SLED Opportunity · OKLAHOMA · CITY OF ENID
AI Summary
City of Enid seeks bids for an annual concrete pavement repair program. The project involves replacing failed concrete sections. Bids due by July 31, 2026, with a recommended pre-bid conference on July 22, 2026.
This is an annual program that includes the replacement of failed concrete pavement sections across Enid. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.1158120.C16639226 **Piggyback Contract**: No **Question Acceptance Deadline**: 07/24/2026 01:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic or Physical Bid Submission **Owner Organization**: City of Enid **Reference Number**: 0000429364 **Pricing**: Item Based **Bid Documents List**: | Question Name | Question Description | Mandatory | |---|---|---| | Base Bid Calendar Days | Please enter in your calendar days. | Yes | **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Instruction to Bidders | Signed, 1 page | Yes | Yes | | Non-Collusion Affidavit | Signed & Notarized, 1 page | Yes | Yes | | Business Relationships Affidavit | Signed & Notarized, 2 pages | Yes | Yes | | Acknowledgements | Signed & Notarized, 1 page | Yes | Yes | | Proposal Documents | Line Item sheet(s) & Notarized page | Yes | Yes | | Addendum(s) | Signed Acknowledgement & Proposal (if posted) | No | No | **Pre-Bidding Events**: Event: Prebid Conference | Date: 07/22/2026 11:00 AM EDT | Location: Conference Room B & via Zoom **Line Items**: | description | uom | quantity | |---|---|---| | Next R-2701C-Base Bid Code Description UOM Qty 1 Bonds And Insurance Lump-Sum 1 2 Mobilization Lump-Sum 1 3 Traffic Control Local Streets Lump-Sum 10 4 Traffic Control Collector Streets Lump-Sum 5 5 Saw Cut Full Depth Linear Foot/Feet 250 6 Remove Old Concrete Sub Base And Dispose Square Yard 1000 7 6" Rock Sub Base (1 ½” Crush And Run) Square Yard 1000 8 4" P.C.C. Sidewalks Complete In Place Square Yard 50 9 6” P.C.C. Curb And Gutter Complete In Place Linear Foot/Feet 250 10 6” P.C.C. Pavement Complete In Place Square Yard 700 11 8" P.C.C. Pavement Complete In Place Square Yard 300 12 Truncated Domes, Complete In Place Square Foot/Feet 16 13 Inlet Box, Complete In Place Each 1 | 1 | | | 1 | Bonds And Insurance | | | Bonds And Insurance | Lump-Sum | 1.0 | | Mobilization | Lump-Sum | 1.0 | | Traffic Control Local Streets | Lump-Sum | 10.0 | | Traffic Control Collector Streets | Lump-Sum | 5.0 | | Saw Cut Full Depth | Linear Foot/Feet | 250.0 | | Remove Old Concrete Sub Base And Dispose | Square Yard | 1000.0 | | 6" Rock Sub Base (1 ½” Crush And Run) | Square Yard | 1000.0 | | 4" P.C.C. Sidewalks Complete In Place | Square Yard | 50.0 | | 6” P.C.C. Curb And Gutter Complete In Place | Linear Foot/Feet | 250.0 | | 6” P.C.C. Pavement Complete In Place | Square Yard | 700.0 | | 8" P.C.C. Pavement Complete In Place | Square Yard | 300.0 | | Truncated Domes, Complete In Place | Square Foot/Feet | 16.0 | | Inlet Box, Complete In Place | Each | 1.0 | **Questions and Answers**: | Question | Answer | |---|---| | Contract Term What is the contract term? Is the contract renewable? If yes, how many renewals? Arrow Right Answer: The contract term is up to the contractor. This contract is for the concrete repairs needed over the span of 1 budget year. Renews are available if the budget allows. | Contract Term What is the contract term? Is the contract renewable? If yes, how many renewals? Arrow Right Answer: The contract term is up to the contractor. This contract is for the concrete repairs needed over the span of 1 budget year. Renews are available if the budget allows. | | Anticipated Funding What is the estimated amount of money that will be spent under this contract? Arrow Right Answer: The budget for this project is estimated around $150K. | Anticipated Funding What is the estimated amount of money that will be spent under this contract? Arrow Right Answer: The budget for this project is estimated around $150K. | | Contract Capacity Is there a maximum dollar amount that the contract can reach before it’s rebid or renewed? Arrow Right Answer: No. The dollar amount is based on the budget at the time. | Contract Capacity Is there a maximum dollar amount that the contract can reach before it’s rebid or renewed? Arrow Right Answer: No. The dollar amount is based on the budget at the time. | | Contract History Is this a new contract with the City of Enid or is this a rebid for an existing contract? If this is a rebid for an existing contract, would you please provide the name of the previous contract? Arrow Right Answer: This is a new contract for FY27. This is an annual project. The last contract name was Concrete Point Repair R-2602C, awarded to Jackson Civil LLC. | Contract History Is this a new contract with the City of Enid or is this a rebid for an existing contract? If this is a rebid for an existing contract, would you please provide the name of the previous contract? Arrow Right Answer: This is a new contract for FY27. This is an annual project. The last contract name was Concrete Point Repair R-2602C, awarded to Jackson Civil LLC. | | Documents and Items Are plans available for this project, or is there a location map that can be referenced? Arrow Right Answer: No. This information will be provided upon award. | Documents and Items Are plans available for this project, or is there a location map that can be referenced? Arrow Right Answer: No. This information will be provided upon award. | | Line Items What is the design or size of the inlet? How many mobilizations are planned for this project? How many locations are planned? Arrow Right Answer: The specifications for the inlet is provided in Addendum No. 1. There is one mobilization for this project. The quantities plan for 15 locations as reflected by the number of traffic control. | Line Items What is the design or size of the inlet? How many mobilizations are planned for this project? How many locations are planned? Arrow Right Answer: The specifications for the inlet is provided in Addendum No. 1. There is one mobilization for this project. The quantities plan for 15 locations as reflected by the number of traffic control. | **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 1 | 07/24/2026 05:19 PM EDT | | **Communications**: - Communication No.1 - 07/24/2026 05:19 PM EDT - Communication Documents - Document: Pre-Bid Sign In Sheet.pdf
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.