SLED Opportunity · TEXAS · TARRANT REGIONAL WATER DISTRICT

    Construction Management Services

    Issued by Tarrant Regional Water District
    educationSource SoughtTarrant Regional Water DistrictSol. 242576
    Closed
    STATUS
    Closed
    due Apr 22, 2026
    PUBLISHED
    Mar 9, 2026
    Posting date
    JURISDICTION
    Tarrant Regional
    education
    NAICS CODE
    541310
    AI-classified industry

    AI Summary

    TRWD seeks qualified firms for Construction Management Services via Statements of Qualifications. Fee estimates should not be included. The scope is preliminary and open to vendor recommendations.

    Opportunity details

    Solicitation No.
    242576
    Type / RFx
    Source Sought
    Status
    open
    Level
    education
    Published Date
    March 9, 2026
    Due Date
    April 22, 2026
    NAICS Code
    541310AI guide
    State
    Texas
    Agency
    Tarrant Regional Water District

    Description

    TRWD is hereby inviting Statements of Qualifications (SOQs) from qualified firms to provide services for Construction Management Services.Do not provide any fee estimates, pricing or billing rate information as part of the SOQ submittal.

    The Scope of Work is not comprehensive. Rather, it represents what TRWD anticipates will be needed for this project. Prospective vendors may recommend improvements to the scope in the project approach section of their SOQ (Statements of Qualifications). The selected firm will prepare a comprehensive scope that will be negotiated with TRWD.

    Project Details

    • Reference ID: 26-076
    • Department: Infrastructure Engineering
    • Department Head: Jason Gehrig (Infrastructure Engineering Director)

    Important Dates

    • Questions Due: 2026-04-14T22:00:00.000Z
    • Pre-Proposal Meeting: 2026-03-23T15:00:00.000Z — https://teams.microsoft.com/meet/23185167607705?p=cgpCF4GtERKnq59rGD

    Evaluation Criteria

    • Firm Expertise and Philosophy (15 pts)
    • Approach (15 pts)
    • Schedule, Cost, and Quality Control Philosophies (20 pts)
    • Key Personnel Experience and Commitment (25 pts)
    • Firm Experience Record and References (25 pts)

    Submission Requirements

    • Proposal (required)
    • Conflict of Interest Questionnaire (required)

      Complete the form, sign and date where indicate. We are required to have a completed copy of the CIQ form to be signed and dated even if there is(are) no conflict(s). Form is not considered complete unless signed and dated.

    • Form 1295 – Certificate of Interested Parties (required)

      Complete form online at https://www.ethics.state.tx.us/filinginfo/1295/ using the following assigned identification number and description for this Project: 

      26-076   

      Construction Management Services

      Upload completed form to include certificate number and signature.

      ***FYI – The “Affidavit” section has been replaced and is now the “Unsworn Declaration”.  This Section will require the date of birth and address of the authorized representative signing the form.  The change in law applies to contracts entered into, renewed, or amended on or after January 1, 2018.

    • Agreement- PSA

      Provided as a reference only; this agreement will be used with the awarded vendor. 

    • Does the Standard Contract Term apply? (required)
    • Please provide the initial term of the contract. (required)

      Example: nine (9) months

    • Will there be a pre-proposal meeting? (required)
    • Will your pre-proposal meeting be: (required)

    Questions & Answers

    Q (Clarification on Section 5.1. Scope of Work): Regarding RFSOQ Section 5.1 (Scope of Work), is the scope of work inclusive of ALL the outlined projects (CC Section II Phase 2, CC Section IV, JP Section 1&6, AND RC/CC Electrical Buildings) or can the respondent choose to submit only on a selected few projects from that list?

    A: Firms are allowed to propose services on either one, two, three, or all four projects. TRWD does not intend to select a program-wide construction management team for these projects.


    Q (No subject): Since proposers may submit on multiple projects under this RFQ, can TRWD confirm whether Item 8, Section 3 requires three (3) reference projects total, regardless of the number of projects we're submitting on?

    A: Firms must submit three reference projects regardless of the total number of projects proposed. Additional references are permitted if required to demonstrate the firm’s overall experience.


    Q (No subject): Regarding section 5.1 of this RFQ, it states that the maximum allowable multiplier on raw salary is 2.85. With various companies operating their overhead uniquely, will TRWD entertain the industry practice of using the FAR audited overhead (OH) rate plus a set profit percentage to calculate the multiplier? Many DOT’s do this practice to appropriately cover the government audited OH rate of each company and only paying a set profit percentage. Texas, Kansas, Oklahoma, and Arkansas Departments of Transportation are relative practices to compare to. This would provide an equitable transparent payment for all consultants respective to their overhead.

    A: No, TRWD will not be using the FAR audited overhead rate plus a set profit percentage to calculate the raw salary multiplier.


    Q (Resumes): Section 8 of the RFQ mentions the ability to use an appendix for additional information outside the 18-page limit. Are resumes allowed to be included in the appendix and excluded from the overall 18-page limit?

    A: Resumes should be included in the 18-page limited SOQ and not in the appendix.


    Q (Clarification on Section 5.1 Scope of Work): Scope states: "Owner will contract directly with companies who provide construction material testing and specialized inspection of pipe, valves, and welds." Can you please confirm that construction material testing services, including field testing, are not expected to be performed under this contract?

    A: TRWD will provide material testing through a separate contract already in place. These services include field testing and inspection for certified welds, soil compaction, and concrete/HMAC. Other services already under contract include pipe plant manufacturing welding audits and lining/coating application testing.


    Q (Form 1295 ): Should confirmation of submitting Form 1295 on the TX Ethics website go behind the Conflict of Interest Questionnaire?

    A: That can be submitted in #3 of the vendor submittal section.


    Q (Staff Roles): Section 5.2 (TRWD Staff and Roles on Project) identifies TRWD Project Managers, Construction Managers, and Others for the listed projects. Please clarify the intended role of TRWD Construction Managers relative to the selected Construction Management firm. Specifically, will TRWD Construction Managers be integrated into the Construction Management firm’s team to provide overall construction management for these projects, or will they be supplementing and supporting the construction management services provided by the firm selected under this RFQ?

    A: TRWD Construction Managers are not intended to be integrated into the Construction Management firm’s project team. TRWD Construction Managers will be providing owner-level oversight, coordination with internal TRWD departments, and ensuring compliance with TRWD policies.


    Q (Names of Principals in the Firm): For the Names of Principals in the Firm requirement in Section 1. Are you looking for a list of project principals or firm executive suite principals?

    A: TRWD response should be “TRWD would like see names of project principals.


    Q (No subject): If our firm is proposing services for multiple projects, do we submit one consolidated response (not to exceed 18 pages) or multiple, individual responses, one for each project?

    A: A single SOQ is preferred, regardless of whether the firm is proposing on one project or multiple projects.


    Q (No subject): Will the pre-proposal presentation slides be made available to download?

    A: A presentation was not used for this meeting.


    Key dates

    1. March 9, 2026Published
    2. April 22, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.