SLED Opportunity · IOWA · IOWA CITY
AI Summary
Iowa City seeks bids for structural and electrical upgrades and reconstruction of Collector Well No. 1 at the Water Purification Plant, including roof reconstruction, equipment upgrades, and well rehabilitation. Bids due by February 10, 2026.
Description of Work: This project includes the reconstruction of the Collector Well No. 1 house concrete roof to accommodate new access hatches, upgrades to existing pumping, electrical, and HVAC equipment, as well as the rehabilitation of the collector well with construction of two new 12-inch laterals, and the connection of the new sludge lagoon effluent line, and is located at the Iowa City Water Purification Plant at 80 Stephen Atkins Dr, in Iowa City, IA 52240 Project Schedule Info: Specified Start Date: March 30, 2026 Milestone 1: September 19, 2026 Substantial Completion Date: July 30, 2027 Final Completion Date: August 30, 2027 Engineer’s Estimate: $3,480,000. Bid Deadline: February 10, 2026 at 3:00PM - CST, Date Plans Available: January 7, 2026 Obtain Plans From: Rapids Reproduction, Inc. 415 Highland Ave. Iowa City, IA 52240 Phone: (319) 354-5950, iowacity@rapidsrepro.com Pre-Bid Meeting: Will there be a pre-bid meeting? Yes Date – February 2, 2026 Time – 10:00AM Location – Emma J Harvat Hall, at the City Hall in Iowa City 410 East Washington Street, Iowa City, Iowa, 52240 Mandatory? Yes Project Engineer: Alin Dumachi City of Iowa City 410 East Washington Street Iowa City, IA 52240 (319) 356-5143 Alin-Dumachi@iowa-city.org
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.