Active SLED Opportunity · MICHIGAN · GLEESON CONSTRUCTORS
AI Summary
Tenant build-out construction for a 34,462 SF Club Studio in Wilmette, IL. Includes demolition, concrete, masonry, steel, carpentry, finishes, mechanical and electrical systems. Project starts June 15, 2026, duration 210 days. Bids due May 19, 2026.
Bidding Instructions: · Send all bids to estimating@gleesonconstructors.com. Uploading to buildingconnected.com is NOT necessary. · Construct: Anticipated Start Date 6-15-2026 · Project duration is 210 days Tenant Build-out for a new 34,462 SF Club Studio Division 2 Existing Conditions: Selective Demolition for Remodeling Division 3 Concrete: Cast-in-Place Concrete, Concrete Slabs, Concrete Curb Division 4 Masonry: Masonry Mortar and Grout, Unit Masonry Assemblies Division 5 Metals: Structural Steel, Steel Joists, Cold-Formed Metal Framing, Metal Fabrications, Handrails and Railings, Decorative Formed Metal, Expansion Joint Cover Assemblies Division 6 Wood and Plastics: Rough Carpentry, Millwork, Plastic paneling, Solid Surface Countertops Division 7 Thermal and Moisture Protection : Sheet Waterproofing, Building Insulation, Vapor Retarders, Air Barriers, Roof Repair (Landlord Required Contractor), Sheet Metal Flashing and Trim, Firestopping, Joint Sealers, Bentonite Waterproofing Doors and Windows: Standard Steel Doors, Standard Steel Frames, Flush Wood Doors, Access Doors and Panels, Aluminum-Framed Windows and Doors, All Glass Entrances, Door Hardware, Glazing, Mirrors, Window Film Division 9 Finishes: Gypsum Board Assemblies, Gypsum Fabrications, Tile, Acoustical Ceilings, Vinyl Sheet Flooring, Linoleum Sheet Flooring, Resilient Tile Flooring, Porcelain Tile Carpet, Wall Covering, Sanitary Wall Panels (FRP), Paints and Coatings, Concrete Floor Sealer, Sound Absorbing Panels, Graffiti Resistant Coatings Division 10 Specialties: Metal Toilet Compartments, Wall and Corner Guards, Interior Code Required Signs, Plastic Laminate and Expanded PVC Lockers, Fire Extinguishers and Cabinets, Toilet Accessories, Self-Illuminating Exit Marking Division 11 Equipment: Boxing Bag Support Structure, Laundry Equipment, Towel Sensor Division 12 Furnishings: Floor Mats, Window Shades, Moss Wall, Green Wall, Drapery Division 13 Special Construction : Saunas, Fire Alarm, Electronic Article Surveillance System, Cryotherapy Rooms (By Owner) Division 14 Conveying Systems: N/A Division 15 Mechanical : Mechanical Demolition, Relocation and Alteration, Basic Piping Materials and Methods, Common Motor Requirements for HVAC Equipment, Mechanical Insulation, Fire Protection, Plumbing Fixtures, Plumbing Equipment, Domestic Water Heaters, Packaged Rooftop Air Conditioning Units, Terminal Heating and Cooling Units, Air Distribution, Fans, Testing, Adjusting, and Balancing, CryoBuilt Condenser Piping Division 16 Electrical: Electrical Demolition, Relocation and Alteration, Grounding and Bonding, Electrical Hangers and Supports, Electrical Identification, Building Wire and Cable, Wiring Devices, Floor Boxes, Electrical Utility Services, Variable Frequency Controllers, Enclosed Switches, Enclosed Circuit Breakers, Enclosed Controllers, Switchboards and Panelboards, Dry Type Transformers, Interior Luminaires, Low Voltage and CCTV Conduit System, Audio Equipment Installation, Camera Installation
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.