SLED Opportunity · NORTH CAROLINA · NORTH CAROLINA

    Construction Manager at Risk (CMAR) Services

    Issued by GOTRIANGLE
    stateRFQnorth carolinaSol. 9429baec-c57a-f111-ab0e-001dd802e1e9
    Closed
    STATUS
    Closed
    PUBLISHED
    Jul 8, 2026
    Posting date
    JURISDICTION
    north carolina
    state
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    GoTriangle seeks qualified firms for Construction Manager at Risk services to expand and renovate the Nelson Road Bus Operations and Maintenance Facility, with a project budget of approximately $35.2 million and federal funding support.

    Opportunity details

    Solicitation No.
    9429baec-c57a-f111-ab0e-001dd802e1e9
    Type / RFx
    RFQ
    Status
    Open
    Level
    state
    Published Date
    July 8, 2026
    Due Date
    NAICS Code
    236220AI guide
    Jurisdiction
    north carolina
    Agency
    GOTRIANGLE

    Description

    In accordance with N.C.G.S. § 143-129, through this Request for Qualifications (RFQ), GoTriangle seeks to contract with a qualified firm capable of delivering high-quality, cost-effective Construction Manager at Risk (CMAR) services that support GoTriangle's mission to provide safe, reliable, and equitable public transportation throughout the region. GoTriangle’s 2022 Regional Fleet & Facility Study concluded that expanding, renovating, and modernizing the existing Nelson Road Bus Operations and Maintenance Facility (BOMF) is the most cost-effective approach to meet current and future fleet and service expansion needs over the facility’s anticipated 40+ year service life. The study evaluated existing conditions, future operational needs, and potential facility alternatives and developed a conceptual (approximately 15% level) design, preliminary construction phasing approach, and planning-level cost estimate. The current planning-level project budget is approximately $35.2 million (2022 dollars), inclusive of design, construction, and contingency. The project is also reflected in regional transit capital plans at approximately $40 million (2023 dollars). GoTriangle has initiated environmental review under the National Environmental Policy Act (NEPA) with the Federal Transit Administration (FTA) and anticipates a Categorical Exclusion determination. The project is supported by federal funding sources, including grants for low- and no-emission vehicles and electric charging infrastructure, and additional discretionary funding opportunities may be pursued. GoTriangle will utilize a Construction Manager at Risk (CMAR) project delivery method for the design and construction of the GoTriangle Building Operations and Maintenance Facility (project).

    Key dates

    1. July 8, 2026Published

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.