SLED Opportunity · TEXAS · CITY OF BRIDGE CITY
AI Summary
City of Bridge City seeks contractors for the 2026 Street Rehabilitation Project involving surface treatment, pothole repair, and asphalt overlay on selected streets. Work includes traffic control, site prep, and cleanup. Bids due May 13, 2026.
It is the intent of the Contract Documents to provide the requirements and specifications for the construction associated with the City of Bridge City, Texas, 2026 Street Rehabilitation Project.
The project generally consists of the installation of surface treatment on selected existing City streets, Jeanette Drive and Shadowdale Street, including roadway preparation, surface treatment application, traffic control, and all related appurtenances required for a complete project, in accordance with the Plans and Specifications.
The project scope includes but is not limited to:
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.