Active SLED Opportunity · ARIZONA · CITY OF PRESCOTT
AI Summary
The City of Prescott seeks a qualified firm for CMAR preconstruction and construction services for a $25M project involving effluent and wastewater pipeline replacement and State Route 89 roadway improvements. Design completes by Feb 2027; construction from Mar 2027 to end of 2028. Evaluation based on firm experience, personnel, and project approach.
The City of Prescott is seeking a qualified firm to provide design phase preconstruction services and construction services as the Construction Manager at Risk (CMAR) for the Effluent and Wastewater Pipelines and State Route 89 Roadway Improvements project.
The estimated project construction cost is approximately $25M, including the cost for a new replacement 24-inch effluent force main, a new 24-inch gravity sewer line, and State Route 89 road work including safety, operation, and capacity improvements which include above grade rock removal, roadway improvements, cross-traffic intersection improvements including grade adjustment, sight visibility lines, and turn restrictions, limited turn lanes, a realignment of the southbound approach lanes to the Willow Lake Road roundabout, a north to south turnaround near the midway point between the Willow Lake Road and Phippen Trail roundabouts, an extension of the southbound merge lane south of the Phippen Trail roundabout, and a frontage road on the northbound side of the roadway just north of the Willow Lake Road roundabout.
The project is currently 15% designed and the design consultant, Kimley-Horn and Associates, Inc. plans to complete design by February 2027. The City would like to start construction in March 2027 and complete construction by the end of 2028.
The project is an important part of the City's centralization effort by replacing an undersized and failing effluent pipeline and adding a second wastewater pipeline in the State Route 89 corridor. Once complete, the project will increase pipeline capacity and centralize wastewater treatment and effluent distribution from the Airport Water Reclamation Facility (AWRF). The project will also make roadway improvements to help improve safety, including cross-traffic roadway access and visibility along and at intersections, and improve and maintain efficient traffic flow.
| Event | Date | Location |
|---|---|---|
| Proposal Opening Date | 2026-06-11T21:01:00.000Z | Vendors can see which companies have submitted a response to a solicitation by navigating to the Followers tab within the OpenGov Procurement Portal. In the Response Submitted column, a checkmark (✓) indicates that the vendor has successfully submitted a response. Vendors without a checkmark have not submitted a response. |
Describe your firm’s subcontractor selection plan and process. The plan should demonstrate how subcontractors will be selected in accordance with A.R.S. § 34-605.
How does your firm interpret and operationalize the "at Risk" component of a Guaranteed Maximum Price (GMP) CMAR contract. Specifically, how is risk genuinely managed through contingencies versus managed through change orders? Provide examples that illustrate how your firm distinguished between contractor-held risk and a potential change order due to an incomplete or unclear construction document item.
The selection committee member reviewing the Statement Of Qualifications submittal shall determine the points awarded for this item. The firm submitting will not address or respond to the item.
Please upload a cover letter indicating interest in providing services.
Your cover letter shall not exceed one (1) page and is exclusive of the page count limitation for the Statement Of Qualification. The letter shall be on the firm’s company letterhead and shall be signed by an officer or principal of the firm with contracting authority.
What is the full name of the point of contact for your Statement of Qualifications?
What is the official title/position of the point of contact for your Statement of Qualifications?
What is the email address of the point of contact for your Statement of Qualifications?
What is the full phone number of the point of contact for your Statement of Qualifications? Please be sure to include the area code.
Please upload your COMPLETE Statement of Qualifications (PDF format) and all required documentation here, formatted in the manner required by this Request for Statement Of Qualifications.
Please provide the full physical/mailing address of your firm including City, State, and ZIP Code.
If there are multiple locations, please provide.
Please provide the full names of all Principals of the firm on this Statement of Qualifications.
Please indicate your areas of interest in this Request. Select all areas for which you wish to have your Statement of Qualifications evaluated.
Please upload a statement of the firm’s understanding of the purpose and scope of each applied service category.
Please upload a description of specific technical capabilities, qualifications, and years of prior experience for each applied service category.
Please upload a brief resume for key project team members outlining their credentials and experience for each applied service category.
Please upload, in PDF format, a brief resume for key project team members outlining their credentials and experience.
Please upload a description of at least three (3) but no more than five (5) similar projects in which the firm participated for each applied service category. Describe the firm’s role in the project and scope of work that demonstrates the firm’s expertise. Provide the name and contact information for each project.
Please upload a description of how the firm would approach, manage, and complete related projects for each applied service category.
Please provide a list of applicable Arizona professional licenses held, including license numbers, and note whether licenses are held by firm or individuals.
Please provide a list of projects currently under contract with other government agencies. Be sure to provide a brief description of each project listed.
I hereby certify that the firm is bondable to the projected amount of the project from an AM Best, Inc. rating of “A” or better surety company if the firm is awarded the contract.
I hereby certify that I am fully aware of Insurance Requirements contained in the contract documents for the solicitation and by the submission of this Offer, I hereby assure the City that the firm is able to produce the insurance coverage required if awarded the contract.
If the firm is awarded the contract and then becomes unable to produce the insurance coverage specified within ten (10) working days, I am fully aware and understand that this will make my submission nonresponsive and I/the firm will be disqualified for this project.
For any additional information requested or required by any of your provided answers please upload additional documentation (PDF format) here.
Respondent confirms that they have the authority to submit on behalf of the stated company and have furnished any documentation necessary as proof of such authority.
Is this RSOQ for a single type of service or for multiple categories of service?
What is the first date to advertise the legal notice?
Example:
December 7, 2026
What is the first date to advertise the legal notice?
Example:
December 14, 2026
Will there be a pre-proposal conference for this RSOQ? If so, will it be Mandatory or Non-Mandatory?
NOTE: You will have to manually adjust this in the Timeline section of this RSOQ. Your answer here will NOT automatically adjust the Timeline.
What is the initial contract term for those awarded as a result of this RSOQ?
Be sure to state written and numeric values of unit of duration.
Answer as if you are filling in the highlighted area below:
EXAMPLE
one (1) year
The initial term of the contract shall be for a period of ________.
What is the minimum duration for which this contract can be extended after the expiration of the initial term?
Be sure to state written and numeric values of unit of duration.
Answer as if you are filling in the highlighted area below:
EXAMPLE
one (1) year
The contract may be extended for an additional __________ period up to a total of _________ additional years...
What is the maximum duration for which this contract can be extended after the expiration of the initial term?
Be sure to state written and numeric values in terms of number of years (without typing the word "years").
Answer as if you are filling in the highlighted area below:
EXAMPLE
four (4)
The contract may be extended for an additional __________ period up to a total of _________ additional years...
What is the minimum number of qualified candidates you will be awarding per category as a result of this RSOQ?
Be sure to state written and numeric values.
Answer as if you are filling in the highlighted area below:
EXAMPLE
three (3)
the committee shall rank the firms to generate a final list of at least _______ but no more than _______ firms. I
What is the maximum number of qualified candidates you will be awarding per category as a result of this RSOQ?
Be sure to state written and numeric values.
Answer as if you are filling in the highlighted area below:
EXAMPLE
five (5)
the committee shall rank the firms to generate a final list of at least _______ but no more than _______ firms. I
As part of a firm's SOQ they are required to submit a cover letter. What is the maximum number of pages you will allow for this cover page?
Your answer here will fill in the blank of the statement below:
Your cover letter shall not exceed ______ pages and is exclusive of the page count limitation for the SOQ.
NOTE: Be sure to write the number in both written and numeric format as shown in the following example but do not use the word "pages":
EXAMPLE
two (2)
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.