SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS
AI Summary
The City of Oklahoma City seeks bids for constructing a new Air Traffic Control Tower at Wiley Post Airport. Contractors must be pre-qualified. Mandatory pre-bid conference on July 22, 2026. Electronic bid submission due by August 5, 2026.
For this project, Contractor must be Pre-qualified as listed by the Pre-qualification Review Board under the provisions of Ordinance No. 26,614 approved by City Council on December 8, 2020. The Pre-qualification area/s acceptable for this project are as follows: Building contractor “A”. ... **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Question Acceptance Deadline**: 07/27/2026 01:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Oklahoma City Airport Trust **Reference Number**: 0000426525 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event: Prebid Conference | Date: 07/22/2026 12:00 PM EDT | Location: 7100 Terminal Dr, Oklahoma City, OK 73159 | Mandatory: True **Line Items**: | description | uom | quantity | |---|---|---| | Next 1-Base Bid Code Description UOM Qty 1 Construct New Air Traffic Control Tower Lump-Sum 1 | 1 | | | 1 | Construct New Air Traffic Control Tower | | | Construct New Air Traffic Control Tower | Lump-Sum | 1.0 | **Questions and Answers**: | Question | Answer | |---|---| | Div-21 Water Supply Please provide preliminary water supply data (static, residual, gpm) that was utilized to determine fire pump ratings. Arrow Right Answer: See note on Plan Sheet C09. | Div-21 Water Supply Please provide preliminary water supply data (static, residual, gpm) that was utilized to determine fire pump ratings. Arrow Right Answer: See note on Plan Sheet C09. | | Triple C Substitution Request Please see the attached substitution request for the Wiley Post Airport Air Traffic Control Tower. Thank you in advance for your time and consideration. https://www.dropbox.com/scl/fi/hkenalpylp1qmikqdng55/Wiley-Post-Airport-Air-Traffic-Control-substituion-request-form.pdf?rlkey=mmj71f7ev07v17szey2i48c0z&dl=0 https://www.dropbox.com/scl/fi/1rkz2hef3wjo7p9a4sm55/Wiley-Post-Airport-Air-Traffic-Control-submittal.pdf?rlkey=x8h6yzrxx58oa7ealit7w9qut&dl=0 Thanks! Arrow Right Answer: NO EXCEPTION TAKEN: Manufacturer only. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Triple C Substitution Request Please see the attached substitution request for the Wiley Post Airport Air Traffic Control Tower. Thank you in advance for your time and consideration. https://www.dropbox.com/scl/fi/hkenalpylp1qmikqdng55/Wiley-Post-Airport-Air-Traffic-Control-substituion-request-form.pdf?rlkey=mmj71f7ev07v17szey2i48c0z&dl=0 https://www.dropbox.com/scl/fi/1rkz2hef3wjo7p9a4sm55/Wiley-Post-Airport-Air-Traffic-Control-submittal.pdf?rlkey=x8h6yzrxx58oa7ealit7w9qut&dl=0 Thanks! Arrow Right Answer: NO EXCEPTION TAKEN: Manufacturer only. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | AISC Certification In specification section 0512100 Structural Steel Framing there is a requirement for fabricators and erectors could these certifications be waived? Arrow Right Answer: The Contractor shall refer to IBC 2018 Chapter 17 with 2021 Oklahoma amendments and AISC 360 for all additional third-party steel fabrication and inspection requirements if the erector is not AISC fabricator certified. Also see schedule of special inspections on the structural drawings. | AISC Certification In specification section 0512100 Structural Steel Framing there is a requirement for fabricators and erectors could these certifications be waived? Arrow Right Answer: The Contractor shall refer to IBC 2018 Chapter 17 with 2021 Oklahoma amendments and AISC 360 for all additional third-party steel fabrication and inspection requirements if the erector is not AISC fabricator certified. Also see schedule of special inspections on the structural drawings. | | Site electrical Could an electrical site plan be published including locations of light pole and the generator pad? Arrow Right Answer: See Sheet EU-401 of the published plan set. | Site electrical Could an electrical site plan be published including locations of light pole and the generator pad? Arrow Right Answer: See Sheet EU-401 of the published plan set. | | funding Agency Who is the funding agency Arrow Right Answer: Funds for this project will be provided by Federal Aviation Administration (FAA) and Oklahoma City Airport Trust (OCAT). | funding Agency Who is the funding agency Arrow Right Answer: Funds for this project will be provided by Federal Aviation Administration (FAA) and Oklahoma City Airport Trust (OCAT). | | BID INFORMATION What all specifically is needed to be submitted at bid time? Is this job Tax Exempt? Is this job Prevailing Wage/Davis Bacon? What are the Completion days for this project? What are the Liquidated Damages for this project? When is the start time and is there a delayed start option? Will there be any permits and who will they be paid by? Is this job American Iron & Steel? Is this job Buy American Build American? Arrow Right Answer: See OCAT 00020, OCAT 00025, and OCAT 00401 for the information regarding these questions. Project start is anticipated to be early October. Actual start date will be coordinated with the successful bidder. | BID INFORMATION What all specifically is needed to be submitted at bid time? Is this job Tax Exempt? Is this job Prevailing Wage/Davis Bacon? What are the Completion days for this project? What are the Liquidated Damages for this project? When is the start time and is there a delayed start option? Will there be any permits and who will they be paid by? Is this job American Iron & Steel? Is this job Buy American Build American? Arrow Right Answer: See OCAT 00020, OCAT 00025, and OCAT 00401 for the information regarding these questions. Project start is anticipated to be early October. Actual start date will be coordinated with the successful bidder. | | OKC Standard Specification Section 102.02 -Prequalification In Reference to OKC Standard Specification Section 102.02 -Prequalification to Perform Work. What Trades/Categories are required to be prequalified for this project? Arrow Right Answer: The agency/company submitting the formal bid is required to be prequalified as outlined. | OKC Standard Specification Section 102.02 -Prequalification In Reference to OKC Standard Specification Section 102.02 -Prequalification to Perform Work. What Trades/Categories are required to be prequalified for this project? Arrow Right Answer: The agency/company submitting the formal bid is required to be prequalified as outlined. | | ISC certification on the steel fabrication would you allow waving the requirement for a ISC certification on the steel fabrication, in lieu of inspections? Arrow Right Answer: The Contractor shall refer to IBC 2018 Chapter 17 with 2021 Oklahoma amendments and AISC 360 for all additional third-party steel fabrication and inspection requirements if the erector is not AISC fabricator certified. Also see schedule of special inspections on the structural drawings. | ISC certification on the steel fabrication would you allow waving the requirement for a ISC certification on the steel fabrication, in lieu of inspections? Arrow Right Answer: The Contractor shall refer to IBC 2018 Chapter 17 with 2021 Oklahoma amendments and AISC 360 for all additional third-party steel fabrication and inspection requirements if the erector is not AISC fabricator certified. Also see schedule of special inspections on the structural drawings. | | AISC CERTIFICATION in reference to typo in Question 8" would you allow waving the requirement for a AISC certification on the steel fabrication, in lieu of inspections? Arrow Right Answer: The Contractor shall refer to IBC 2018 Chapter 17 with 2021 Oklahoma amendments and AISC 360 for all additional third-party steel fabrication and inspection requirements if the erector is not AISC fabricator certified. Also see schedule of special inspections on the structural drawings. | AISC CERTIFICATION in reference to typo in Question 8" would you allow waving the requirement for a AISC certification on the steel fabrication, in lieu of inspections? Arrow Right Answer: The Contractor shall refer to IBC 2018 Chapter 17 with 2021 Oklahoma amendments and AISC 360 for all additional third-party steel fabrication and inspection requirements if the erector is not AISC fabricator certified. Also see schedule of special inspections on the structural drawings. | | Funding/Tax With the job being funded by both a tax exempt entity and a taxable entity, please confirm if we are to figure taxes on our bid? Arrow Right Answer: Federal Aviation Administration (FAA) funding is provided to Oklahoma City Airport Trust (OCAT) via grant. All payments to the contractor will be made by OCAT. OCAT is tax exempt and therefore shall not be charged taxes. OCAT's tax exemption doesn't transfer to the successful bidder. Therefore, the bidder should plan to pay taxes on their purchases unless otherwise tax exempt. | Funding/Tax With the job being funded by both a tax exempt entity and a taxable entity, please confirm if we are to figure taxes on our bid? Arrow Right Answer: Federal Aviation Administration (FAA) funding is provided to Oklahoma City Airport Trust (OCAT) via grant. All payments to the contractor will be made by OCAT. OCAT is tax exempt and therefore shall not be charged taxes. OCAT's tax exemption doesn't transfer to the successful bidder. Therefore, the bidder should plan to pay taxes on their purchases unless otherwise tax exempt. | | Permit Numbers & Fees What is the building permit number and are costs by the GC? Is there a fee already assigned for the building permit and impact fee? Arrow Right Answer: The building permit number is BLDC-2026-01055. All cost associated with the permit, including impact fees, are the responsibility of the contractor. Please contact the City of Oklahoma City Development Department to get an estimation of these costs. | Permit Numbers & Fees What is the building permit number and are costs by the GC? Is there a fee already assigned for the building permit and impact fee? Arrow Right Answer: The building permit number is BLDC-2026-01055. All cost associated with the permit, including impact fees, are the responsibility of the contractor. Please contact the City of Oklahoma City Development Department to get an estimation of these costs. | | Substitution Request - Priors on the Light Fixture Schedule please see the below link for the Substitution Request - Priors on the Light Fixture Schedule https://bmclc.sharepoint.com/sites/BMLCPROJECTS/OKC/Forms/AllItems.aspx?id=%2Fsites%2FBMLCPROJECTS%2FOKC%2FBIDDING%20JOBS%2F2026%2F08%2E%20August%2FWILEY%20POST%20NEW%20AIR%20TRAFFIC%20CONTROL%20TOWER%20%2D%202PM%2F1%29%20Bid%20Documents%2FPRIORS%2FPRIORS%5FFOR%5FWILEY%5FPOST%5FNEW%5FAIR%5FTRAFFIC%5FCONTROL%5FTOWER%2Epdf&parent=%2Fsites%2FBMLCPROJECTS%2FOKC%2FBIDDING%20JOBS%2F2026%2F08%2E%20August%2FWILEY%20POST%20NEW%20AIR%20TRAFFIC%20CONTROL%20TOWER%20%2D%202PM%2F1%29%20Bid%20Documents%2FPRIORS&p=true&ga=1 Arrow Right Answer: NO EXCEPTION TAKEN: Manufacturer only. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Substitution Request - Priors on the Light Fixture Schedule please see the below link for the Substitution Request - Priors on the Light Fixture Schedule https://bmclc.sharepoint.com/sites/BMLCPROJECTS/OKC/Forms/AllItems.aspx?id=%2Fsites%2FBMLCPROJECTS%2FOKC%2FBIDDING%20JOBS%2F2026%2F08%2E%20August%2FWILEY%20POST%20NEW%20AIR%20TRAFFIC%20CONTROL%20TOWER%20%2D%202PM%2F1%29%20Bid%20Documents%2FPRIORS%2FPRIORS%5FFOR%5FWILEY%5FPOST%5FNEW%5FAIR%5FTRAFFIC%5FCONTROL%5FTOWER%2Epdf&parent=%2Fsites%2FBMLCPROJECTS%2FOKC%2FBIDDING%20JOBS%2F2026%2F08%2E%20August%2FWILEY%20POST%20NEW%20AIR%20TRAFFIC%20CONTROL%20TOWER%20%2D%202PM%2F1%29%20Bid%20Documents%2FPRIORS&p=true&ga=1 Arrow Right Answer: NO EXCEPTION TAKEN: Manufacturer only. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | ULAOK Substitution Request We would like to submit prior approvals for the lighting on this project. I have attached a link to the submittals as well as the substitution request form. https://ulaok-my.sharepoint.com/:b:/p/quoteme/IQCdtKMRJxmeQpg9uXjnAT3cAe3ukKLDRifNTPZ5-f3wAy4 https://ulaok-my.sharepoint.com/:b:/p/quoteme/IQDqITux4WC8Som7pyEk7hylAeGXqzgug4zv6a8naLzCVAc Arrow Right Answer: NO EXCEPTION TAKEN: Manufacturer only. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | ULAOK Substitution Request We would like to submit prior approvals for the lighting on this project. I have attached a link to the submittals as well as the substitution request form. https://ulaok-my.sharepoint.com/:b:/p/quoteme/IQCdtKMRJxmeQpg9uXjnAT3cAe3ukKLDRifNTPZ5-f3wAy4 https://ulaok-my.sharepoint.com/:b:/p/quoteme/IQDqITux4WC8Som7pyEk7hylAeGXqzgug4zv6a8naLzCVAc Arrow Right Answer: NO EXCEPTION TAKEN: Manufacturer only. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | Lighting Alternates for Approval Bell & McCoy Lighting and Controls would like to offer Lighting Alternates for approval in the link below https://bmclc.sharepoint.com/:b:/s/BMLCPROJECTS/IQAG40S1zBxKRZQsGEQkm-wzAdCZdzAgK_u14ajqkxeUZX4?e=kgkzGE Arrow Right Answer: NO EXCEPTION TAKEN: Manufacturer only. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Lighting Alternates for Approval Bell & McCoy Lighting and Controls would like to offer Lighting Alternates for approval in the link below https://bmclc.sharepoint.com/:b:/s/BMLCPROJECTS/IQAG40S1zBxKRZQsGEQkm-wzAdCZdzAgK_u14ajqkxeUZX4?e=kgkzGE Arrow Right Answer: NO EXCEPTION TAKEN: Manufacturer only. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | 601A Opening Hardware set 10.0 lists opening 601A. This opening is not on the door schedule or floor plans. Please advise. Arrow Right Answer: Revised Hardware Scheduled issued under Addendum 1 | 601A Opening Hardware set 10.0 lists opening 601A. This opening is not on the door schedule or floor plans. Please advise. Arrow Right Answer: Revised Hardware Scheduled issued under Addendum 1 | | Substitution Request - 074213.16 - Metal Plate wall panels please see the below link for substitution request Substitution Request - 074213.16 - Metal Plate wall panels https://www.dropbox.com/scl/fi/gfob6g05xnfuxzyohencl/RFI-Wiley-Post-Air-Traffic-Control-Tower.pdf?rlkey=b98ec8490o1oj20qya5uy2xja&st=krhte619&dl=0 Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Substitution Request - 074213.16 - Metal Plate wall panels please see the below link for substitution request Substitution Request - 074213.16 - Metal Plate wall panels https://www.dropbox.com/scl/fi/gfob6g05xnfuxzyohencl/RFI-Wiley-Post-Air-Traffic-Control-Tower.pdf?rlkey=b98ec8490o1oj20qya5uy2xja&st=krhte619&dl=0 Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | T-501 Detail 5 Question: Please identify the location of the pedestrian gate referenced in Detail 5 on Sheet T-501 and provide the applicable drawing sheet(s), detail references, and any associated specifications required for installation. Question: The Access Control and Video Surveillance systems are specified to communicate over a TCP/IP network; however, the Contract Documents do not clearly indicate whether network drops will be provided for the security systems in Telco Room 105. Requested Clarification: Please confirm whether the telecommunications/data contractor will provide network drops to the following equipment in Telco Room 105: 1. Access Control Panel. 2. CCTV System Control Panel/NVR. Arrow Right Answer: Network drops to the access control panel and CCTV system control panel/NVR will be provided by the Contractor. Reconciled drawings to be issued in an addendum. | T-501 Detail 5 Question: Please identify the location of the pedestrian gate referenced in Detail 5 on Sheet T-501 and provide the applicable drawing sheet(s), detail references, and any associated specifications required for installation. Question: The Access Control and Video Surveillance systems are specified to communicate over a TCP/IP network; however, the Contract Documents do not clearly indicate whether network drops will be provided for the security systems in Telco Room 105. Requested Clarification: Please confirm whether the telecommunications/data contractor will provide network drops to the following equipment in Telco Room 105: 1. Access Control Panel. 2. CCTV System Control Panel/NVR. Arrow Right Answer: Network drops to the access control panel and CCTV system control panel/NVR will be provided by the Contractor. Reconciled drawings to be issued in an addendum. | | 281300 ACS Question: Section 281300 includes requirements for the vehicle gate pedestal, but does not clearly indicate responsibility for furnishing and installing the concrete foundation/pad supporting the pedestal. Requested Clarification: Please confirm whether the concrete pad/foundation for the vehicle gate pedestal is to be provided by the General Contractor or by another trade. Additionally, please provide any applicable foundation details, dimensions, reinforcement requirements, and drawing references if not otherwise shown in the Contract Documents. Arrow Right Answer: The bidder is responsible to provide the concrete pad/foundation for the vehicle gate pedestal. Concrete foundation/pad for the keypad pedestal shall be constructed in the following manner. 1. Minimum area layout size to be 24”x24”. Keypad Manufacturer’s installation manual shall govern. 2. Minimum depth to be 24” deep or 6” below the frost line, whichever is deeper. 3. Concrete compressive strength to be a minimum of 3000 PSI. 4. Reinforcement to be 4 vertical pieces of #4 rebar tied with horizontal ring ties or a small cage framework 5. Top of pad to be set 2” above finished grade. | 281300 ACS Question: Section 281300 includes requirements for the vehicle gate pedestal, but does not clearly indicate responsibility for furnishing and installing the concrete foundation/pad supporting the pedestal. Requested Clarification: Please confirm whether the concrete pad/foundation for the vehicle gate pedestal is to be provided by the General Contractor or by another trade. Additionally, please provide any applicable foundation details, dimensions, reinforcement requirements, and drawing references if not otherwise shown in the Contract Documents. Arrow Right Answer: The bidder is responsible to provide the concrete pad/foundation for the vehicle gate pedestal. Concrete foundation/pad for the keypad pedestal shall be constructed in the following manner. 1. Minimum area layout size to be 24”x24”. Keypad Manufacturer’s installation manual shall govern. 2. Minimum depth to be 24” deep or 6” below the frost line, whichever is deeper. 3. Concrete compressive strength to be a minimum of 3000 PSI. 4. Reinforcement to be 4 vertical pieces of #4 rebar tied with horizontal ring ties or a small cage framework 5. Top of pad to be set 2” above finished grade. | | 281300 Intercom Question: Can the contractor use an intercom other than Aiphone? Arrow Right Answer: Please submit a request for specific equipment substitution that meets the specified requirements. | 281300 Intercom Question: Can the contractor use an intercom other than Aiphone? Arrow Right Answer: Please submit a request for specific equipment substitution that meets the specified requirements. | | 281300 ACS Question: Section 281300 includes requirements for the vehicle gate pedestal but does not clearly indicate responsibility for furnishing and installing the concrete foundation/pad supporting the pedestal. Requested Clarification: Please confirm whether the concrete pad/foundation for the vehicle gate pedestal is to be provided by the General Contractor or by another trade. Additionally, please provide any applicable foundation details, dimensions, reinforcement requirements, and drawing references if not otherwise shown in the Contract Documents. Arrow Right Answer: The bidder is responsible to provide the concrete pad/foundation for the vehicle gate pedestal. Concrete foundation/pad for the keypad pedestal shall be constructed in the following manner. 1. Minimum area layout size to be 24”x24”. Keypad Manufacturer’s installation manual shall govern. 2. Minimum depth to be 24” deep or 6” below the frost line, whichever is deeper. 3. Concrete compressive strength to be a minimum of 3000 PSI. 4. Reinforcement to be 4 vertical pieces of #4 rebar tied with horizontal ring ties or a small cage framework 5. Top of pad to be set 2” above finished grade. | 281300 ACS Question: Section 281300 includes requirements for the vehicle gate pedestal but does not clearly indicate responsibility for furnishing and installing the concrete foundation/pad supporting the pedestal. Requested Clarification: Please confirm whether the concrete pad/foundation for the vehicle gate pedestal is to be provided by the General Contractor or by another trade. Additionally, please provide any applicable foundation details, dimensions, reinforcement requirements, and drawing references if not otherwise shown in the Contract Documents. Arrow Right Answer: The bidder is responsible to provide the concrete pad/foundation for the vehicle gate pedestal. Concrete foundation/pad for the keypad pedestal shall be constructed in the following manner. 1. Minimum area layout size to be 24”x24”. Keypad Manufacturer’s installation manual shall govern. 2. Minimum depth to be 24” deep or 6” below the frost line, whichever is deeper. 3. Concrete compressive strength to be a minimum of 3000 PSI. 4. Reinforcement to be 4 vertical pieces of #4 rebar tied with horizontal ring ties or a small cage framework 5. Top of pad to be set 2” above finished grade. | | Substitution Request - 074213.16 Metal Plate Wall Panels I would like to submit a substitution request for 074213.16 Metal Plate Wall Panels. https://www.dropbox.com/scl/fo/cd208a2eb1eb8ot90ges3/ADJLQu2iQHI1nupTW2eLeZQ?rlkey=mahgsassvxprth78in3al8a0s&st=9yir5q17&dl=0 Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Substitution Request - 074213.16 Metal Plate Wall Panels I would like to submit a substitution request for 074213.16 Metal Plate Wall Panels. https://www.dropbox.com/scl/fo/cd208a2eb1eb8ot90ges3/ADJLQu2iQHI1nupTW2eLeZQ?rlkey=mahgsassvxprth78in3al8a0s&st=9yir5q17&dl=0 Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | Substitution Request - Computer Room Chilled Water AHU Please see the below link for substitution Request Substitution Request - Computer Room Chilled Water AHU https://mechsales-my.sharepoint.com/personal/zsnow_mechsales_com/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments%2FKrueger%20Substitution%20Request%20%2D%20Air%20Traffic%20Control%20Tower%20%2D%20071526%2Epdf&parent=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments&ga=1 Arrow Right Answer: It appears that access to the included link is restricted. We have been unable to access the information. Please resubmit this request with an updated or functional unrestricted link. | Substitution Request - Computer Room Chilled Water AHU Please see the below link for substitution Request Substitution Request - Computer Room Chilled Water AHU https://mechsales-my.sharepoint.com/personal/zsnow_mechsales_com/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments%2FKrueger%20Substitution%20Request%20%2D%20Air%20Traffic%20Control%20Tower%20%2D%20071526%2Epdf&parent=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments&ga=1 Arrow Right Answer: It appears that access to the included link is restricted. We have been unable to access the information. Please resubmit this request with an updated or functional unrestricted link. | | Substitution Request - Computer Room Split Units Please see the below link for substitution Request Substitution Request - Computer Room Split Units https://mechsales-my.sharepoint.com/personal/zsnow_mechsales_com/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments%2FAboveAir%20Substitution%20Request%20%2D%20Air%20Traffic%20Control%20Tower%20%2D%20071526%2Epdf&parent=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments&ga=1 Arrow Right Answer: It appears that access to the included link is restricted. We have been unable to access the information. Please resubmit this request with an updated or functional unrestricted link. | Substitution Request - Computer Room Split Units Please see the below link for substitution Request Substitution Request - Computer Room Split Units https://mechsales-my.sharepoint.com/personal/zsnow_mechsales_com/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments%2FAboveAir%20Substitution%20Request%20%2D%20Air%20Traffic%20Control%20Tower%20%2D%20071526%2Epdf&parent=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments&ga=1 Arrow Right Answer: It appears that access to the included link is restricted. We have been unable to access the information. Please resubmit this request with an updated or functional unrestricted link. | | Substitution Request - Split System Air Conditioners Please see the below link for substitution Request Substitution Request - Split System Air Conditioners https://mechsales-my.sharepoint.com/personal/zsnow_mechsales_com/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments%2FMSM%20Gree%20Subsitution%20Request%20%2D%20Air%20Traffic%20Control%20Tower%20%2D%20071526%2Epdf&parent=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments&ga=1 Arrow Right Answer: It appears that access to the included link is restricted. We have been unable to access the information. Please resubmit this request with an updated or functional unrestricted link. | Substitution Request - Split System Air Conditioners Please see the below link for substitution Request Substitution Request - Split System Air Conditioners https://mechsales-my.sharepoint.com/personal/zsnow_mechsales_com/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments%2FMSM%20Gree%20Subsitution%20Request%20%2D%20Air%20Traffic%20Control%20Tower%20%2D%20071526%2Epdf&parent=%2Fpersonal%2Fzsnow%5Fmechsales%5Fcom%2FDocuments%2FDocuments&ga=1 Arrow Right Answer: It appears that access to the included link is restricted. We have been unable to access the information. Please resubmit this request with an updated or functional unrestricted link. | | Substitution Request - Metal Plate Wall Panels Please see the below link for substitution Request Substitution Request - Metal Plate Wall Panels https://drive.google.com/drive/folders/1MrsQI4wYdxwa4b-a1pr3c1MdR6VY_lPa Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Substitution Request - Metal Plate Wall Panels Please see the below link for substitution Request Substitution Request - Metal Plate Wall Panels https://drive.google.com/drive/folders/1MrsQI4wYdxwa4b-a1pr3c1MdR6VY_lPa Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | Prequalification Is the only prequalification for this project Building A? Arrow Right Answer: Yes, the only prequalification required to bid is Building A as stated in the Project Manual. Other categories of work may require prequalification by the City of Oklahoma City. | Prequalification Is the only prequalification for this project Building A? Arrow Right Answer: Yes, the only prequalification required to bid is Building A as stated in the Project Manual. Other categories of work may require prequalification by the City of Oklahoma City. | | Badging Requirements What are the badging requirements? Arrow Right Answer: No badging will be required on this project. However, airfield driver training will be required through the OKC Will Rogers International Airport Badging Office for all drivers requiring access to the airfield. | Badging Requirements What are the badging requirements? Arrow Right Answer: No badging will be required on this project. However, airfield driver training will be required through the OKC Will Rogers International Airport Badging Office for all drivers requiring access to the airfield. | | Bid Bond name Who do we need to make the bid bond out to? Arrow Right Answer: Please see section OCAT 00020 and OCAT 00535 507.06 for instructions regarding bid security documentation. | Bid Bond name Who do we need to make the bid bond out to? Arrow Right Answer: Please see section OCAT 00020 and OCAT 00535 507.06 for instructions regarding bid security documentation. | | Prequalification in response to Question35 - "Other categories of work may require prequalification by the City of Oklahoma City." we will need to know what subs will be prequalified before bid submission. can we have this clarified in an addendum? Arrow Right Answer: Contractor qualifications, whether prequalified or otherwise, to work on public utilities and other permit requirements are set and enforced by the City of Oklahoma City and are not within the control of the Owner, unless otherwise stated in the contract specifications. | Prequalification in response to Question35 - "Other categories of work may require prequalification by the City of Oklahoma City." we will need to know what subs will be prequalified before bid submission. can we have this clarified in an addendum? Arrow Right Answer: Contractor qualifications, whether prequalified or otherwise, to work on public utilities and other permit requirements are set and enforced by the City of Oklahoma City and are not within the control of the Owner, unless otherwise stated in the contract specifications. | | ornamental plan details mention match existing on site style and likeness; please confirm what the existing style is; location where can contractor go to see and verify style on site to match? Arrow Right Answer: The question is not clear about what is being referenced (maybe the ornamental fence??). Please clarify the question. The project site is currently open to the public. Any on-site observation that is needed is available at any time. | ornamental plan details mention match existing on site style and likeness; please confirm what the existing style is; location where can contractor go to see and verify style on site to match? Arrow Right Answer: The question is not clear about what is being referenced (maybe the ornamental fence??). Please clarify the question. The project site is currently open to the public. Any on-site observation that is needed is available at any time. | | Plumbing specs We only have plumbing spec sections 22 13 16 and 22 14 14. When we will expect more specs to be issued Arrow Right Answer: All plumbing specifications are included in the Project Manual. Please access the bidding documents through the official electronic bidding process (bidnetdirect.com). | Plumbing specs We only have plumbing spec sections 22 13 16 and 22 14 14. When we will expect more specs to be issued Arrow Right Answer: All plumbing specifications are included in the Project Manual. Please access the bidding documents through the official electronic bidding process (bidnetdirect.com). | | AWI Certification Requirements Could you waive the AWI Certification Requirements as long as we hold to AWI Specs? Arrow Right Answer: AWI Certification will NOT be waived. | AWI Certification Requirements Could you waive the AWI Certification Requirements as long as we hold to AWI Specs? Arrow Right Answer: AWI Certification will NOT be waived. | | Davis Bacon Which Davis Bacon reports are we to go off of? Arrow Right Answer: See OCAT 00110 of the Project Manual. | Davis Bacon Which Davis Bacon reports are we to go off of? Arrow Right Answer: See OCAT 00110 of the Project Manual. | | indoor chilled water insulation There is no schedule listed for indoor chilled water insulation thickness Arrow Right Answer: Hydronic piping insulation is typically based on the Maximum conductivity of the insulation rather than the thickness; if different materials are chosen the thickness will change to meet the minimum required conductivity. Please review (23 07 19 – 2.2 – Insulation materials. You may also refer to ASHRAE 90.1 – table 6.8.3-1 and 6.8.3-2 for typical insulation requirements. | indoor chilled water insulation There is no schedule listed for indoor chilled water insulation thickness Arrow Right Answer: Hydronic piping insulation is typically based on the Maximum conductivity of the insulation rather than the thickness; if different materials are chosen the thickness will change to meet the minimum required conductivity. Please review (23 07 19 – 2.2 – Insulation materials. You may also refer to ASHRAE 90.1 – table 6.8.3-1 and 6.8.3-2 for typical insulation requirements. | | Mullion Storm piping Note 3 on P-107 calls for 2" storm Drin Piping to ran in the structural Mullion, this will be nearly impossible to accomplish with cast iron pipe and fittings. 1. is it possible to get a piping isometric drawing for this? 2. Is PVC pipe and fittings acceptable at these locations? Arrow Right Answer: PVC will not be allowed; Type K soft copper will be acceptable per the FAA guidelines. | Mullion Storm piping Note 3 on P-107 calls for 2" storm Drin Piping to ran in the structural Mullion, this will be nearly impossible to accomplish with cast iron pipe and fittings. 1. is it possible to get a piping isometric drawing for this? 2. Is PVC pipe and fittings acceptable at these locations? Arrow Right Answer: PVC will not be allowed; Type K soft copper will be acceptable per the FAA guidelines. | | ELECTRICAL SPD'S On the drawings and in the specifications, there is no sizing for the SPD's. Please advise. Arrow Right Answer: E621, E622, E623, E624 panel schedules for SPD circuit size. | ELECTRICAL SPD'S On the drawings and in the specifications, there is no sizing for the SPD's. Please advise. Arrow Right Answer: E621, E622, E623, E624 panel schedules for SPD circuit size. | | Radio Quantities Division 275000 Section 2.2 states that three (3) VHF Single Channel Rack Mount Transmitters and two (3) VHF Single Channel Rack Mount Receivers shall be furnished. Is the intent to provide two or three Receivers? Arrow Right Answer: Provide Five (5) Transmitters & Four (4) Receivers due to standby requirement. | Radio Quantities Division 275000 Section 2.2 states that three (3) VHF Single Channel Rack Mount Transmitters and two (3) VHF Single Channel Rack Mount Receivers shall be furnished. Is the intent to provide two or three Receivers? Arrow Right Answer: Provide Five (5) Transmitters & Four (4) Receivers due to standby requirement. | | Radio Selection The language under Division 275000 Section 2.2 B states that the radios shall be General Dynamics CM-350 radios, which are typically sold as Transceiver units rather than individual Transmitters and Receivers. Is the intent to procure Transceivers or individual Transmitters and Receivers? If the intent is for individual Transmitters and Receivers, we would recommend the General Dynamics CM-300 series radios. Arrow Right Answer: Provide General Dynamics CM-300 Series radios. | Radio Selection The language under Division 275000 Section 2.2 B states that the radios shall be General Dynamics CM-350 radios, which are typically sold as Transceiver units rather than individual Transmitters and Receivers. Is the intent to procure Transceivers or individual Transmitters and Receivers? If the intent is for individual Transmitters and Receivers, we would recommend the General Dynamics CM-300 series radios. Arrow Right Answer: Provide General Dynamics CM-300 Series radios. | | UHF Requirement? Division 275000 Section 2.2 C lists a requirement for UHF, but none of the frequencies listed are UHF. Please confirm no UHF requirements are included? Arrow Right Answer: No UHF Frequency required. | UHF Requirement? Division 275000 Section 2.2 C lists a requirement for UHF, but none of the frequencies listed are UHF. Please confirm no UHF requirements are included? Arrow Right Answer: No UHF Frequency required. | | ATIS Frequency Division 275000 Section 2.2 C lists Tower, Ground, and Unicom frequencies but Division 275000 Section 2.2 B states that one of the radios shall be tuned to the ATIS/ASOS frequency. Please confirm the third frequency will be for ATIS and identify the frequency required for the ATIS channel. Arrow Right Answer: One transmitter is intended for ATIS frequency, which is 128.725 | ATIS Frequency Division 275000 Section 2.2 C lists Tower, Ground, and Unicom frequencies but Division 275000 Section 2.2 B states that one of the radios shall be tuned to the ATIS/ASOS frequency. Please confirm the third frequency will be for ATIS and identify the frequency required for the ATIS channel. Arrow Right Answer: One transmitter is intended for ATIS frequency, which is 128.725 | | Standby Radios Based on the quantities of Transmitters and Receivers required in Division 275000 Section 2.2, there are only “Main” radios accounted for with no “Standby” radios. It is typical for ATCTs to have “Standby” radios to fail over to in the event of a failure on a “Main” radio. Please confirm if “Standby” radios should be included. If the answer to our question about “Standby” radios is “yes”, the quantity of transmitters and receivers under Division 275000 Section 2.3 will need to be increased to five (5) and four (4) respectively and the antennas and cable kits required under Division 275000 Section 2.5 will need to be increased from four (4) to six (6). Arrow Right Answer: Confirming. Yes. In addition to quantities outlined in Q50 response, increase number of antennas and cable kits to six (6). | Standby Radios Based on the quantities of Transmitters and Receivers required in Division 275000 Section 2.2, there are only “Main” radios accounted for with no “Standby” radios. It is typical for ATCTs to have “Standby” radios to fail over to in the event of a failure on a “Main” radio. Please confirm if “Standby” radios should be included. If the answer to our question about “Standby” radios is “yes”, the quantity of transmitters and receivers under Division 275000 Section 2.3 will need to be increased to five (5) and four (4) respectively and the antennas and cable kits required under Division 275000 Section 2.5 will need to be increased from four (4) to six (6). Arrow Right Answer: Confirming. Yes. In addition to quantities outlined in Q50 response, increase number of antennas and cable kits to six (6). | | Backup Transceiver Division 275000 Section 2.3 calls for an IC-A220B but also states a requirement that the radio shall come with a battery backup. ACG recommends the TR-910MP to meet the emergency backup transceiver with the battery backup requirement. Please confirm if the specified radio will be switched from IC-A220B to TR-910MP. Arrow Right Answer: Provide TR-910MP, in lieu of IC-A220B | Backup Transceiver Division 275000 Section 2.3 calls for an IC-A220B but also states a requirement that the radio shall come with a battery backup. ACG recommends the TR-910MP to meet the emergency backup transceiver with the battery backup requirement. Please confirm if the specified radio will be switched from IC-A220B to TR-910MP. Arrow Right Answer: Provide TR-910MP, in lieu of IC-A220B | | TAX CLARIFICATION After several questions have been turned in that have not clearly answered the question, we are seeking a clear YES or NO if the job is to be bid with SALES TAX or to be bid without SALES TAX. Having recently done federally funded (even partial) jobs through the FAA's grant program for new towers and related airport improvements, a job requiring both Buy American and Davis-Bacon federally mandated wage rates is always exempt from sales tax. Previous answers to this question has stated funding is also somewhat through OCAT which is a trust. A job of this size, SALES TAX will be a large cost and it's important that we are provided a clear answer to this question because stating "refer to the specs" doesn't provide the information. Please advise if the project is SALES TAX EXEMPT or subject to SALES TAX. Arrow Right Answer: Please see response in questions 6 and 10. All payments to the Contractor will be made by OCAT. OCAT is a Tax Exempt entity. This means that the Contractor cannot charge OCAT sales tax, or any other tax, for the payments made to the Contractor. This Tax Exemption does not extend to the Contractor. This means that the Contractor is obliged to pay the sales tax charged to them by their vendors, suppliers, or other contractors. Another way to say it is that the Contractor must pay sales tax on the purchases they make, but the invoice submitted to OCAT for payment shall not include sales tax or any other tax (payroll tax, etc.). | TAX CLARIFICATION After several questions have been turned in that have not clearly answered the question, we are seeking a clear YES or NO if the job is to be bid with SALES TAX or to be bid without SALES TAX. Having recently done federally funded (even partial) jobs through the FAA's grant program for new towers and related airport improvements, a job requiring both Buy American and Davis-Bacon federally mandated wage rates is always exempt from sales tax. Previous answers to this question has stated funding is also somewhat through OCAT which is a trust. A job of this size, SALES TAX will be a large cost and it's important that we are provided a clear answer to this question because stating "refer to the specs" doesn't provide the information. Please advise if the project is SALES TAX EXEMPT or subject to SALES TAX. Arrow Right Answer: Please see response in questions 6 and 10. All payments to the Contractor will be made by OCAT. OCAT is a Tax Exempt entity. This means that the Contractor cannot charge OCAT sales tax, or any other tax, for the payments made to the Contractor. This Tax Exemption does not extend to the Contractor. This means that the Contractor is obliged to pay the sales tax charged to them by their vendors, suppliers, or other contractors. Another way to say it is that the Contractor must pay sales tax on the purchases they make, but the invoice submitted to OCAT for payment shall not include sales tax or any other tax (payroll tax, etc.). | | Duct Coating Metal Duct spec section 233113-2.4-G mentions a “Factory or Shop Applied Antimicrobial Coating” on the sheet metal ductwork. Per the specifications, the ductwork will be externally insulated with no duct liner. Is this antimicrobial coating required on this Wiley Post ATCT project? This was not required on the similar Max Westhiemer ATCT project. Arrow Right Answer: No, antimicrobial coatings will not be required. | Duct Coating Metal Duct spec section 233113-2.4-G mentions a “Factory or Shop Applied Antimicrobial Coating” on the sheet metal ductwork. Per the specifications, the ductwork will be externally insulated with no duct liner. Is this antimicrobial coating required on this Wiley Post ATCT project? This was not required on the similar Max Westhiemer ATCT project. Arrow Right Answer: No, antimicrobial coatings will not be required. | | Subcontractor Prequalification According to 506.02: “any Contractor and any subcontractor performing Work for which a Prequalification class has been established must also have obtained any Prequalification and must also obtain any Permit or Permits and any license or licenses required by the City of Oklahoma City, State or Federal Government which is/are necessary to the accomplishment of the Project. The Bidder must include in its Bid the cost of having a Prequalified Contractor or Prequalified subcontractor perform any Work for which a Prequalification classification has been created.” Please verify what if any trades will need to be prequalified and their level of prequalification. Arrow Right Answer: All Owner (OCAT) qualification and prequalification requirements are stated in Project Manual. The only "Prequalification" requirement established by the Owner (OCAT) is Building Contractor A as provided in the Project Manual and other bid documents. Please contact the City of Oklahoma City - Development Services for licensure, and other qualification or prequalification requirements required by the building permit. Please contact the City of Oklahoma City - Utilities Department for licensure, and other qualification or prequalification requirements required to perform work related to City Owned Utilities. Please contact the City of Oklahoma City - Public Works Department for licensure, and other qualification or prequalification requirements required to perform work related to City Owned Stormwater related systems. Please contract other State or Federal or Trade governing agencies to determine what trades require which licensure, and other qualification or prequalification. | Subcontractor Prequalification According to 506.02: “any Contractor and any subcontractor performing Work for which a Prequalification class has been established must also have obtained any Prequalification and must also obtain any Permit or Permits and any license or licenses required by the City of Oklahoma City, State or Federal Government which is/are necessary to the accomplishment of the Project. The Bidder must include in its Bid the cost of having a Prequalified Contractor or Prequalified subcontractor perform any Work for which a Prequalification classification has been created.” Please verify what if any trades will need to be prequalified and their level of prequalification. Arrow Right Answer: All Owner (OCAT) qualification and prequalification requirements are stated in Project Manual. The only "Prequalification" requirement established by the Owner (OCAT) is Building Contractor A as provided in the Project Manual and other bid documents. Please contact the City of Oklahoma City - Development Services for licensure, and other qualification or prequalification requirements required by the building permit. Please contact the City of Oklahoma City - Utilities Department for licensure, and other qualification or prequalification requirements required to perform work related to City Owned Utilities. Please contact the City of Oklahoma City - Public Works Department for licensure, and other qualification or prequalification requirements required to perform work related to City Owned Stormwater related systems. Please contract other State or Federal or Trade governing agencies to determine what trades require which licensure, and other qualification or prequalification. | | Buy American Please clarify the Buy American requirements to be BABA or BAA Arrow Right Answer: Please see OCAT 00020-1, OCAT 00105-1, and OCAT 00250-1 of the Project Manual. BABA is the applicable Buy American law for this project. | Buy American Please clarify the Buy American requirements to be BABA or BAA Arrow Right Answer: Please see OCAT 00020-1, OCAT 00105-1, and OCAT 00250-1 of the Project Manual. BABA is the applicable Buy American law for this project. | | Split Systems Could we get LG approved as a manufacture for mini split systems Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Split Systems Could we get LG approved as a manufacture for mini split systems Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | DOAS Manufacture Could we get JCI/York approved as a DOAS manufacture? Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | DOAS Manufacture Could we get JCI/York approved as a DOAS manufacture? Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | Substitution Request - Computer Room Split Units Please see the below link for substitution Request Substitution Request - Computer Room Split Units https://www.dropbox.com/scl/fi/blt4v1guwzpoobqu7hctb/AboveAir-Substitution-Request-Air-Traffic-Control-Tower-071526.pdf?rlkey=smlz22962wlfi37pft5xse4bw&st=hz3igktv&dl=0 Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Substitution Request - Computer Room Split Units Please see the below link for substitution Request Substitution Request - Computer Room Split Units https://www.dropbox.com/scl/fi/blt4v1guwzpoobqu7hctb/AboveAir-Substitution-Request-Air-Traffic-Control-Tower-071526.pdf?rlkey=smlz22962wlfi37pft5xse4bw&st=hz3igktv&dl=0 Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | Substitution Request - Computer Room Chilled Water AHU Please see the below link for substitution Request Substitution Request - Computer Room Chilled Water AHU https://www.dropbox.com/scl/fi/bodpacxah1u54g7g1nfpw/Krueger-Substitution-Request-Air-Traffic-Control-Tower-071526.pdf?rlkey=fy9hkm6j64oq3gnfh2fgt5u4d&st=f7xp49ng&dl=0 Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Substitution Request - Computer Room Chilled Water AHU Please see the below link for substitution Request Substitution Request - Computer Room Chilled Water AHU https://www.dropbox.com/scl/fi/bodpacxah1u54g7g1nfpw/Krueger-Substitution-Request-Air-Traffic-Control-Tower-071526.pdf?rlkey=fy9hkm6j64oq3gnfh2fgt5u4d&st=f7xp49ng&dl=0 Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | Substitution Request - Split System Air Conditioners Please see the below link for substitution Request Substitution Request - Split System Air Conditioners https://www.dropbox.com/scl/fi/fjncfhqqyvirpo6b17l4l/MSM-Gree-Subsitution-Request-Air-Traffic-Control-Tower-071526.pdf?rlkey=jzabtnhueiub12bj9wn44giwq&st=t9tjzh11&dl=0 Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Substitution Request - Split System Air Conditioners Please see the below link for substitution Request Substitution Request - Split System Air Conditioners https://www.dropbox.com/scl/fi/fjncfhqqyvirpo6b17l4l/MSM-Gree-Subsitution-Request-Air-Traffic-Control-Tower-071526.pdf?rlkey=jzabtnhueiub12bj9wn44giwq&st=t9tjzh11&dl=0 Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | 2 hours circuit In the low voltage electrical power conductors and cables section 3.2 H is states to utilized a 2 hours circuit, does the entire system including raceways and connectors have to be rated for 2 hours or is it limited to the cable only? Arrow Right Answer: The specific section called out above requires 2 hour rated conductors (fire resistive cable) or equal. Refer to 260533 for conduit/raceway, connector requirements. | 2 hours circuit In the low voltage electrical power conductors and cables section 3.2 H is states to utilized a 2 hours circuit, does the entire system including raceways and connectors have to be rated for 2 hours or is it limited to the cable only? Arrow Right Answer: The specific section called out above requires 2 hour rated conductors (fire resistive cable) or equal. Refer to 260533 for conduit/raceway, connector requirements. | | Roller Shades in the CAB Can you please confirm that both roller shades in the CAB are manual only, not motorized. Arrow Right Answer: Please provide one motorized and one manual operated shades as dictated in the drawings. | Roller Shades in the CAB Can you please confirm that both roller shades in the CAB are manual only, not motorized. Arrow Right Answer: Please provide one motorized and one manual operated shades as dictated in the drawings. | | Mech substitution request This link has substitution requests we would like to be considered https://engineeredequipmentinc-my.sharepoint.com/:f:/g/personal/rmyles_eei-ok_com/IgDHhfaLp4t_RY1va5NRyXMGAccBWeqx6qUBAbE4bvvQUEg?e=aZbGXS The password is EEIhvac12#$ Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Mech substitution request This link has substitution requests we would like to be considered https://engineeredequipmentinc-my.sharepoint.com/:f:/g/personal/rmyles_eei-ok_com/IgDHhfaLp4t_RY1va5NRyXMGAccBWeqx6qUBAbE4bvvQUEg?e=aZbGXS The password is EEIhvac12#$ Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | Aluminum access floor system Sec. 096900-2.3 is calling for an aluminum access floor system. Previously installed access floors for ATCT projects have been the standard access floor systems (lightweight cementitious fill inside welded steel pan). Aluminum access floors are more expensive and aren’t as readily available. Please advise if the aluminum system is required. Arrow Right Answer: Please provide aluminum access floors as specified. | Aluminum access floor system Sec. 096900-2.3 is calling for an aluminum access floor system. Previously installed access floors for ATCT projects have been the standard access floor systems (lightweight cementitious fill inside welded steel pan). Aluminum access floors are more expensive and aren’t as readily available. Please advise if the aluminum system is required. Arrow Right Answer: Please provide aluminum access floors as specified. | | Substitution Request Spec Section 074213.16 Please see the Substitution Request at the Link Below. https://championsystemsoklahomacom.sharepoint.com/:f:/s/ChampionPublic/IgAEpKpmHtGdRp_p9mykJqDHAar8ZnyjBEaWGqbvR0K3X_w?e=fdXt7a Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | Substitution Request Spec Section 074213.16 Please see the Substitution Request at the Link Below. https://championsystemsoklahomacom.sharepoint.com/:f:/s/ChampionPublic/IgAEpKpmHtGdRp_p9mykJqDHAar8ZnyjBEaWGqbvR0K3X_w?e=fdXt7a Arrow Right Answer: No exception taken to the use of alternate manufacturer submitted – IT WILL BE UP TO THE CONTRACTOR TO VERIFY CLEARANCES. Technical requirements to be reviewed during the shop drawing phase during construction. Must comply with project specifications. | | ELEVATOR QUESTIONS 1. Elevator Door Opening Configuration Please confirm the intended elevator door configuration. • Drawing A-451 appears to indicate a side-opening entrance. • However, Specification Section 142123.16 – Machine Room-Less Electric Traction Passenger Elevators, Paragraph 1.04.O, specifies a center-opening door arrangement. Please confirm whether the elevator is intended to be provided with a side-opening or center-opening entrance. 2. Optional Features / Value-Added Items Please advise if there have been any updates regarding the optional features identified within Specification Section 142123.16 – Machine Room-Less Electric Traction Passenger Elevators. At this time, several specification requirements appear to be optional selections and will be carried as Value-Added (VA) options unless otherwise directed. Please provide any guidance regarding which optional items should be included in the base scope versus identified separately as alternates or options. 3. Elevator Capacity vs. Hoistway Size During our review, we noted a potential discrepancy between the specified elevator capacity and the dimensions shown on the drawings. • The specifications appear to have been written around a Gen3 Edge 4000 lb Passenger elevator. • However, the drawn hoistway dimensions appear to correspond more closely with a 3500 lb elevator configuration. • The architectural shaft dimensions shown do not appear consistent with the dimensional requirements typically associated with the specified 4000 lb passenger elevator. Please clarify the design intent: • Will the hoistway be revised/widened to accommodate the specified 4000 lb elevator, or • Will the elevator specification be revised to align with the currently drawn hoistway dimensions and a smaller capacity elevator? Confirmation of the intended elevator capacity and corresponding hoistway dimensions will help ensure accurate pricing and coordination of the elevator equipment. Arrow Right Answer: 1. We have side-opening entrance. 2. Please bid based on the specification regarding optional features. 3.The elevator capacity is 3500lb. | ELEVATOR QUESTIONS 1. Elevator Door Opening Configuration Please confirm the intended elevator door configuration. • Drawing A-451 appears to indicate a side-opening entrance. • However, Specification Section 142123.16 – Machine Room-Less Electric Traction Passenger Elevators, Paragraph 1.04.O, specifies a center-opening door arrangement. Please confirm whether the elevator is intended to be provided with a side-opening or center-opening entrance. 2. Optional Features / Value-Added Items Please advise if there have been any updates regarding the optional features identified within Specification Section 142123.16 – Machine Room-Less Electric Traction Passenger Elevators. At this time, several specification requirements appear to be optional selections and will be carried as Value-Added (VA) options unless otherwise directed. Please provide any guidance regarding which optional items should be included in the base scope versus identified separately as alternates or options. 3. Elevator Capacity vs. Hoistway Size During our review, we noted a potential discrepancy between the specified elevator capacity and the dimensions shown on the drawings. • The specifications appear to have been written around a Gen3 Edge 4000 lb Passenger elevator. • However, the drawn hoistway dimensions appear to correspond more closely with a 3500 lb elevator configuration. • The architectural shaft dimensions shown do not appear consistent with the dimensional requirements typically associated with the specified 4000 lb passenger elevator. Please clarify the design intent: • Will the hoistway be revised/widened to accommodate the specified 4000 lb elevator, or • Will the elevator specification be revised to align with the currently drawn hoistway dimensions and a smaller capacity elevator? Confirmation of the intended elevator capacity and corresponding hoistway dimensions will help ensure accurate pricing and coordination of the elevator equipment. Arrow Right Answer: 1. We have side-opening entrance. 2. Please bid based on the specification regarding optional features. 3.The elevator capacity is 3500lb. | | Substitution Request - Translucent Wall Panels Please see the below link for substitution Request Substitution Request - Translucent Wall Panels https://www.dropbox.com/scl/fi/rprxb60pznhkf140k79zw/Substitution-Request-kingspan-pentaclad-flush-cladding-screen-walls-MAPS4.pdf?rlkey=a3b8rhp3gr7k0ju6n1x6695ym&dl=0 Arrow Right Answer: Substitution item rejected. It appears this product does not apply to this project. No translucent wall panels specified. | Substitution Request - Translucent Wall Panels Please see the below link for substitution Request Substitution Request - Translucent Wall Panels https://www.dropbox.com/scl/fi/rprxb60pznhkf140k79zw/Substitution-Request-kingspan-pentaclad-flush-cladding-screen-walls-MAPS4.pdf?rlkey=a3b8rhp3gr7k0ju6n1x6695ym&dl=0 Arrow Right Answer: Substitution item rejected. It appears this product does not apply to this project. No translucent wall panels specified. | **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 1 | 07/24/2026 03:56 PM EDT | | **Communications**: - Communication No.1 - 07/22/2026 01:26 PM EDT - Communication Documents - Document: WPA 2403 ATCT Pre-Bid Minutes.pdf - Document: WPA Construct New ATCT Pre-Bid Sign-in Sheet.pdf
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.