    AI Summary

    Greenville County Schools seeks Construction Manager at Risk services for a 50,000 sq ft second floor renovation at M.T. Anderson Support Center. The project includes interior demolition, HVAC, electrical, fire alarm system installation, and full restoration after a fire. Proposals due by June 22, 2026.

    Opportunity details

    Solicitation No.
    271536
    Type / RFx
    RFP
    Status
    open
    Level
    education
    Published Date
    June 3, 2026
    Due Date
    June 22, 2026
    NAICS Code
    236220AI guide
    Agency
    Greenville County Schools

    Description

    The School District of Greenville County (District) invites interested firms to submit a proposal response to provide Construction Manager at Risk Services for a Second Floor Renovation/Restoration Project at the District's M.T. Anderson Support Center located at 100 Blassingame Road, Greenville, South Carolina 29605 in accordance with the Specifications and Terms and Conditions of this solicitation.

    An overview of the project consists of renovation to approximately 50,000 +/- square feet of the second floor of the District's M.T. Anderson Support Center. Renovation to include minimal demolition of existing interior, non-structural partitions; construction of new interior partitions; installation of HVAC VRF systems for newly created offices; re-work of existing electrical to accommodate updated office and workspace layouts; installation of associated finishes to work described above. Project scope also includes new fire alarm system throughout building and BDA system, if required.

    The work scope is the result of a fire. The remediation work will be fully complete and the space restored to its original condition. The second floor has been cleared for full occupancy. Further details of the project may be found in the Scope of Work and Attachment sections of this solicitation.

    Project Details

    • Reference ID: 326-87
    • Department: Construction Services
    • Department Head: Jamie Benton (Director of Construction Services)

    Important Dates

    • Questions Due: 2026-06-10T15:00:00.000Z

    Evaluation Criteria

    • Pre-Construction Phase Services (Lump Sum) Fee (1 pts)
    • General Conditions (Lump Sum) Fee (8 pts)

      (Cost Structure for General Conditions Document)

    • Construction Manager's Overhead, Profit, Bond and Insurance Fee (CM Fee) (10 pts)
    • Firm General Information/ Organization (2 pts)
    • Financial and Bonding Information (Confidential) (2 pts)
    • History/ Prior Performance (2 pts)
    • Office Space Renovation Project Experience (18 pts)
      • OSF Project Experience; Renovation Project Experience in Occupied Buildings
      • K-12 Project Experience (as applicable to this Project Scope)
    • Project Management/ Supervision/ Project Team (18 pts)
    • Safety and Quality Program (2 pts)
    • Professional Response to RFP (2 pts)
    • CM Project Team for this Project (10 pts)

      o Organization and Supervision Plan

      o Recent / Relevant Office Renovation Experience for Team Members

      o Experience With SC Department of Education Office of School Facilities

    • Pre-Construction Services (10 pts)
      • Roles and Responsibilities / OAC Coordination
      • Design Development & Construction Documents Phases
      • Budgetary Evaluation and Reconciliation
      • Subcontractor Solicitation / Selection
      • Material Delivery Schedules
      • Subcontractor Scope Reconciliation
      • Establish Milestone Schedule
      • GMP Package(s)
    • Construction Phase Services (10 pts)
      • Project phasing plan, if applicable
      • Detailed Scheduling Efforts
      • Budgetary Maintenance
      • Coordination / Communication of Pre-Inspections, Systems Testing and Project Commissioning
      • OSF/ Occupancy Inspections
    • Post Occupancy (5 pts)

      o Project Closeout

      o Warranty

    Submission Requirements

    • Confirmation (required)

      By submission of a response, the Proposer certifies that it has read and understands all of the requirements contained in this solicitation and agrees to be bound by all the terms and conditions of this solicitation without exception. It is understood that no payment will be made until the project is completed in accordance with the specifications set forth within this solicitation. The Proposer has availed itself of every opportunity to understand the requirements of this solicitation. 

    • Is your firm a Minority Owned business? (required)

      This is for District informational purposes only and all offerors will be equally considered for award in accordance with the requirements of this solicitation.

    • Proposal Response Certification (required)

      Please download the below documents, complete, and upload.

    • Drug Free Workplace Certification (required)

      Please download the below documents, complete, and upload.

    • Proposal Submission (required)
    • W9 Submission (GCS Alternate W9 Required) (required)

      Please download the below documents, complete, and upload.

    • Proof of Insurance (required)
    • Business License (required)

      If applicable.

    • Please provide information regarding Performance and Payment bonds.
    • Will there be a Pre-Proposal Meeting? (required)
    • Will your meeting be Mandatory or Non-Mandatory? (required)
    • An award resulting from this solicitation will be for _____(__)_____ from the date of award (required)
    • Will this project include an option to extend? (required)
    • Extension: option to extend for _____(__)_____ annually (required)

      Example: one (1) year

    • The award and period of performance is valid annually and shall not exceed _____(__)_____ in total. (required)

      Example: five (5) years

    • Is Solicitation Security required for your project? (required)
    • Will this project require Performance and Payment Bonds? (required)
    • Will you be collecting specific pricing (using a pricing table)? (required)

    Key dates

    1. June 3, 2026Published
    2. June 22, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.