Active SLED Opportunity · OREGON · OREGON
AI Summary
Construction services opportunity for seating removal, electrical and mechanical improvements at Hult Center, Eugene, OR. Includes lighting upgrades, cooling system installation, and roof modifications. Mandatory pre-bid conference on May 13, 2026.
Base bid: Remove seating platforms & light upgrades. Alternate 1: Add cooling to existing spot booth. Work requires installing cooling unit in the spot booth. and roof top unit. Extending electrical through Silva Hall (above ceiling), opening gypsum plenum between roof structure and patching, core drilling, membrane roof modifications, and other work as shown on drawings. Pre Bid Conference: Pre-bid conference is mandatory for Prime Bidders. Mechanical and Electrical Subcontractors are encouraged to attend. The Pre-Bid Conference will be held on May 13, 2026, 9am at the Hult Center for Preforming Arts, 1 Eugene Center, Eugene, OR 97401.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.