    AI Summary

    Seeking Construction Manager at Risk services for PFAS treatment improvements at Fort Benning and North Columbus water facilities in Georgia. Project includes construction of granular activated carbon treatment and other PFAS treatment technologies to meet regulatory standards.

    Opportunity details

    Solicitation No.
    69f230746c2904abd94a97a3
    Type / RFx
    RFP
    Status
    Active
    Level
    local
    Published Date
    April 30, 2026
    Due Date
    June 4, 2026
    NAICS Code
    237310AI guide
    State
    Georgia
    Agency
    Columbus Water Works

    Description

    Competitive sealed Proposals (“Proposal”) for Construction Manager at Risk ("CMAR") services related to the preconstruction and construction of per- and polyfluoroalkyl substances (“PFAS”) Treatment Improvements at the Fort Benning Water Treatment Plant ("FBWTP") and the North Columbus Water Resources Facility ("NCWRF"). 

    Owner owns and operates the FBWTP on Fort Benning Army Post and the NCWRF in Columbus, Georgia. Both facilities face current or anticipated regulatory requirements related PFAS that necessitate implementation of new PFAS treatment facilities and associated improvements. At FBWTP, pilot testing and preliminary engineering have identified granular activated carbon ("GAC") as the selected PFAS treatment technology. At NCWRF, PFAS improvements will be designed to meet Owner's regulatory and operational objectives for that facility.

    The Project consists of a two-phase PFAS treatment program to be delivered under a single CMAR contract:

    Phase 1 - FBWTP PFAS Treatment Improvements: Construction of new GAC treatment facilities and associated improvements at FBWTP to achieve compliance with applicable PFAS drinking water standards and to integrate with existing treatment processes.

    Phase 2 - NCWRF PFAS Treatment Improvements: Construction of PFAS treatment facilities and associated improvements at NCWRF to provide PFAS treatment capacity consistent with regulatory and operational objectives. The Owner has an ongoing pilot study and technology evaluation. Selected technology will be determined after the piloting phase concludes.

    Please direct all questions related to this Project to the Q&A Section. 

    ## Details **Bid/Project ID:** CWW26028 **Type of Work:** PFAS Treatment Facilities **Pre-Bid Notes:** No Pre-Proposal Conference has been scheduled. An optional site visit to the FBWTP and NCWRF will be provided May 14th from 9:00am EST to 1:00pm EST. **Bid Location:** Columbus Water Works, 1421 Veterans Parkway, Columbus, Georgia 31901 **Engineer/Publisher:** Freese and Nichols, Inc. **Engineer Address:** 1201 Front Avenue, Suite N, Columbus, Georgia, 31901

    Key dates

    1. April 30, 2026Published
    2. June 4, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.