    The City of Charleston seeks construction services for the Central Park Drainage Improvements Project to enhance drainage and flood resiliency on James Island. The project includes demolition, installation of stormwater infrastructure, grading, paving, and erosion control. Bids due by August 7, 2026.

    Opportunity details

    Solicitation No.
    885
    Type / RFx
    RFP
    Status
    Open
    Level
    city
    Published Date
    July 6, 2026
    Due Date
    August 7, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    City of Charleston
    Agency
    City of Charleston

    Description

    The City of Charleston (City) is accepting Bid Proposals for construction services for the Central Park Drainage Improvements Project. The City will receive submittals until August 7, 2026 at 2:00 PM at 2 George Street, Suite 2100, Charleston, SC 29401. A voluntary pre-bid meeting will be held on July 27, 2026 at 10:00 AM at the office listed above. All related documents will be available on the City website, www.charleston-sc.gov, (Business, Bidline, Stormwater), or may be obtained by submitting a request to Grant Eversmann at eversmanng@charleston-sc.gov or 843-579-6473. The purpose of this project is to improve the drainage and tidal and flood resiliency in the Central Park Road basin on James Island by installing improvements along an approximate 4,250 LF corridor of open channel with upfits at multiple culvert crossings. The Work will include demolition and removal of asphalt roadways, concrete sidewalks, concrete curb and gutter, rip-rap, trees, and storm drain pipe, culverts, and structures; installation of new storm drain pipe, culverts, valves, and structures; grading along the open channel to establish positive drainage; water main and sanitary sewer force main relocations; installation of asphalt paving, concrete sidewalks, and concrete curb and gutter; installation of temporary and permanent erosion control, including rip-rap; traffic control; surveyed as-built record drawings; and more as shown in the Drawings. This project is part of a greater multi-agency project previously completed under separate contracts with Charleston County, the Town of James Island, and SCDOT. This project is funded in part by the South Carolina Rural Infrastructure Authority (RIA). Links: www.charleston-sc.gov (http://www.charleston-sc.gov/)

    Key dates

    1. July 6, 2026Published
    2. August 7, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.