Bidder should retain a copy of all Bid documents for future reference.

      All Bids should be submitted by an officer or employee having authority to bind the Bidder.

    • Scope of Work
      1. Improvements, costs of permits, labor, and equipment for this Request for Bid (RFB) shall include, but not limited to:
        1. Grading of baseball outfields.
        2. Construction of a stormwater pond.
        3. Furnish and install of yard drains and piping to improve conveyance of runoff.
        4. Site restoration.
      2. Contractor shall be responsible for pedestrian and traffic control throughout all phases of the project.
      3. Contractor shall be responsible for any required coordination with the General Contractor performing work on the US 17, Walnut Street and Palmetto Avenue Transportation project adjacent to Carl Pugh Park.
    • Addenda:

      All Addenda language issued shall become part of the RFB and Contract documents, and receipt of Addenda must be acknowledged by the Bidder. If issued, Bidders will receive addenda notifications to their email once they have followed the RFB. Failure to acknowledge Addenda which have no effect on the competitive nature of the Bidding process may be a waivable deviation at the County’s sole discretion. Ultimately, it is the sole responsibility of each Bidder to periodically check the County’s e-Procurement Portal for any Addenda.

    • Addenda Distribution:

      All Addenda distributed subsequent to the initial distribution of the RFB shall be posted in the County’s e-Procurement Portal. It is the responsibility of the Bidder to verify if any Addendum(s) have been issued prior to submitting a Bid to an RFB. No Addendum shall be issued later than five (5) working days prior to the scheduled Bid Opening date.

    • Contractor and Subcontractor Requirements

      1. The Contractor shall be licensed to perform all work listed in the Scope of Work provided.

      2. Contractor shall obtain all permits to complete the project in accordance with the contract documents.

      3. All work will be performed in accordance with the most applicable state and local regulations.

      4. The Contractor shall own or have full access to the appropriate personnel and equipment to complete the project requested.

      5. The County reserves the right to approve all subcontractors for this contract. If subcontractors are to be utilized, the subcontractors must possess an active and valid license issued by the Florida Department of Business and Professional Regulation in the appropriate category. Subcontractors may be added during the contract period only with PRIOR WRITTEN PERMISSION from the County, and only for reasonable cause, as judged by the County. Responsibility for the performance of the contract remains with the main Contractor exclusively.

      6. The Contractor and subcontractors may be requested to provide a list of equipment with identification (i.e. serial #, VIN, etc.), personnel with their position (e.g. foreman, laborer, etc.), and percentage of work performed.

      7. Contractors must have been in business for a minimum of five (5) years doing similar work

       

    • Additional Evaluation:
      The County reserves the right to request any additional information from Bidders after Bid Opening and before award as it may be necessary to assist in review and evaluation of any Bid prior to submittal of a recommendation for award to the Board of County Commissioners.

       

    • Site Inspections

      It is incumbent upon all Bidders to examine the site and insure that they are aware of all conditions that may affect the contract work. The County will not be responsible for conclusions made by the Contractor. No claims for additional compensation will be considered on behalf of any Contractor, subcontractor, materials suppliers or others on account of that person’s failure to be fully informed of all requirements of all parts of this RFB.

    • Americans with Disabilities Act:

      In accordance with the Americans with Disabilities Act, any person needing accommodations to participate in this matter should contact Clay County Risk Management by mail at P.O. Box 1366, Green Cove Springs, Florida 32043, or by telephone at (904) 679-8596, no later than three (3) days prior to the hearing or proceeding for which this notice has been given. Deaf and hard-of-hearing persons can access the telephone number by contacting the Florida Relay Service at 1-800-955-8770 (Voice) or 1-800-955-8771 (TDD).

    • Award:

      Bid Awards for Request for Bids (RFB), where competitive price offer is the only determining factor, shall be awarded based on the lowest responsive and responsible bid.  Awards for alternative competitive processes, such as a Request for Proposal (RFP), Request for Qualification (RFQ), Invitation to Negotiate (ITN), Best Final Offer, or Design-Build, should be based on evaluation criteria specified in the request, in addition to price, to determine what is in the Best Interest of the County.

       

      The term “Lowest Responsive Bid” shall mean the lowest Bid price submitted by a Responsive and Responsible Bidder.

       

      The term “Responsive Bidder” means a Bidder that has submitted a Bid, Proposal or reply that conforms in all material respects to the Request for Bids.

       

      The term “Responsible Bidder” means a Bidder who has the capability in all respects to fully perform the Contract requirements and the integrity and reliability that will assure good faith performance.

       

      The County reserves the right to make an award either in part or completely, and/or to accept the bid that, in its judgment, will be in the best interest of the County; providing best value to the County with price, technical, and other applicable factors considered.

       

      The County Reserves the right to award to multiple Bidders.

    • Work Hours

      Workdays and hours – Normal work hours of Monday through Friday, 7:30 a.m. to 5:00 p.m. unless approved by the County Project Manager or designee. 

      Any work performed outside of the normal County business hours will require prior County approval and payment to the County for all expenses incurred by the County may be required.

    • Bid Bond:

      If provided for in the RFB Advertisement, Introduction Timeline, or Supplier Questionnaire Section; Bids require a five (5%) percent bid bond and may not be withdrawn after the scheduled opening time for a period of thirty (30) days. The term bid bond shall include bonds or cashier or certified checks payable to the County.

      Any Cashier or Certified Check must be uploaded with the Bid and the original Cashier or Certified Check must be received by the Purchasing Department no later than two (2) business days after the RFB due date.

      The following are exempt from the Bid Bond requirement:

       

      a.   SHIP - Bidders bidding on SHIP rehabilitation projects are exempt from the Bid Bond.  

       

      b.    Fixed Unit Price - Bidders bidding on Contracts with a fixed price, or any other type of Contract that does not commit the Board to an actual exchange transaction (purchase) but rather seeks only a Fixed Unit Price Commitment from a Bidder in the event a future purchase decision is made. 

       

      A prospective Bidder is solely responsible for determining whether a particular Request for Bids requires a Bid Bond, and for resolving any doubt by making appropriate inquiry.

    • Permit & Fees

      The Contractor shall comply with all applicable State and local laws, ordinances, codes, and regulations. The Contractor is required to familiarize themselves with all permits required that pertain to the Scope of Work specified in this RFB. If a County permit is required, this project is not exempt from permit fees and permit fees must be paid to the County Building Department by the Contractor.

      For questions about City of Green Cove Springs permitting please contact:

      City of Green Cove Springs Building Division

      Phone: (904) 297-7500

      Email: building@greencovesprings.com

      Website: https://www.greencovesprings.com/192/Building-Division

      All applicable permits, fees, licenses, and final County and municipality inspections are the responsibility of and will be paid for by the Contractor as specified in the plans.

      All other permits, assessments, fees, bonds, and other charges as necessary to perform and complete the work of the awarded Contract are the responsibility of and will be paid for by the Contractor, including any related inspection fees. Utility service connection fees shall be paid for by the County.

    • Workmanship

      Where not more specifically described in this document, workmanship shall conform to all of the methods and operations of best standards and accepted practices of the trade or trades involved, and shall include all items of fabrication, construction or installation regularly furnished or required for completion of the services.

       

    • Bid Errors:

      In case of unit price Bid items, if an error is committed in the extension of an item, the unit price as shown in the Bid response will govern. Errors between any sum, computed by the Bidder, and the correct sum thereof will be resolved in favor of the correct sum. Bidders are expected to examine the RFB in its entirety. Failure to do so will be at the Bidder's risk.

    • Self-Performed Work

      The awarded Contractor is required to self-perform with its own workforce a minimum of forty-percent (40%) of the overall awarded Contract.

    • Bid Preparation Costs:

      By submission of a Bid, the Bidder agrees that all costs associated with the preparation of Bid will be the sole responsibility of the Bidder and shall not be borne by the County. The Bidder also agrees that the County bears no responsibility for any costs associated with the preparation of their Bid and/or any administrative or judicial proceedings resulting from the RFB process.

    • Compliance with Occupation Safety and Health Act

      The Contractor warrants that the product(s) and/or service(s) supplied to Clay County shall conform in all respects to the standards set forth in the Occupational Safety and Health Act (OSHA) of 1970 as amended and the failure to comply will be considered a breach of contract. Clay County shall be held harmless against any unsafe conditions and contractor employee incidents.

      Contractor certifies that all material, equipment, services, etc., furnished in this Bid meets all OSHA requirements for the applicable Sectors. Contractor further certifies that, if the successful Bidder, and the material, equipment, service, etc., delivered or provided is subsequently found to be deficient in any OSHA requirement in effect on date of delivery or service fulfillment date, all costs necessary to bring the material, equipment, service, etc., into compliance with the aforementioned requirements shall be borne by the Bidder. All Personal Protective Equipment used by the Contractor and their employees shall be ANSI certified and meet OSHA standards.

    • Bid Protests:

      Any person who is adversely affected by a RFB, by any Addendum thereto, or by a Bid Decision may file with the County Manager a written notice of Bid Protest no later than 4:30 p.m. on the third Business Day immediately following the date notice is published, with respect to a Request for Bids; no later than 4:30 p.m. on the third Business Day immediately following the date of issuance, with respect to any Addendum; and within 72 hours after the posting of the notice, exclusive of hours occurring during days that are other than Business Days, with respect to a Bid Decision. Full bid protest procedures can be found in the County Purchasing Policy, Chapter 8 Section (I) which is attached hereto or can be found on the County’s website at: https://www.claycountygov.com/government/purchasing/vendor-information

    • Clean up & Restoration of Site

      Contractor shall remove all debris from site and dispose of the debris appropriately at the Contractors expense.

      Contractor shall maintain work site in a safe manner, and daily clear construction debris.

    • Business Registration Requirement:

      In accordance with Chapters 605-623, Florida Statutes, in order to do business in the State of Florida, corporations (and other business designations) are required to be registered and in good standing with the Department of State, Department of Corporations. To be eligible to receive a contract and/or purchase order registration must be accomplished prior to the initial posting indicating intent to award to that Supplier. Failure to be registered may be cause for disqualification. Contact the Department of Corporations at (850) 245-6000. Online-filing is available at: http://dos.myflorida.com/sunbiz

    • Cancellation of RFB:

      Clay County reserves the right to cancel a RFB at any time prior to approval of the award. The decision to cancel a RFB cannot be the basis for a protest under the Bid Protest Procedures as referenced herein.

    • Damage to Public or Private Property

      The Contractor is responsible for anything damaged due to the direct result of installation or construction. Remove all debris from site and dispose of appropriately at Contractor expense. If property (public or private) is damaged while Contractor is performing work specified or is removed for the convenience of the work, it shall be repaired or replaced at the expense of the Contractor in a manner acceptable to the County prior to the final acceptance of the work. Contractor will be responsible for applying and securing any permits that may be required to complete such repairs.

      Contractor must provide protection necessary to prevent damage to property being repaired or replaced.

      If the work site has any pre-existing damage, the Contractor shall notify the County Project Manager in writing. Failure to do so shall obligate the Contractor to make repairs per the above section. Any damage to property (public or private) caused by the action of the Contractor shall be repaired or replaced at the expense of the Contractor to the satisfaction of the County. Failure to restore said property within five (5) working days following notification will result in a deduction from the final payment invoice. All damages which occur as a result of the Contractor's application of materials shall be remedied by the Contractor at no additional cost to the County. Repairs made as a result of damage must be guaranteed for a period of thirty (30) days. Should the replacement be damaged within the thirty (30) day period, the Contractor shall replace the materials continually until the area is re-established.

      Should the County have any expenses incurred due to the Contractor not restoring the property/damage within said time, any appropriate labor, material, and/or equipment use or rental to restore damaged property to its original condition will be deducted from the final Invoice prior to a payment being made.

    • Unsatisfactory Equipment and/or Services

      The County will discuss all instances of unacceptable equipment and/or services with the awarded Contractor. This shall be immediately rectified by the Contractor at no charge to the County, to include any labor and materials as it may apply.

      During this time, the County may suspend service with the Contractor until the problem(s) are corrected or may elect to use another company on an emergency basis. A record of failure to perform or of an unsatisfactory performance may result in supplier debarment.

    • Conflict of Interest:

      The award hereunder is subject to Chapter 112, Florida Statutes. All Bidders must disclose with their Bid any personal or organizational conflicts of interest pursuant to Section 112.313, Florida Statutes, the name of any officer, director, or agent who is also an employee of the Clay County Board of County Commissioners. Further, all Bidders must disclose the name of any Clay County Board of County Commissioners employee who owns, directly or indirectly, an interest of the Bidder or any of its branches.

    • Payment

      The Contractor may request payment no more than once monthly, based on the amount of work completed. All partial estimates and payments found to be in error shall be subject to correction in the estimates and payments subsequent thereto, and in the final estimate and payment. Payments will be made in accordance with the Florida Local Government Prompt Payment Act.

      The amount of such payments shall be the total value of the project work completed to the date of the estimate, based on the quantities and the Contract unit and/or lump sum prices, less an amount retained and less payments previously made. The amount retained shall be determined in accordance with Section 255.078, Florida Statutes.

    • Contractor Qualifications and Requirements:

      All Contractors must be certified or registered pursuant to Chapter 489, Florida Statutes, or hold a Clay County certification under Article III of Chapter 7 of the Clay County Code, as applicable, at the time of responding to a RFB and must submit evidence of such at the time of submission of any Bid.

      The following licensing requirements shall apply when the applicable Florida statute mandates specific licensing for Contractors engaged in the type of work covered by this solicitation. State of Florida, Department of Professional Regulation, Construction Industries Licensing Board and licensed by other federal, state, regional, county or municipal agencies having jurisdiction over the specified construction work. Said licenses shall be in the Bidder's name as it appears on their Bid. Bidders shall supply a copy of each applicable license showing the appropriate license numbers, with expiration dates as required by the County. Failure to hold and provide proof of proper licensing, certification and registration may be grounds for rejection of the Bid and/or termination of the Contract. Sub-Contractors Contracted by the Prime Contractor shall be licensed in their respective fields to obtain construction permits from the County. Said license must be in the name of the Sub-Contractor.

      The following licensing requirements shall apply when applicable (Contractor Prequalification):
      Florida Law and Rules of the State of Florida, Department of Transportation, require Contractors to be prequalified with the Department in order to bid for the performance of road, bridge, or public transportation construction contracts greater than $250,000.00. The Contractor Prequalification process results in the issuance of a Certificate of Qualification for each successful applicant which lists the approved work classes and the Maximum Capacity Rating in dollars. It is the responsibility of potential bidders to review the requirement listed on the Pre-Qualification Form and meet the qualifications listed at: https://www.fdot.gov/contracts/prequal-info/prequalified.shtm

      Contractors not meeting the applicable work types associated with the scope of the work may utilize Sub-Contractors to assist with meeting the requirement of all necessary prequalification work classes.

    • Copyright Restrictions:

      Both the County seal and the County logo are registered for a copyright. Neither the Clay County seal nor the logo may be used or provided to non-Clay County government users for use on company Bids, presentations, etc.

    • Warranty

      The Contractor shall provide a warranty for all workmanship and materials for a period of two (2) years unless a longer manufacture warranty/guarantee time is given or specified elsewhere in the plans and specifications associated with this RFB. Warranty will begin from the date of Substantial Completion.

    • Term

      Substantial Completion shall be accomplished within one hundred twenty (120) days from Notice to Proceed.

      The Contractor shall achieve Final Completion of the Project no less than thirty (30) calendar days after the delivery of the Punch List by the County to the Contractor.

    • Deviations:

      Bidders are hereby advised the County will only consider Bids that meet the RFB requirements in its entirety. In instances where a deviation is stated in the Bid, said Bid will be subject to rejection by the County.

    • Liquidated Damages

      The Contractor shall be assessed Liquidated Damages (LD) of $500.00 for each day past final completion date set by the contract.

    • Drug-Free Workplace

      Pursuant to Section 287.087, Florida Statutes, whenever two or more bids, proposals, or replies that are equal with respect to price, quality, and service are received by the state or by any political subdivision for the procurement of commodities or contractual services, a bid, proposal, or reply received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. In order to have a drug-free workplace program, a business shall:

      (1) Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.

      (2) Inform employees about the dangers of drug abuse in the workplace, the business’s policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.

      (3) Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection (1).

      (4) In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of chapter 893 or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than 5 days after such conviction.

      (5) Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee’s community by, any employee who is so convicted.

      (6) Make a good faith effort to continue to maintain a drug-free workplace through implementation of this Florida Statute.

    • Execution of Contract:

      The awarded Bidder may be required to sign a written Contract. Said Contract will evidence in written form the agreement between the parties. The County permits the use of electronic signatures between the County, Suppliers, other agencies, customers, and members of the public in carrying out transactions by entry into Contracts, memorandums, or other types of agreements. Electronic signatures shall have the same force and effect as manual written signatures. Each person signing on behalf of the parties to a Contract must have full authority to execute the Contract on behalf of such party. The use of electronic signatures does not limit the County’s right or option to conduct a transaction in non-electronic form nor does it affect the obligation to have original hand-written signatures when required.

    • Performance Evaluation

      A work performance evaluation will be conducted periodically to ensure compliance with the Contract.

       

    • Cancellation of Contract

      If the awarded Contractor fails to maintain acceptable product quality or to perform adequately in accordance with the terms, conditions and specifications established in this Request for Bid, the County reserves the right to cancel the contract upon thirty (30) days written notice to the Contractor.

    • Indemnification:

      Construction Services (per FS 725.06):

      To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the County including its officers and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney’s fees, to the extent caused by the negligence, recklessness or intentional wrongful misconduct of the Contractor and persons employed or utilized by the Contractor in the performance of this Agreement.

       

      Design Services (per FS 725.08):

      To the fullest extent permitted by law and in accordance with Section 725.08, Florida Statutes, the Consultant shall indemnify and hold harmless the County, including its officers and employees, from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorney’s fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Consultant and other persons employed or utilized by the Consultant in the performance of the Agreement.

       

      Non-construction Services:

      The Contractor shall promptly defend, indemnify, and hold harmless the County, and its directors, officers, employees, representatives, agents, boards and commissions from and against any and all liabilities, demands, claims, suits, losses, damages, causes of action, fines, orders, and/or judgments, either at law or in equity, including court costs, attorneys’ fees, professional fees, or other expenses, that may hereafter at any time be made or brought by anyone on account of personal or bodily injury, damage to or loss of property, loss of monies, death, or other loss, arising out of, by reason of, or in any manner connected with or related to the Services provided under this Agreement.

    • Inquiries/Questions:

      Bidders shall submit all inquiries regarding this RFB in the "Question and Answer" Tab of the RFB via the County’s e-Procurement Portal, located at https://procurement.opengov.com/portal/claycounty. Please note the deadline for submitting inquiries listed in the the RFB’s Timetable. Once issued, Bidders will receive addenda notifications to their email once they have followed the RFB.

      For more information/instruction on how to submit an inquiry/question, please visit: https://opengov.my.site.com/support/s/article/12c62371-147b-45f4-9bcd-cf2ce5f58259

    • Value Engineering

      The County reserves the right to engage in value engineering discussions prior to the award of the RFB.

      The County will give the lowest qualified Bidder the opportunity to determine if viable options exist to meet the budget threshold without substantially reducing the scope of the project as designed and solicited.

    • Additional Services

      If the County and/or awarded Contractor identifies any additional services to be provided by Contractor that are not covered under the Agreement but are beneficial to the County, such additional services shall be mutually negotiated between the County and the Contractor.

    • Insurance Requirements:

      Awarded Bidder has 10 days from the execution of the Agreement to provide a Certificate of Insurance that is compliant with the required coverage.

      a. Commercial General Liability

      Coverage must be afforded under a Commercial General Liability policy with limits not less than:

      • $1,000,000 each occurrence and $2,000,000 aggregate for Bodily Injury, Property Damage, and Personal and Advertising Injury (project specific aggregate may be required for construction projects)
      • $1,000,000 each occurrence and $2,000,000 aggregate for Products and Completed Operations
      • $50,000 each occurrence for Damage to Rented Premises
      • $5,000 Medical Expenses (any one person)

      Commercial and General Liability policy must include coverage for contractual liability and independent contractors.

      b. Business Automobile Liability

      Coverage must be afforded for all Owned, Hired, Scheduled, and Non-Owned vehicles for Bodily Injury and Property Damage in an amount not less than $1,000,000 combined single limit each accident. If the Bidder does not own vehicles, the Bidder shall maintain coverage for Hired and Non-Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or separate Business Auto Liability policy.

      c. Workers’ Compensation and Employer’s Liability

      Any person or entity performing work for or on behalf of the County must provide Workers’ Compensation and Employer’s Liability insurance in limits not less than:

      ● Workers Compensation Statutory limits

      ● Employers Liability $100,000 Each Accident

      $500,000 Disease Policy

      $100,000 Disease-Each Employee

      Exceptions and exemptions may be allowed by the County Manager, if they are in accordance with Florida Statutes.

      The Bidder waives, and the Bidder shall ensure that its insurance carrier waives, all subrogation rights against the County, its employees, agents, boards, and commissions, for all losses or damages. The County requires the policy to be endorsed with WC 00 03 13 Waiver of our Right to Recover from Others or equivalent.

      The Bidder must be in compliance with all applicable State and federal workers’ compensation laws, including the U.S. Longshore Harbor Workers’ Act and the Jones Act, if applicable.

      For any Bidder who has exempt status as an individual, the County requires proof of Workers’ Compensation insurance coverage for that Bidder’s employees, leased employees, volunteers, and any workers performing work.

      d. Property Coverage (Builder’s Risk)Applies to Construction related Projects

      Coverage must be afforded in an amount not less than 100% of the total Project value, including soft costs, with a deductible of no more than $25,000 each claim. Named Windstorm Deductibles, if any, must be disclosed to the County.

      Coverage form shall include, but not be limited to:

      • All Risk Coverage including Flood and Windstorm with no coinsurance clause
      • Waiver of Occupancy Clause Endorsement, which will enable the County to occupy the property/structure under construction/renovation during the activity
      • Storage and transport of materials, equipment, supplies of any kind whatsoever to be used on or incidental to the project
      • Equipment Breakdown for cold testing of all mechanized, pressurized, or electrical equipment
      • LEG2 Coverage or equivalent

      For installation of property and/or equipment, Builder’s Risk Installation insurance must be provided to include coverage for materials or equipment stored at the Project site, while in transit, or while stored at a temporary location. Coverage limit must be no less than replacement cost.

      The Property Coverage (Builder’s Risk) policy shall insure the interests of the owner, contractor, and subcontractors in the property against all risk of physical loss and damage, and name the County as a loss payee. Additionally, the County shall be named as an Additional Insured for its interest in the property/structure and for any materials purchased directly by the County. This insurance shall remain in effect until the work is completed and the property has been accepted by the County.

      e. Professional Liability and/or Errors and Omissions Applies to Projects involving Professional Services

      Coverage must be afforded for Wrongful Acts in an amount not less than $1,000,000 each claim and $1,000,000 aggregate.

      Insurance must be kept in force until the third anniversary of the expiration or termination of any Contract that may be entered into between the parties.

      f. Umbrella/Excess Insurance

      If the Bidder’s primary insurance policy/policies do not meet the minimum requirements, the Bidder may provide an Umbrella/Excess insurance policy to comply with the insurance requirements.

      Providing and maintaining adequate insurance coverage is a material obligation of the Bidder. Upon being awarded the Bid and prior to commencement of the Services, the successful Bidder must deliver valid certificates of insurance for the required insurance coverage to the County’s Purchasing Department.

      The certificates of insurance for the required coverages, with the exception of Workers’ Compensation, Employer’s Liability, and Professional Liability, shall name “Clay County, a political subdivision of the State of Florida, and The Board of County Commissioners, Clay County, Florida, its employees, agents, boards and commissions, as their interests may appear” as “Additional Insureds”. The coverage shall contain no special limitation on the scope of protection afforded to the County, its employees, agents, officials, boards, and commissions. The certificates of insurance shall indicate if coverage is provided under a claims-made or occurrence form. If any coverage is provided on a claimsmade form, the certificates of insurance will show a retroactive date, which should be the same date of the initial Contract or prior. The Contract number, Bid number, event dates, or other identifying reference must be listed on the certificates of insurance.

      The Certificate Holder on the certificates of insurance should read as follows: “Clay County Board of County Commissioners, P.O. Box 1366, Green Cove Springs, FL 32043” or as otherwise designated by the County’s Purchasing Department.

      The certificates of insurance shall be provided to the County with a thirty (30) day notice of cancellation; ten (10) days’ notice if cancellation is for nonpayment of premium. In the event that the insurer is unable to accommodate the cancellation notice requirement, it shall be the responsibility of the Bidder to provide the proper notice. Such notification will be in writing by registered mail, return receipt requested, and addressed to the Certificate Holder. In the event the Contract term goes beyond the expiration date of any insurance policy, the Bidder shall provide the County’s Purchasing Department with an updated certificate of insurance no later than ten (10) days prior to the expiration of the insurance currently in effect. The County reserves the right to suspend the Contract until this requirement is met. If any required insurance coverage is canceled, terminated, or revoked, the Bidder agrees to immediately suspend its operations until replacement insurance is obtained and verified.

      Any exclusions or provisions in the insurance maintained by the Bidder that excludes coverage for work or services contemplated under the Bid shall be deemed unacceptable, a material violation of the County’s Bidding requirements, and shall be considered a breach of any Contract entered into after a Bid Award.

      It is the successful Bidder’s responsibility to ensure that all independent and subcontractors comply with the insurance requirements. All coverages for independent and subcontractors shall be subject to all of the requirements stated herein. Any and all deficiencies are the responsibility of the Bidder.

      The County Manager may modify the insurance requirements for particular projects and/or Services.

    • Laws and Regulations:

      The Bidder shall comply with all laws and regulations applicable to provide the goods and/or services specified in this RFB. The Bidder shall be familiar with all federal, state and local laws that may affect the goods and/or services offered. All applicable Federal and State laws, municipal and Clay County ordinances, and the rules and regulations of all authorities having jurisdiction over any part of the project shall apply to the entire project and Contract.

    • No Bid:

      Each Bidder not intending to Bid should select the "No-Bid" button on the main screen of the posted RFB.

      For more information/instruction on how to submit a "No-Bid", please visit: https://opengov.my.site.com/support/s/article/c529de59-be0a-458f-82b0-9aaa0e3dfac1

    • No Contact Period:

      Bidders are prohibited from contacting, by any means, whether orally, telephonically, electronically or in writing, any member of the Board, any County employee, including the County Manager, the County Attorney or the Commission Auditor, any member of the designated Evaluation Committee or any agent of the County regarding the Request for bids in any respect during the Request for Bid Period.

      The Request for Bid Period during which no contact may occur commences from the date of publication of the notice of a Request for Bids and ends upon a Bid Decision becoming final, i.e. after the notice of bid protest period of 72 hours has expired. However, in the event of a notice of protest, the no contact rule continues in place during the Protest Period and does not end until a resolution of the protest has occurred and become final.

      The following exceptions exist to the no-contact rule:

      1. Inquiries may be submitted to the Purchasing Department if specifically provided in the Request for Bids;
      2. Pre-bid conferences provided for in the Request for Bids; and
      3. Formal presentations by Bidders to the designated Evaluation Committee or to the Board or any committee thereof specifically contemplated in the Request for Bids.
    • Payments:

      All payments will be made in accordance with the Local Government Prompt Payment Act; related to non-construction services and construction services, as it may apply.

    • Performance and Payment Bond Requirements:

      Awarded Bidder has 10 days from the execution of the Agreement to provide a compliant Performance and Payment Bond.

      Performance and Payment Bonds are not required for projects of $200,000.00 or less. Prior to commencement of a project exceeding $200,000.00, in accordance with F.S. 255.05, the awarded Bidder shall file a 100% Performance Bond and Payment Bond (using Clay County’s Standard Form) in the Public Record of Clay County, Florida, Recording Dept./Room 130, 825 North Orange Avenue, Green Cove Springs, Florida 32043. The recorded Performance and Payment Bonds shall be provided prior to the commencement of construction to Clay County Purchasing Department, PO Box 1366, Green Cove Springs, Florida 32043. Performance and Payment Bonds must be increased in accordance with any change order increases on the project.

    • Public Entity Crimes:

      Pursuant to Section 287.133(2)(a) of the Florida Statutes, a person or affiliate who has been placed on the convicted supplier list following a conviction for a public entity crime may not submit a Bid for a Contract to provide any goods or services to a public entity, may not submit a Bid for a Contract with a public entity for the construction or repair of a public building or public work, may not submit Bids on leases of real property to a public entity, may not be awarded or perform work as a Contractor, supplier, Sub-Contractor, or consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017 of the Florida Statutes, for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted supplier list. By submitting a Bid - Bidder attests that they have not been placed on the Convicted Supplier List.

    • Public Records:

      In accordance with Chapter 119 of the Florida Statutes (Public Records Law) and except as may be provided by other applicable State and Federal Law, all Bidders should be aware that Bids are public record. If the Bidder considers any portion of the documents, data or records within their Bid to be confidential and/or proprietary and which they believe to be exempt from disclosure, the Bidder must mark the document/response as “Confidential” in the applicable section, citing specifically the applicable exempting law and provide the County with a separate redacted copy of its Bid. Each RFB will provide a submittal section for a separate redacted copy.

      In the event of a request for public records that is in accordance with the above mentioned authority, to which documents that are marked as confidential are responsive, the County will provide the Redacted Copy to the requestor. The Bidder acknowledges that if the Bidder fails to submit a redacted copy of information it claims is confidential, the County is authorized to produce the entire documents, data or records submitted to the County in answer to a public records request for these records.

    • Qualification:

      The County shall have the right to review the references, experience of assigned personnel, and qualifications of the Bidder in order to make the final determination of acceptability of the Bidder.

      At the sole discretion of the County, such determination may result in the Bidder being deemed non-responsive.

    • Rejection:

      The Board reserves the right to reject any and all Bids without cause and to waive technical and nontechnical or non-material defects in the request or submittals of any Bids.

    • Scrutinized Companies Certification:

      In compliance with subsection (5) of Section 287.135(5), Florida Statutes the Bidder certifies that the company is not participating in a boycott of Israel as defined in subsection (1) of the Statute; is not on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List as referred to in subsection (2) of the Statute; and is not engaged in business operations in Cuba or Syria as defined in subsection (1) of the Statute. The included Scrutinized Companies Certification Form must be completed and returned as part of the Bid.

    • Sub-Contractors:

      The County reserves the right to approve all Sub-Contractors. If Sub-Contractors are to be utilized, their names and references must be included within this Bid. Responsibility for the performance of the Contract remains with the main Contractor exclusively. After the commencement of the project, Sub-Contractors may be added or modified during the Contract period only with prior written permission from the County, and only for reasonable cause, as judged by the County.

    • Supplier Debarment:

      By submitting a Bid, the Bidder certifies that it is not currently debarred from submitting Bids for contracts issued by any political subdivision or agency of the State of Florida and that it is not an agent of a person or entity that is currently debarred from submitting Bids for contracts issued by any subdivision or agency of the State of Florida.

    • Use of Contract by other Government Agencies:

      At the option of the Bidder, the use of the Contract resulting from this solicitation may be extended to other governmental agencies, including the State of Florida, its agencies, political subdivision, counties, and cities.

      Each governmental agency permitted by the Bidder to utilize this Contract must operate autonomously from other governmental entities. Each agency is accountable for its own procurement and is only liable for the goods or services it orders, receives, and accepts. No agency assumes liability solely by participating in this bid and subsequent contract award.

    • Value Engineering

      The County reserves the right to engage in value engineering discussions prior to the award of the RFB.

      The County will give the lowest qualified Bidder the opportunity to determine if viable options exist to meet the budget threshold without substantially reducing the scope of the project as designed and solicited.

    • Waiver of Formalities/Rejection of Bids:

      The County reserves the right to waive formalities in any Bid, to reject any or all Bids with or without cause, to waive irregularities, and waive technical and non-technical or non-material defects in the Bid document or submittal of any Bid. Bids in which the prices obviously are unbalanced will be rejected. The County reserves the right to reject any and all Bids and to re-advertise for all or any part of this solicitation as deemed in its best interest.

    • Withdrawal of Bid:
      Bids may be withdrawn by selecting "Unsubmit Proposal" at the bottom of the Bidders "OpenGov Proposal" screen before the date and time for receiving Bids has expired. Negligence on the part of the Bidder in preparing a Bid is not grounds for withdrawal or modification of a Bid after such Bid has been opened by the County. Bidders may not withdraw or modify a Bid after the appointed Bid Opening, and Bids will be in force for a minimum of One Hundred and Twenty (120) days after the Bid Opening. Bidders may not assign or otherwise transfer their Bids.
       
      For more information/instruction on how to Withdrawal a Bid, please visit:

    Submission Requirements

    • Response Acknowledgement (required)

      I acknowledge the following:

      I will respond to this RFB in the manner that is being requested of me.

      I am not to add any embedded links to any documents, as they may not be accessed / reviewed / evaluated. Hyperlinks are defined as a link from a hypertext file or document to another location or file, typically activated by clicking on a highlighted word or image on the screen. 

      When a document is required to be uploaded, it must be in PDF format. If the document is not in PDF format, it may not be accessed / reviewed / evaluated.

      I am not to add any hyperlinks or embedded links to response boxes within the questionnaire, as they may not be accessed / reviewed / evaluated.

    • Proprietary/Confidential Information (required)

      In accordance with Chapter 119 of the Florida Statutes (Public Records Law) and except as may be provided by other applicable State and Federal Law, all Bidders should be aware that Bids are public record.

      If the Bidder considers any portion of the documents, data or records within their Bid to be confidential and/or proprietary and which they believe to be exempt from disclosure, the Bidder must mark the document/response as “Confidential” in the applicable section, citing specifically the applicable exempting law and provide the County with a separate redacted copy of its Bid.

      In the event of a request for public records that is in accordance with the above mentioned authority, to which documents that are marked as confidential are responsive, the County will provide the Redacted Copy to the requestor.

      The Bidder acknowledges that if the Bidder fails to submit a redacted copy of information it claims is confidential, the County is authorized to produce the entire documents, data or records submitted to the County in answer to a public records request for these records.

    • Separate Redacted Copy of Bid

      If Question Number 2: Proprietary/Confidential Information is Applicable to you, please read/ follow the instructions below:

      Once you have completed all sections of this RFB, create a document that is comprised of the information you have provided.

      Redact any portion of the documents, data or records within your Bid that you believe to be confidential and/or proprietary and which you believe to be exempt from disclosure and upload the Redacted copy here.

    • Litigation, Investigations, and Disputes Disclosure (A) (required)

      Has Bidder (including any parent company, subsidiaries, affiliates, officers, directors, or key personnel) been involved in any litigation, arbitration, or administrative proceedings (past or pending) related to its business operations within the past ten (10) years? 

      If Yes, please provide a detailed explanation, including:

      • Case caption and number

      • Jurisdiction (court or administrative body)

      • Brief description of the nature of the dispute

      • Status or outcome (e.g., pending, settled, dismissed, judgment entered)

      • Copies of legal documentation substantiating the information provided above 

      Important: Failure to fully disclose any relevant information, or any misrepresentation or omission of facts, may result in any remedy deemed to be in the best interest of the County.

    • Litigation, Investigations, and Disputes Disclosure (B)

      If Bidder answered 'Yes' to Litigation, Investigations, and Disputes Disclosure (A), please provide a detailed explanation, including:

      • Case caption and number

      • Jurisdiction (court or administrative body)

      • Brief description of the nature of the dispute

      • Status or outcome (e.g., pending, settled, dismissed, judgment entered)

      • Copies of legal documentation substantiating the information provided above 

      Important: Failure to fully disclose any relevant information, or any misrepresentation or omission of facts, may result in any remedy deemed to be in the best interest of the County.

    • Legal Name (required)

      Please enter your Company's Legal Name. 

    • Approved Designated Signee (required)

      Please provide the full name, title, and email address of the authorized signee for your company.

    • Company Contact Information (required)

      Please provide the following details for your Company's primary contact person:

      1. Company Primary Contact Name:
        (First and Last Name)
      2. Company Primary Contact Role:
        (Position or Title within the Organization)
      3. Company Primary Contact Phone Number:
        (Include Area Code)
      4. Company Primary Contact Email Address:
        (Please provide a valid and frequently monitored email address)
    • Company Remittance Address (required)

      Please provide your Company's remittance address. 

      The Address should include: 

      Street Address: This should include the building number, street name, and, if applicable, suite number.

      City, State, and ZIP Code: The city and state should be fully spelled out (unless state abbreviations are standard), followed by the ZIP Code.

      Example of a Complete Address:

      John Doe
      1234 Elm Street, Apt 5B
      Springfield, IL 62704

    • W-9 (required)

      Please fill out the attached W-9.

    • EFT Authorization Form

      Please download the below documents, complete, and upload.

    • SunBiz Verification (required)

      Please enter your EIN number here

    • E-Verify (required)

      Please enter your Company's legal name below. 

      If you are not currently registered with E-Verify, please do so as soon as possible. ALL Bidders must be registered with E-Verify in order to enter into an Agreement with the County. 

    • E-Verify (required)

      Please download the below documents, complete, and upload.

    • Conflict of Interest Disclosure: (required)

      County Employee: Please mark yes or no if you work for Clay County as an employee.

    • Conflict of Interest Disclosure: (required)

      An outside personal economic relationship which affords present or future financial benefits to an employee, his family or to individuals with whom he has business or financial ties may be considered a conflict of interest requiring evaluation by the County Manager.

      Please select one of the options below:

    • Conflict of Interest Disclosure: (required)

      Please identify yourself, family member or other conflict of interest.

      If you selected: "I certify that neither my family nor myself are employees of the County and will benefit financially by doing business with Clay County." please enter "Not Applicable".

    • Bid Bond / Cashier Check / Certified Check (required)

      Bids require a five (5%) percent bid bond and may not be withdrawn after the scheduled opening time for a period of thirty (30) days. The term bid bond shall include bonds or cashier or certified checks payable to the County.

      Please upload a copy of your Bid Bond, Cashier Check, or Certified Check here with the requirements listed above.

    • Cashier Check / Certified Check (required)

      I acknowledge that any Cashier or Certified Check must be uploaded with the Bid and the original Cashier or Certified Check must be received by the Purchasing Department no later than two (2) business days after the RFB due date.

      I acknowledge that if I do not provide the original physical check, the CCBCC Purchasing Department reserves the right to deemed my bid unresponsive.

      IF SUBMITTING A CASHIER CHECK / CERTIFIED CHECK:
      477 Houston Street 
      Administrative Building - Fourth Floor
      Green Cove Springs, FL 32043

      IF SUBMITTING A CASHIER CHECK / CERTIFIED CHECK VIA MAIL:
      P.O. Box 1366 Green Cove Springs, FL 32043

    • Section 287.05701, Florida Statutes - Prohibition against considering social, political, or ideological interests in government contracting (required)

      Bidders are hereby notified of the provision of section 287.05701, Florida Statutes, as amended, that the Clay County Board of County Commissioners will not request documentation of or consider a Bidder's social, political, or ideological interests when determining if the Bidder is a responsible Bidder.

      The Bidder acknowledges they were notified of the provisions in section 287.05701, Florida Statutes. 

       

    • Term Acknowledgement (required)

      The Bidder acknowledges that they have thoroughly reviewed the term outlined in the Scope of Work.

    • Grant Agreement Terms and Conditions (required)

      The Bidder acknowledges that they have thoroughly reviewed Contract No. _________,  between Clay County and _______________ and agrees that the Bidder and its Sub-Contractors shall comply with all terms and conditions listed in the Agreement in addition to all federal, state, and local laws and regulations applicable to this RFB. 

    • Proof of Insurance (required)

      Provide certificate(s) of insurance.

      Certificates of insurance shall meet or exceed the requirements listed in Section 2. Instructions to Bidders of this RFB.

      Please upload Insurance document(s) here.

    • Workers' Compensation Exemption (A) (required)

      Is Bidder currently exempt from carrying Workers’ Compensation insurance? 

      If Yes, Bidder must provide a valid Certificate of Election to be Exempt issued by the Florida Division of Workers’ Compensation.

       

    • Workers' Compensation Exemption (B)

      If Bidder Answered 'Yes' to Workers' Compensation Exemption (A), please upload a valid Certificate of Election to be Exempt issued by the Florida Division of Workers’ Compensation here. 

    • Drug-Free Workplace (required)

      Pursuant to Section 287.087, Florida Statutes, whenever two or more bids, proposals, or replies that are equal with respect to price, quality, and service are received by the state or by any political subdivision for the procurement of commodities or contractual services, a bid, proposal, or reply received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. In order to have a drug-free workplace program, a business shall:

      (1) Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.

      (2) Inform employees about the dangers of drug abuse in the workplace, the business’s policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.

      (3) Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection (1).

      (4) In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of chapter 893 or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than 5 days after such conviction.

      (5) Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee’s community by, any employee who is so convicted.

      (6) Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.

       

      Does the Bidders business certify that it has implemented a drug-free workplace program? Please answer yes or no below. 

    • Drug-Free Workplace Policy

      If the Bidders Company has a drug-free workplace policy, please upload such policy. 

    • Material Lead Time (required)

      Are there any long lead times associated with obtaining the materials required to perform the work outlined in this RFB?

       
    • Material Lead Time (required)
       

      If yes, please provide a detailed summary of the the lead times for the materials required to fulfill the work outlined in this RFB.

      If no, please state that there are no lead times for the materials required to fulfill the work outlined in this RFB. 

    • Licenses / Certifications (required)

      The Bidder shall list all current licenses and certifications held in the format listed below:

      License Name:

      License #:

      Issuing Agency:

      Expiration Date:

    • Licenses / Certifications (required)

      Please upload a copy of each current license or certification provided in the response above. 

    • Warranty Form (required)

      Please upload a sample or draft of your Warranty.

    • Subcontractors and Suppliers (required)

      Bidder shall submit any and all proposed sub-contractors and major material suppliers for review/approval by the County.

      Bidder shall attach any and all licenses or certifications required for the proposed sub-contractor to perform the intended portion of the Work as stated in the form. 

      All subcontractors and major materials suppliers are subject to approval of County Please download the below documents, complete, and upload. 

    • Local Preference (required)

      Resolution No. 2018/2019-2 adopted by the Clay County Board of Commissioners.

      Local Business Definition:

      (A) a person or business entity which maintains a permanent place of business with full-time employees within Clay County for a minimum of twelve months prior to the date Bids or quotes were received for the purchase or contract at issue, which provides from such permanent place of business the kinds of goods or services solicited, and which at the time of the solicitation submits the Local Business Affidavit of Eligibility; or

      (B) a person or business entity which utilizes for at least 40% of the solicited work local Clay County sub-contractors or suppliers, meaning sub-contractors or suppliers which maintain a permanent place of business with full-time employees within Clay County for a minimum of twelve months prior to the date Bids or quotes were received for the purchase or contract at issue, provide from such permanent place of business the kinds of goods or services solicited, and at the time of the solicitation submit the Local Business Affidavit of Eligibility.

      The authorized purchasing authority of Clay County shall have the sole discretion to determine if a person or business entity meets the definition of Local Business. Such decision shall not be disputed nor protested.

      The Board of County Commissioners reserves the right to award Bids/quotes/proposals which would be in the best interest of the County or reject any and all Bids/quotes/proposals. As such, the County reserves the exclusive right to compare, contrast and otherwise evaluate the qualifications, character, responsibility and financial qualifications of all persons, firms, partnerships, companies or corporations submitting Bids or quotes in any procurement for goods and services when making an award in the best interests of the County.

      Resolution No. 2018/2019-2 can be found at: https://www.claycountygov.com/government/purchasing/vendor-information

      Please choose one of the following to verify Local preference eligibility:

    • Local Preference

      If you selected (A) or (B) in the question above, please download the below documents, complete, and upload.

    • Buy American (required)

      A. Buy American Preference

      (i) Purpose. The Board wishes to support the Buy American Act of 1933, as set forth in 41 U.S.C. Chapter 83, and the Presidential Executive Orders reiterating the intent to use the Buy American Act to the greatest extent permitted by law by providing a preference for the use of American-made Goods when County funds are expended. A domestic preference for Goods that are manufactured, assembled or produced in the United States encourages the selection and utilization of American-made Goods which in turn promotes the local and regional economy, as well as strengthens state and national economic interests. Further, a domestic preference promotes security, good government and the general convenience of the County’s citizens.

      B. Applicability

      A Buy American Preference shall apply when fifty-one percent (51%) of the components of the final Good manufactured, assembled or produced to be sold to the County is made in the United States and an affidavit supporting the assertion that fifty-one percent (51%) of the components of the Good is American manufactured, assembled or produced, along with supporting documentation, is submitted with the Bid or written Quote.

      The Purchasing Director shall resolve any issues relating to the applicability of the Buy American Preference, and that decision on the applicability of whether a Buy American Preference applies shall not be disputed nor protested.

      By selecting "Yes", the Bidder affirms that they qualify for a Buy American Preference as defined below and in the Clay County Purchasing Policy, Chapter 5, Purchasing Rules.

      By selecting "No" he Bidder affirms that they do not qualify for a Buy American Preference as defined below and in the Clay County Purchasing Policy, Chapter 5, Purchasing Rules.

    • Buy American

      If you selected "Yes" in the question above, please download the below documents, complete, and upload.

    • References (required)

      Please provide three (3) or more references for Projects that your Company has performed for other entities/agencies with similar Scopes as listed in this RFB. Each reference should be listed in the required format below:

      Agency/Entity Name:

      Address:

      City, State & Zip Code:

      Contact Person:

      Telephone:

      Email Address:

      Dates of Service:

      Project Name:

      Type of Service:

      Additional Comments:

      In addition, please list any previous experience working on government Projects. 

    • Scrutinized Companies Certification (required)

      Please download the below documents, complete, and upload.

    • Davis Bacon Wage Rates (required)

      Please download the below documents and acknowledge receipt on the next question.

    • Davis Bacon (required)

      I have read and acknowledge the document(s) attached above for the Davis Bacon Wage Rates.

    • Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion (required)

      Please download the below documents, complete, and upload.

    • Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion (required)

      Please download the below documents, complete, and upload.

    • Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion (required)

      Please enter your legal company name.

    • Compliance with ARPA Federal Guidelines (required)

      Please download the below documents, complete, and upload.

    • CDBG Supplemental Conditions for Construction Contracts (required)

      Please download the below documents, and acknowledge receipt on the question below.

    • CDBG Supplemental Conditions for Construction Contracts (required)

      I have read and acknowledge the document(s) for CDBG Supplemental Conditions for Construction Contracts attached above.

    • Federal Purchasing Policy (required)

      I have read and acknowledge the Federal Purchasing Policy provided in the Attachment Section of this RFB. 

    • Hazard Mitigation Grant Program (HMGP) Compliance Required Contract Clauses (required)

      Please download the below documents, complete, and upload.

    • FDOT Documentation (required)

      Please download the below documents, complete, and upload.

      1. Bid Opportunity List for Commodities & Contractual Services

      2. Disclosure of Lobbying Activities

      3. Non-Collusion Declaration and Compliance with 48 CFR § 29

      4. Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion - Lower Tier Covered Transactions for Federal Aid Contracts

    • Price Proposal (required)

      Please download the below documents, complete, and upload.

    • Pricing Proposal (required)

      Will you be utilizing OpenGov's Pricing Proposal?

      If Yes, please make sure to review the Pricing Proposal description ensuring it is tailored to your solicitation. 

    • Alternate Pricing Proposal (required)

      Will you be using a File Upload within the Supplier Questionnaire for your Price Proposal, rather than the digital Price Proposal provided by OpenGov?

       

      IF YES, a supplier question will populate that you will have to adjust (The prompt and file will need to be adjusted to fit your current RFB). 

    • Insurance Requirements (required)

      Have you verified if there will be additional insurance coverage requirements for this solicitation?

      IF YES - Please make sure to review / update / change the Insurance requirements listed in the Instructions to Bidders Section.

       

    • Bid Bond / Cashier Check / Certified Check (required)

      Will this RFB require a 5% Bid Bond / Cashier Check / Certified Check?

      IF YES - Verify that the Supplier Questionnaire includes: 

      1. Bid Bond File upload
      2. Cashier Check / Certified Check Confirmation

      IF NO - Verify that the Supplier Questionnaire does not include:

      1. Bid Bond File upload
      2. Cashier Check / Certified Check Confirmation
    • Licenses & Certifications (required)

      Will License and/ or Certifications be required for this RFB?

    • Over $200K (required)

      Is this RFB estimated to come in over $200,000.00?

      Ensure required attachment is included.

    • Warranty (required)

      Will this RFB require a County Warranty Form?

      If YES, the County Warranty Form (2 years) will populate in the attachments section. 

      If NO, the County Warranty Form (2 years) will not populate in the attachments section. 

    • Contractor / Supplier Warranty (required)

      Will this RFB require the Contractor / Supplier to provide a copy of a draft Warranty? 

      If YES, a supplier questionnaire question will populate asking for their draft Warranty. Please adjust this language per your RFB requirements, if necessary (The number of years the Warranty is required to be valid for is blank, you will need to fill this portion in.)

    • Lead Times (required)

      Does this RFB require materials of any kind?

    • Owner Direct Purchases (ODP) (required)

      Will the County be advertising this solicitation with the potential to utilize ODP's?

      IF YES - Do not remove the ODP section from your scope of work. If you select yes, the ODP information sheet will populate as an attachment automatically.

      IF NO - Please make sure to remove the ODP section from your scope of work! 

    • Local Preference (required)

      Will this RFB utilize Local Preference?

    • Buy American (required)

      Will this RFB Utilize Buy American?

    • Davis Bacon (required)

      Will this RFB require the Davis Bacon Rate Wages?

      IF YES - you will have to update the attachment with the most recent wage rates! 

    • Florida Statute 119.071(3)(b) (required)

      Are the plans for this RFB solicitation subject to Florida Statute 119.071(3)(b) ? See statute below:

      (b)1. Building plans, blueprints, schematic drawings, and diagrams, including draft, preliminary, and final formats, which depict the internal layout and structural elements of a building, arena, stadium, water treatment facility, or other structure owned or operated by an agency are exempt from s. 119.07(1) and s. 24(a), Art. I of the State Constitution.
       
      2. This exemption applies to building plans, blueprints, schematic drawings, and diagrams, including draft, preliminary, and final formats, which depict the internal layout and structural elements of a building, arena, stadium, water treatment facility, or other structure owned or operated by an agency before, on, or after the effective date of this act.
       
      3. Information made exempt by this paragraph may be disclosed:
      a. To another governmental entity if disclosure is necessary for the receiving entity to perform its duties and responsibilities;
      b. To a licensed architect, engineer, or contractor who is performing work on or related to the building, arena, stadium, water treatment facility, or other structure owned or operated by an agency; or
      c. Upon a showing of good cause before a court of competent jurisdiction.
      4. The entities or persons receiving such information shall maintain the exempt status of the information.
       

      EXAMPLES: Clay County Jail, Clay County Court House, Admin Building. 

    • FDOT (required)

      Is this RFB an FDOT Project?

    • Will this RFB be Funded through a Grant or Federal Funds? (required)

      Examples: ARPA, CDBG, FEMA, etc...

      IF THIS SOLICITATION IS FEDERALLY FUNDED, PLEASE CHOOSE THE APPLICABLE DOCUMENTS AND SELECT "YES"

    • Grant Agreement (required)

      Will you be referencing and attaching a Grant Agreement to this RFB?

       

      IF YES - The Supplier questionnaire Confirmation Question will populate:

      Grant Agreement Terms and Conditions 

      The Bidder acknowledges that they have thoroughly reviewed Contract No. _________,  between Clay County and _______________ and agrees that the Bidder and its Sub-Contractors shall comply with all terms and conditions listed in the Agreement in addition to all federal, state, and local laws and regulations applicable to this RFB. 

       

      YOU WILL NEED TO FILL IN THE BLANKS AND EDIT AS NEEDED!

    Questions & Answers

    Q (Photo Documentation): Hello there, Kory here. Will there be any requirements OR interest in Drone Services on this project? ie pre/post site conditions, progress photos, video, 360° aerial panoramas, 2D site overview, etc.?

    A: The County will not require Drone services, photos, videos for project.


    Q (Landscape and Irrigation Plans): Will there be a plan set for Landscape and Irrigation to be installed post drainage repairs?

    A: There are no new plan sets for irrigation or landscaping included in this project. No new irrigation systems are within the scope of work. Landscaping shall be limited to restoration only.


    Key dates

    1. March 26, 2026Published
    2. April 27, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.