SLED Opportunity · TEXAS · CITY OF TYLER
AI Summary
City of Tyler seeks contractors for sanitary sewer creek crossing repairs including pipe replacement, manhole construction, and pavement repairs. The project involves wastewater collection system work with a 210-day completion timeline.
Construction of approximately 3 sanitary sewer reroutes in 3 areas across the City of Tyler including approximately 1,440 linear feet of pipe replacement by open cut, approximately 140 linear feet of steel encasement by open cut, construction of 12 manholes, geopolymer manhole lining, lateral reconnections, pavement repairs, and assoicated gravity sewer appurtenenaces.
## Details **Bid/Project ID:** 104043 **Type of Work:** Wastewater Collection System **Pre-Bid Location:** Tyler Water Utilities Large Conference Room, 511 W. Locust St., Tyler, TX 75702 **Pre-Bid Notes:** Prebid is non-mandatory; however, all interested bidders are encouraged to attend. **Bid Location:** DELIVERY: Purchasing Office, 304 N. Border Ave., Tyler, TX 75702 OPENING: State Room (2nd Floor), 212 N. Bonner Ave., Tyler, TX 75702 **Bid Notes:** Submit questions for this project 72-hours prior to bid opening via Civcast Q&A portal. **Engineer/Publisher:** KSA - a PAPE-DAWSON company **Engineer Address:** 6781 Oak Hill Blvd., Tyler, TX, 75703 ## Additional Notes Any addenda issued for this project will ONLY be posted on www.civcastusa.com. Planholders will be notified of any addenda automatically through email if documents were downloaded and email registered with www.civcastusa.com. ## Notes Calendar Days: 210 Final Completion Liquidated Damages: Refer to Article 16.12.3 of the General ConditionsSLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.