Active SLED Opportunity · VERMONT · VERMONT
AI Summary
Replacement of a 60-inch CMP culvert with a 30-foot long aluminized steel pipe arch culvert in Springfield, Vermont.
The Project includes the following Work: Replacement of existing 60” CMP culvert with a new 30’ long, 128” x 83” aluminized steel pipe arch culvert.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.