Active SLED Opportunity · OKLAHOMA · CITY OF ENID

    Cleveland St. Indian Drive to Corp Channel Drainage Improvements

    Issued by City of Enid
    cityITBCity of EnidSol. 8655937413
    Open · 8d remaining
    DAYS TO CLOSE
    8
    due May 1, 2026
    PUBLISHED
    Apr 2, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    City of Enid seeks bids for stormwater drainage improvements along Cleveland Street, including pipe installation, concrete work, and site restoration. Pre-bid conference on April 15, 2026. Bid due May 1, 2026.

    Opportunity details

    Solicitation No.
    8655937413
    Type / RFx
    ITB
    Status
    Active
    Level
    city
    Published Date
    April 2, 2026
    Due Date
    May 1, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    City of Enid
    Agency
    City of Enid

    Description

    This project will include the construction of stormwater piped along Cleveland Street between Indian Drive to the Corp Channel. The improvements are in extension of the project to accommodate commercial development of the area. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.1158120.C16639226 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/17/2026 06:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: City of Enid **Reference Number**: 0000419272 **Pricing**: Item Based **Bid Documents List**: | Question Name | Question Description | Mandatory | |---|---|---| | Calendar Days | Please enter in your calendar days. | Yes | **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Recommended | Event date: 04/15/2026 11:00 AM EDT | Location: Conference Room B & via Zoom | Event Note: Topic: Pre-Bid: F-2502C Cleveland St. & Indian Drive to Corp Channel Drainage Imp Time: Apr 15, 2026 10:00 AM Central Time (US and Canada) Join Zoom Meeting https://us02web.zoom.us/j/84320657171?pwd=D8d9UGXdadxh4vrhO0PbX4bwwWMt75.1 Meeting ID: 843 2065 7171 Passcode: 180500 **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---|---|---|---|---| | Next Project 1 Next F-2502C-Base Bid Code Description UOM Qty 1 Traffic Control Lump-Sum 1 2 Mobilization Lump-Sum 1 3 Bonds and Insurance Lump-Sum 1 4 Clearing and Grubbing Lump-Sum 1 5 Construction Staking Lump-Sum 1 6 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 391 7 Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A Aggregate Base including Curb & Gutter Square Yard 213 8 (streets and driveways) Linear Foot/Feet 470 9 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Completed in Place including beddings as per standards attached Each 1 10 66"x51" CORR AL T2 STEEL END SECTION, Installed. Completed in Place including bedding as per standards attached Each 1 11 66"x51" CORR AL T2 STEEL TRASH SECTION, Installed. Complete in Place Linear Foot/Feet 15 12 12" Reinforced Concrete Pipe connection, Installed, Complete in Place Each 2 13 7.5 ft x 4 ft R.C Concrete junction box Complete in Place over 12" crushed rock, Tie-in included (ST #1 AND STR # 2) Square Foot/Feet 9000 14 Sodding Completed in Place Square Yard 70 15 Grouted Riprap 24" thick Linear Foot/Feet 24 | Next F-2502C-Base Bid Code Description UOM Qty 1 Traffic Control Lump-Sum 1 2 Mobilization Lump-Sum 1 3 Bonds and Insurance Lump-Sum 1 4 Clearing and Grubbing Lump-Sum 1 5 Construction Staking Lump-Sum 1 6 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 391 7 Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A Aggregate Base including Curb & Gutter Square Yard 213 8 (streets and driveways) Linear Foot/Feet 470 9 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Completed in Place including beddings as per standards attached Each 1 10 66"x51" CORR AL T2 STEEL END SECTION, Installed. Completed in Place including bedding as per standards attached Each 1 11 66"x51" CORR AL T2 STEEL TRASH SECTION, Installed. Complete in Place Linear Foot/Feet 15 12 12" Reinforced Concrete Pipe connection, Installed, Complete in Place Each 2 13 7.5 ft x 4 ft R.C Concrete junction box Complete in Place over 12" crushed rock, Tie-in included (ST #1 AND STR # 2) Square Foot/Feet 9000 14 Sodding Completed in Place Square Yard 70 15 Grouted Riprap 24" thick Linear Foot/Feet 24 | 1 | Traffic Control | Lump-Sum | 1 | 2 | Mobilization | Lump-Sum | 1 | 3 | Bonds and Insurance | Lump-Sum | 1 | 4 | Clearing and Grubbing | Lump-Sum | 1 | 5 | Construction Staking | Lump-Sum | 1 | 6 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 391 | 7 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A Aggregate Base including Curb & Gutter | Square Yard | 213 | 8 | (streets and driveways) | Linear Foot/Feet | 470 | 9 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Completed in Place including beddings as per standards attached | Each | 1 | 10 | 66"x51" CORR AL T2 STEEL END SECTION, Installed. Completed in Place including bedding as per standards attached | Each | 1 | 11 | 66"x51" CORR AL T2 STEEL TRASH SECTION, Installed. Complete in Place | Linear Foot/Feet | 15 | 12 | 12" Reinforced Concrete Pipe connection, Installed, Complete in Place | Each | 2 | 13 | 7.5 ft x 4 ft R.C Concrete junction box Complete in Place over 12" crushed rock, Tie-in included (ST #1 AND STR # 2) | Square Foot/Feet | 9000 | 14 | Sodding Completed in Place | Square Yard | 70 | 15 | Grouted Riprap 24" thick | Linear Foot/Feet | 24 | | | | Next F-2502C-Base Bid Code Description UOM Qty 1 Traffic Control Lump-Sum 1 2 Mobilization Lump-Sum 1 3 Bonds and Insurance Lump-Sum 1 4 Clearing and Grubbing Lump-Sum 1 5 Construction Staking Lump-Sum 1 6 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 391 7 Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A Aggregate Base including Curb & Gutter Square Yard 213 8 (streets and driveways) Linear Foot/Feet 470 9 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Completed in Place including beddings as per standards attached Each 1 10 66"x51" CORR AL T2 STEEL END SECTION, Installed. Completed in Place including bedding as per standards attached Each 1 11 66"x51" CORR AL T2 STEEL TRASH SECTION, Installed. Complete in Place Linear Foot/Feet 15 12 12" Reinforced Concrete Pipe connection, Installed, Complete in Place Each 2 13 7.5 ft x 4 ft R.C Concrete junction box Complete in Place over 12" crushed rock, Tie-in included (ST #1 AND STR # 2) Square Foot/Feet 9000 14 Sodding Completed in Place Square Yard 70 15 Grouted Riprap 24" thick Linear Foot/Feet 24 | 1 | Traffic Control | Lump-Sum | 1 | 2 | Mobilization | Lump-Sum | 1 | 3 | Bonds and Insurance | Lump-Sum | 1 | 4 | Clearing and Grubbing | Lump-Sum | 1 | 5 | Construction Staking | Lump-Sum | 1 | 6 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 391 | 7 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A Aggregate Base including Curb & Gutter | Square Yard | 213 | 8 | (streets and driveways) | Linear Foot/Feet | 470 | 9 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Completed in Place including beddings as per standards attached | Each | 1 | 10 | 66"x51" CORR AL T2 STEEL END SECTION, Installed. Completed in Place including bedding as per standards attached | Each | 1 | 11 | 66"x51" CORR AL T2 STEEL TRASH SECTION, Installed. Complete in Place | Linear Foot/Feet | 15 | 12 | 12" Reinforced Concrete Pipe connection, Installed, Complete in Place | Each | 2 | 13 | 7.5 ft x 4 ft R.C Concrete junction box Complete in Place over 12" crushed rock, Tie-in included (ST #1 AND STR # 2) | Square Foot/Feet | 9000 | 14 | Sodding Completed in Place | Square Yard | 70 | 15 | Grouted Riprap 24" thick | Linear Foot/Feet | 24 | | | 1 | Traffic Control | Lump-Sum | 1 | | 2 | Mobilization | Lump-Sum | 1 | | 3 | Bonds and Insurance | Lump-Sum | 1 | | 4 | Clearing and Grubbing | Lump-Sum | 1 | | 5 | Construction Staking | Lump-Sum | 1 | | 6 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 391 | | 7 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A Aggregate Base including Curb & Gutter | Square Yard | 213 | | 8 | (streets and driveways) | Linear Foot/Feet | 470 | | 9 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Completed in Place including beddings as per standards attached | Each | 1 | | 10 | 66"x51" CORR AL T2 STEEL END SECTION, Installed. Completed in Place including bedding as per standards attached | Each | 1 | | 11 | 66"x51" CORR AL T2 STEEL TRASH SECTION, Installed. Complete in Place | Linear Foot/Feet | 15 | | 12 | 12" Reinforced Concrete Pipe connection, Installed, Complete in Place | Each | 2 | | 13 | 7.5 ft x 4 ft R.C Concrete junction box Complete in Place over 12" crushed rock, Tie-in included (ST #1 AND STR # 2) | Square Foot/Feet | 9000 | | 14 | Sodding Completed in Place | Square Yard | 70 | | 15 | Grouted Riprap 24" thick | Linear Foot/Feet | 24 | | Next Project 2 Next F-2502C-Alternate 1 Code Description UOM Qty 1 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 46 2 Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A aggregate base including Curb & Gutter (streets and driveways) Linear Foot/Feet 33 3 5 ft x 41 ft R.C Concrete junction box (str # 3) Complete in Place over 12" crushed rock, Tie-in included Each 1 4 6 ft x 19ft R.C Concrete junction box (str # 4) Complete in Place over 12" crushed rock, Tie-in included Each 1 5 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included Each 1 6 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Complete in Place including beddings as per standards attached Linear Foot/Feet 8 7 60" DIA I D 16GA CORR Aluminized T2 pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 294 8 Bore & install 24" DIA I D HDPE Pipe (ADS N-12 WT IB PIPE-per AASTO Specification) Complete in Place including tie-ins and beddings as per standards attached. Linear Foot/Feet 26 | Next F-2502C-Alternate 1 Code Description UOM Qty 1 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 46 2 Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A aggregate base including Curb & Gutter (streets and driveways) Linear Foot/Feet 33 3 5 ft x 41 ft R.C Concrete junction box (str # 3) Complete in Place over 12" crushed rock, Tie-in included Each 1 4 6 ft x 19ft R.C Concrete junction box (str # 4) Complete in Place over 12" crushed rock, Tie-in included Each 1 5 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included Each 1 6 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Complete in Place including beddings as per standards attached Linear Foot/Feet 8 7 60" DIA I D 16GA CORR Aluminized T2 pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 294 8 Bore & install 24" DIA I D HDPE Pipe (ADS N-12 WT IB PIPE-per AASTO Specification) Complete in Place including tie-ins and beddings as per standards attached. Linear Foot/Feet 26 | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 46 | 2 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A aggregate base including Curb & Gutter (streets and driveways) | Linear Foot/Feet | 33 | 3 | 5 ft x 41 ft R.C Concrete junction box (str # 3) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 4 | 6 ft x 19ft R.C Concrete junction box (str # 4) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 5 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 6 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Complete in Place including beddings as per standards attached | Linear Foot/Feet | 8 | 7 | 60" DIA I D 16GA CORR Aluminized T2 pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 294 | 8 | Bore & install 24" DIA I D HDPE Pipe (ADS N-12 WT IB PIPE-per AASTO Specification) Complete in Place including tie-ins and beddings as per standards attached. | Linear Foot/Feet | 26 | | | | Next F-2502C-Alternate 1 Code Description UOM Qty 1 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 46 2 Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A aggregate base including Curb & Gutter (streets and driveways) Linear Foot/Feet 33 3 5 ft x 41 ft R.C Concrete junction box (str # 3) Complete in Place over 12" crushed rock, Tie-in included Each 1 4 6 ft x 19ft R.C Concrete junction box (str # 4) Complete in Place over 12" crushed rock, Tie-in included Each 1 5 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included Each 1 6 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Complete in Place including beddings as per standards attached Linear Foot/Feet 8 7 60" DIA I D 16GA CORR Aluminized T2 pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 294 8 Bore & install 24" DIA I D HDPE Pipe (ADS N-12 WT IB PIPE-per AASTO Specification) Complete in Place including tie-ins and beddings as per standards attached. Linear Foot/Feet 26 | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 46 | 2 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A aggregate base including Curb & Gutter (streets and driveways) | Linear Foot/Feet | 33 | 3 | 5 ft x 41 ft R.C Concrete junction box (str # 3) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 4 | 6 ft x 19ft R.C Concrete junction box (str # 4) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 5 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 6 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Complete in Place including beddings as per standards attached | Linear Foot/Feet | 8 | 7 | 60" DIA I D 16GA CORR Aluminized T2 pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 294 | 8 | Bore & install 24" DIA I D HDPE Pipe (ADS N-12 WT IB PIPE-per AASTO Specification) Complete in Place including tie-ins and beddings as per standards attached. | Linear Foot/Feet | 26 | | | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 46 | | 2 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A aggregate base including Curb & Gutter (streets and driveways) | Linear Foot/Feet | 33 | | 3 | 5 ft x 41 ft R.C Concrete junction box (str # 3) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 4 | 6 ft x 19ft R.C Concrete junction box (str # 4) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 5 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 6 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Complete in Place including beddings as per standards attached | Linear Foot/Feet | 8 | | 7 | 60" DIA I D 16GA CORR Aluminized T2 pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 294 | | 8 | Bore & install 24" DIA I D HDPE Pipe (ADS N-12 WT IB PIPE-per AASTO Specification) Complete in Place including tie-ins and beddings as per standards attached. | Linear Foot/Feet | 26 | | Next Project 3 Next F-2502C-Alternate 2 Code Description UOM Qty 1 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 13 2 7.5 ft x 12 ft R.C Concrete junction box (Str # 6) Complete in Place over 12" crushed rock, Tie-in included Each 1 3 6 ft x 20 ft R.C Concrete junction box (str # 7) Complete in Place over 12" crushed rock, Tie-in included Each 1 4 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included Each 1 5 60" DIA I D 16GA CORR Aluminized T2 pipe Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 340 6 36" DIA I D RCP Pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 7 | Next F-2502C-Alternate 2 Code Description UOM Qty 1 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 13 2 7.5 ft x 12 ft R.C Concrete junction box (Str # 6) Complete in Place over 12" crushed rock, Tie-in included Each 1 3 6 ft x 20 ft R.C Concrete junction box (str # 7) Complete in Place over 12" crushed rock, Tie-in included Each 1 4 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included Each 1 5 60" DIA I D 16GA CORR Aluminized T2 pipe Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 340 6 36" DIA I D RCP Pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 7 | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 13 | 2 | 7.5 ft x 12 ft R.C Concrete junction box (Str # 6) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 3 | 6 ft x 20 ft R.C Concrete junction box (str # 7) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 4 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 5 | 60" DIA I D 16GA CORR Aluminized T2 pipe Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 340 | 6 | 36" DIA I D RCP Pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 7 | | | | Next F-2502C-Alternate 2 Code Description UOM Qty 1 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 13 2 7.5 ft x 12 ft R.C Concrete junction box (Str # 6) Complete in Place over 12" crushed rock, Tie-in included Each 1 3 6 ft x 20 ft R.C Concrete junction box (str # 7) Complete in Place over 12" crushed rock, Tie-in included Each 1 4 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included Each 1 5 60" DIA I D 16GA CORR Aluminized T2 pipe Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 340 6 36" DIA I D RCP Pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 7 | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 13 | 2 | 7.5 ft x 12 ft R.C Concrete junction box (Str # 6) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 3 | 6 ft x 20 ft R.C Concrete junction box (str # 7) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 4 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 5 | 60" DIA I D 16GA CORR Aluminized T2 pipe Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 340 | 6 | 36" DIA I D RCP Pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 7 | | | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 13 | | 2 | 7.5 ft x 12 ft R.C Concrete junction box (Str # 6) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 3 | 6 ft x 20 ft R.C Concrete junction box (str # 7) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 4 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 5 | 60" DIA I D 16GA CORR Aluminized T2 pipe Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 340 | | 6 | 36" DIA I D RCP Pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 7 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next F-2502C-Base Bid Code Description UOM Qty 1 Traffic Control Lump-Sum 1 2 Mobilization Lump-Sum 1 3 Bonds and Insurance Lump-Sum 1 4 Clearing and Grubbing Lump-Sum 1 5 Construction Staking Lump-Sum 1 6 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 391 7 Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A Aggregate Base including Curb & Gutter Square Yard 213 8 (streets and driveways) Linear Foot/Feet 470 9 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Completed in Place including beddings as per standards attached Each 1 10 66"x51" CORR AL T2 STEEL END SECTION, Installed. Completed in Place including bedding as per standards attached Each 1 11 66"x51" CORR AL T2 STEEL TRASH SECTION, Installed. Complete in Place Linear Foot/Feet 15 12 12" Reinforced Concrete Pipe connection, Installed, Complete in Place Each 2 13 7.5 ft x 4 ft R.C Concrete junction box Complete in Place over 12" crushed rock, Tie-in included (ST #1 AND STR # 2) Square Foot/Feet 9000 14 Sodding Completed in Place Square Yard 70 15 Grouted Riprap 24" thick Linear Foot/Feet 24 | 1 | Traffic Control | Lump-Sum | 1 | 2 | Mobilization | Lump-Sum | 1 | 3 | Bonds and Insurance | Lump-Sum | 1 | 4 | Clearing and Grubbing | Lump-Sum | 1 | 5 | Construction Staking | Lump-Sum | 1 | 6 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 391 | 7 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A Aggregate Base including Curb & Gutter | Square Yard | 213 | 8 | (streets and driveways) | Linear Foot/Feet | 470 | 9 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Completed in Place including beddings as per standards attached | Each | 1 | 10 | 66"x51" CORR AL T2 STEEL END SECTION, Installed. Completed in Place including bedding as per standards attached | Each | 1 | 11 | 66"x51" CORR AL T2 STEEL TRASH SECTION, Installed. Complete in Place | Linear Foot/Feet | 15 | 12 | 12" Reinforced Concrete Pipe connection, Installed, Complete in Place | Each | 2 | 13 | 7.5 ft x 4 ft R.C Concrete junction box Complete in Place over 12" crushed rock, Tie-in included (ST #1 AND STR # 2) | Square Foot/Feet | 9000 | 14 | Sodding Completed in Place | Square Yard | 70 | 15 | Grouted Riprap 24" thick | Linear Foot/Feet | 24 | | | 1 | Traffic Control | Lump-Sum | 1 | | 2 | Mobilization | Lump-Sum | 1 | | 3 | Bonds and Insurance | Lump-Sum | 1 | | 4 | Clearing and Grubbing | Lump-Sum | 1 | | 5 | Construction Staking | Lump-Sum | 1 | | 6 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 391 | | 7 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A Aggregate Base including Curb & Gutter | Square Yard | 213 | | 8 | (streets and driveways) | Linear Foot/Feet | 470 | | 9 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Completed in Place including beddings as per standards attached | Each | 1 | | 10 | 66"x51" CORR AL T2 STEEL END SECTION, Installed. Completed in Place including bedding as per standards attached | Each | 1 | | 11 | 66"x51" CORR AL T2 STEEL TRASH SECTION, Installed. Complete in Place | Linear Foot/Feet | 15 | | 12 | 12" Reinforced Concrete Pipe connection, Installed, Complete in Place | Each | 2 | | 13 | 7.5 ft x 4 ft R.C Concrete junction box Complete in Place over 12" crushed rock, Tie-in included (ST #1 AND STR # 2) | Square Foot/Feet | 9000 | | 14 | Sodding Completed in Place | Square Yard | 70 | | 15 | Grouted Riprap 24" thick | Linear Foot/Feet | 24 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | Traffic Control | Lump-Sum | 1 | | 2 | Mobilization | Lump-Sum | 1 | | 3 | Bonds and Insurance | Lump-Sum | 1 | | 4 | Clearing and Grubbing | Lump-Sum | 1 | | 5 | Construction Staking | Lump-Sum | 1 | | 6 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 391 | | 7 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A Aggregate Base including Curb & Gutter | Square Yard | 213 | | 8 | (streets and driveways) | Linear Foot/Feet | 470 | | 9 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Completed in Place including beddings as per standards attached | Each | 1 | | 10 | 66"x51" CORR AL T2 STEEL END SECTION, Installed. Completed in Place including bedding as per standards attached | Each | 1 | | 11 | 66"x51" CORR AL T2 STEEL TRASH SECTION, Installed. Complete in Place | Linear Foot/Feet | 15 | | 12 | 12" Reinforced Concrete Pipe connection, Installed, Complete in Place | Each | 2 | | 13 | 7.5 ft x 4 ft R.C Concrete junction box Complete in Place over 12" crushed rock, Tie-in included (ST #1 AND STR # 2) | Square Foot/Feet | 9000 | | 14 | Sodding Completed in Place | Square Yard | 70 | | 15 | Grouted Riprap 24" thick | Linear Foot/Feet | 24 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next F-2502C-Alternate 1 Code Description UOM Qty 1 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 46 2 Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A aggregate base including Curb & Gutter (streets and driveways) Linear Foot/Feet 33 3 5 ft x 41 ft R.C Concrete junction box (str # 3) Complete in Place over 12" crushed rock, Tie-in included Each 1 4 6 ft x 19ft R.C Concrete junction box (str # 4) Complete in Place over 12" crushed rock, Tie-in included Each 1 5 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included Each 1 6 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Complete in Place including beddings as per standards attached Linear Foot/Feet 8 7 60" DIA I D 16GA CORR Aluminized T2 pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 294 8 Bore & install 24" DIA I D HDPE Pipe (ADS N-12 WT IB PIPE-per AASTO Specification) Complete in Place including tie-ins and beddings as per standards attached. Linear Foot/Feet 26 | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 46 | 2 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A aggregate base including Curb & Gutter (streets and driveways) | Linear Foot/Feet | 33 | 3 | 5 ft x 41 ft R.C Concrete junction box (str # 3) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 4 | 6 ft x 19ft R.C Concrete junction box (str # 4) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 5 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 6 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Complete in Place including beddings as per standards attached | Linear Foot/Feet | 8 | 7 | 60" DIA I D 16GA CORR Aluminized T2 pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 294 | 8 | Bore & install 24" DIA I D HDPE Pipe (ADS N-12 WT IB PIPE-per AASTO Specification) Complete in Place including tie-ins and beddings as per standards attached. | Linear Foot/Feet | 26 | | | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 46 | | 2 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A aggregate base including Curb & Gutter (streets and driveways) | Linear Foot/Feet | 33 | | 3 | 5 ft x 41 ft R.C Concrete junction box (str # 3) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 4 | 6 ft x 19ft R.C Concrete junction box (str # 4) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 5 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 6 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Complete in Place including beddings as per standards attached | Linear Foot/Feet | 8 | | 7 | 60" DIA I D 16GA CORR Aluminized T2 pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 294 | | 8 | Bore & install 24" DIA I D HDPE Pipe (ADS N-12 WT IB PIPE-per AASTO Specification) Complete in Place including tie-ins and beddings as per standards attached. | Linear Foot/Feet | 26 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 46 | | 2 | Sawcut, remove pavement and replace with 9" thick P.C. Concrete over 12 thick Type A aggregate base including Curb & Gutter (streets and driveways) | Linear Foot/Feet | 33 | | 3 | 5 ft x 41 ft R.C Concrete junction box (str # 3) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 4 | 6 ft x 19ft R.C Concrete junction box (str # 4) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 5 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 6 | 66"x51" CORR AL T2 STEEL Arch Pipe, Installed Complete in Place including beddings as per standards attached | Linear Foot/Feet | 8 | | 7 | 60" DIA I D 16GA CORR Aluminized T2 pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 294 | | 8 | Bore & install 24" DIA I D HDPE Pipe (ADS N-12 WT IB PIPE-per AASTO Specification) Complete in Place including tie-ins and beddings as per standards attached. | Linear Foot/Feet | 26 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next F-2502C-Alternate 2 Code Description UOM Qty 1 Remove Existing 24" Reinforced Concrete Pipe Linear Foot/Feet 13 2 7.5 ft x 12 ft R.C Concrete junction box (Str # 6) Complete in Place over 12" crushed rock, Tie-in included Each 1 3 6 ft x 20 ft R.C Concrete junction box (str # 7) Complete in Place over 12" crushed rock, Tie-in included Each 1 4 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included Each 1 5 60" DIA I D 16GA CORR Aluminized T2 pipe Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 340 6 36" DIA I D RCP Pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached Linear Foot/Feet 7 | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 13 | 2 | 7.5 ft x 12 ft R.C Concrete junction box (Str # 6) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 3 | 6 ft x 20 ft R.C Concrete junction box (str # 7) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 4 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | 5 | 60" DIA I D 16GA CORR Aluminized T2 pipe Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 340 | 6 | 36" DIA I D RCP Pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 7 | | | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 13 | | 2 | 7.5 ft x 12 ft R.C Concrete junction box (Str # 6) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 3 | 6 ft x 20 ft R.C Concrete junction box (str # 7) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 4 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 5 | 60" DIA I D 16GA CORR Aluminized T2 pipe Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 340 | | 6 | 36" DIA I D RCP Pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 7 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | Remove Existing 24" Reinforced Concrete Pipe | Linear Foot/Feet | 13 | | 2 | 7.5 ft x 12 ft R.C Concrete junction box (Str # 6) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 3 | 6 ft x 20 ft R.C Concrete junction box (str # 7) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 4 | 4 ft x 7ft R.C Concrete junction box (str # 5) Complete in Place over 12" crushed rock, Tie-in included | Each | 1 | | 5 | 60" DIA I D 16GA CORR Aluminized T2 pipe Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 340 | | 6 | 36" DIA I D RCP Pipe, Installed, Complete in Place including, tie-ins and beddings as per standards attached | Linear Foot/Feet | 7 |

    Key dates

    1. April 2, 2026Published
    2. May 1, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.