Texas Facilities Commission seeks a Construction Manager-at-Risk for pre-construction and construction management services to upgrade the Central Utility Plant at Texas School for the Deaf, including mechanical system and piping improvements, with a project cost of $24.5M and a contract term of approximately 640 days.
1. SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by theTexas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to provide Pre-Construction and construction management services for Project #25-035-3303, Texas School for the Deaf, Central Utility (CUP) South Improvements project located at 1102 S Congress Ave,Austin, Texas, 78704 hereinafter described as the “Project”. This Project will be administered by TFC. This procurement will be a two-step award process witha two-part work requirement.A. Step One of the solicitation will include a submittal of company experience and qualifications focusing on projects of similar size and type. Respondents will be evaluated on experience and qualifications, as detailed in Section V, Submission Requirements. Only the highest ranked 5 or fewer Respondents will be shortlisted based on this evaluation and invited to participate in interviews. Based on the interviews, the short-listed firms may beinvited to participate in Step Two.B. Step Two of the solicitation will include the short-listed firms participating in interviews. The short-listed firms participating in the interviews may be requested to submit pricing information related to indirect construction costs as detailed in Section V, Submission Requirements.2. COST OF WORK: Respondents to the RFQ should consider the “Cost of Work” as Twenty-four Million Four Hundred Seventy-five Thousand dollars ($24,475,000), not including any Pre-construction Management fees, Construction Management fees, and Construction General Conditions.3. CONTRACT TERM: Construction is required to commence within fifteen(15) calendar days after the Notice to Proceed for Construction is issued. For planning purposes, the pre-construction time period is estimated to be One-hundred Eighty (180) calendar days. The construction contract period is projected for a term of four hundred sixty (460) for a total contract term of six hundred forty (640) calendar days except as may be otherwise amended or negotiated.PROJECT DESCRIPTION: The project encompasses a comprehensive upgrade of the existing Central Utility Plant (CUP) and associated infrastructure at the Texas School for the Deaf (TSD) campus. The CUP provides chilled and heating water thermal utilities to twenty buildings, including educational facilities, dormitories, administrative offices, gyms, and the campus auditorium.Due to increasing thermal loads from past and planned campus expansions, the CUP and related systems have reached maximum operational capacity.The proposed improvements are essential to ensuring adequate capacity, system reliability, and energy efficiency to support current and future campus needs.Central Utility Plant (CUP) UpgradesIncrease chilled water capacity from 1,600 tons to 3,000 tonsIncrease heating water system input capacity from 18,000 MBH to 30,000 MBHUpgrade plant ventilation and conditioning systems to support higher performance and system longevityReplacement of aging mechanical components nearing or beyond their service life (original 1994 installations)Site Distribution Piping ImprovementsReplace select sections of existing piping, especially near the CUP, with larger diameter piping to accommodate growing cooling demandReinsulate piping within utility trenches where deterioration is observed, per Texas Facilities Commission reportsImprove distribution efficiency to reduce thermal losses and maintenance costsBuilding Pump System UpgradesReplace outdated building pumps with modern, high-efficiency variable speed systemsIntegrate control sequences compatible with the upgraded CUP systemsReconfigure outdated piping and valve arrangements to improve flow distribution and achieve proper ΔT (temperature differential) across the networkAncillary Work and System OptimizationEvaluate and rebalance exhaust and outside airflows to enhance building ventilation and energy efficiencyRevise control sequences to reduce unnecessary cooling/heating loads from over-ventilation and outdated automation logicConduct comprehensive system commissioning and testing to verify proper operation and integration across all connected buildings1. ASBESTOS ABATEMENT: For the consideration of this RFQ, TFC is assessing any known asbestos materials in the existing facility to be abated prior to demolition and construction. Any asbestos abatement of the building is to be considered outside of the construction contract and budget of this RFQ. Any required abatement will be either negotiated with the CMR awarded the contract or addressed by TFC separately.THIRD PARTY TESTING: TFC shall provide or contract with third party for Testing and Balancing Services, RAS Review, Commissioning from a Commissioning Authority (CxA), Building Enclosure Commissioning (BECx), and Construction Materials Testing1. SCHEDULEOF EVENTS: TFC reserves the right to change the dates shown below upon written notification.EVENTDATEIssue RFQ2/18/2026Mandatory Pre-Submittal Teleconferences1st PSC2nd PSC 2/24/2026, 10:30 AM CT2/25/2026, 10:00 AM CTDeadline for Submission of Questions3/3/2026Deadline for Submission of Qualifications and HSP3/17/2026, 3:00 PMNotification of Short List/Interview Selection3/27/2026Site Visit4/02/2026Interviews4/06/2026,Deadline for Submission of Step 2 Pricing Proposals4/13/2026, 3:00 PMAward by Commission5/21/2026, 9:00 AMExecute Contract6/15/20262. MANDATORY PRE-SUBMITTAL TELECONFERENCES: Mandatory pre-submittal teleconferences will beheld on Tuesday, February 24, 2026 at 10:30 AM CT and Wednesday, February 25, 2026 at 10:00 AM CT. Pre-registration is required to participate in the teleconference. Respondents must have an employee of their firm attend at least one (1) of the two (2) pre-submittal conferences. TFC shall reject qualifications submitted by firms that did not attend one of the mandatory pre-submittal conferences.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.