SLED Opportunity · WASHINGTON · MRSC ROSTERS - MUNICIPAL RESEARCH AND SERVICES CENTER
AI Summary
Full width reconstruction of Washington Street including roadway, sidewalks, ADA ramps, and utility replacements such as watermain, sanitary sewer, and storm system in Sumner, WA.
The project consists of full width reconstruction of Washington Street from Wood Avenue to approximately 75 feet beyond McMillan Ave and consists of: Roadway: work includes full reconstruction of the roadway section with cement treated base, curb and gutter, planter strip, sidewalks, ADA ramps and driveways. This project also includes partial reconstruction of Wood Avenue to accommodate new utility crossings and improvements to Wood Avenue ADA improvements. This includes an alternative bid for restoration of planter strips with either new top soil or fertilizer amended in place. Utilities: Replace 6” asbestos concrete watermain, replacement of 8” sanitary sewer main, and new storm system.Completed bid proposals should be delivered to City of Sumner - City Hall, 1104 Maple Street, Sumner, WA 98390.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.