Active SLED Opportunity · GEORGIA · GEORGIA

    City of Cornelia Raw Water Reservoir No. 1 Improvements

    Issued by Cornelia, City Of
    stateRFQgeorgiaSol. PE-66850-NONST-2026-000000018
    Open · 20d remaining
    DAYS TO CLOSE
    20
    due Jun 23, 2026
    PUBLISHED
    May 20, 2026
    Posting date
    JURISDICTION
    georgia
    state
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    Sealed bids for construction improvements to the City of Cornelia Raw Water Reservoir No. 1 are due June 23, 2026. Work includes installation of toe drains, outlet control structure modifications, retaining wall construction, demolition, and site piping.

    Opportunity details

    Solicitation No.
    PE-66850-NONST-2026-000000018
    Type / RFx
    RFQ
    Status
    Open
    Level
    state
    Published Date
    May 20, 2026
    Due Date
    June 23, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    georgia
    State
    georgia
    Agency
    Cornelia, City Of

    Description

    Sealed bids for construction of the City of Cornelia Raw Water Reservoir No. 1 Improvements will be received until the closing time of June 23, 2026, at 2:00 PM local time. Bids must be submitted by the Bidder electronically through QuestCDN.com. No paper submissions will be accepted. Any bid received after the bid closing time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State law. Base Cost of all Bids will be posted by the Owner/Engineer to the QuestCDN website within approximately 30 minutes after the bid closing time. A non-mandatory Pre-bid conference will be held on June 4, 2026, at 2:00 PM local time onsite. The approximate address is 1282 Camp Creek Road, Cornelia, GA 30531. The coordinates to the access road are 34.5349, -83.5104. It will be a gravel road on the right, approximately 1,000 feet past Lakeview Heights Circle as you are driving north on Camp Creek Road. The purpose is to allow bidders access to the jobsite and discuss any other questions the bidder may have. Bringing a small boat to access the outlet control structure is recommended. Engineer will transmit to all prospective Bidders of Record such addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. The Work shall consist of furnishing all labor, materials, and equipment necessary to perform the work as specified, generally described as follows: installation of new toe drains, modifications to outlet control structure, catwalk to outlet control structure, concrete retaining wall construction, demolition of raw water tower, and miscellaneous site piping. Time allotted for completion of work ...please see Supporting Documents for complete information.

    Key dates

    1. May 20, 2026Published
    2. June 23, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.